Permit #2023010424
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7037-01350-0520 |
| Block: 01350 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-503-0666 |
| Location Address: 36 LONDONDERRY DR |
| Type: DR - DRIVEWAY |
| Issue Date: 02/03/2023 |
| NOC: Unknown |
| Applicant name: ANTONIO M PAIVA |
| Owner: PHOEUN SOPHAL & SAKUN HONG |
|
Address 36 LONDONDERRY DRIVE PALM COAST, FL 32137 |
| Lot: 0520 |
| Contracted Stated Job Value: ¤2,000.00 |
| Job Description: 8 1/2 FEET OF CONCRETE DRIVEWAY LEFT SIDE |
| Type: CN |
Contractor
AVANTI CONCRETE PUMPING INC
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 351743 SATSUMA, FL 32189 |
386-503-0666 | 386-586-7687 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 04/11/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 04/04/2023 | FINAL APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 04/04/2023 | FINAL APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 03/03/2023 | APPROVED | PFLANAGAN |
| Note: 3/2/2023 - PREVIOUS INSPECTION NOTES THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE SEE PHOTOS FOR INSPECTION RESULTS | |||
| ROW- PRE-APRON (PRE-POUR) | 03/02/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE SEE PHOTOS FOR INSPECTION RESULTS |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/23/2023 | 01/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/10/2023 | 01/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 01/10/2023 | 01/18/2023 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/10/2023 | 01/10/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Proposed driveway cannot be poured up to front entry of home. The driveway widening would be allowed even with the garage then you would have to have a walkway connecting the new driveway to front entry. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/10/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/03/2023 |
| SITE PLAN 15 | ¤15.00 | 02/03/2023 |
| ADJUSTMENT 50% | (¤15.00) | 02/03/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/03/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 02/03/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤330.00 |