I want to search for...

Permit #2023010627

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7002-00010-0110
Block: 00010
Subdivision: 2218 - SECTION 2-FLORIDA PARK
Job Phone: 386-793-6919
Location Address: 21 FARRADAY LN
Type: DR - DRIVEWAY
Issue Date: 02/15/2023
NOC: RECORDED
Applicant name: BRIAN A RUTHERFORD
Owner: LEE SIDNEY H & LISA K LEE H&W

Address

21 FARRADAY LN

PALMC OAST, FL 32137

Lot: 0110
Contracted Stated Job Value: ¤10,250.00
Job Description: Replace existing concrete driveway
Type: CN

Contractor

CREATIVE TOUCH CONCRETE SURFACING, LLC
Status Location Address Phone
ACTIVE

1 CARDWELL COURT

PALM COAST, FL 32137

386-793-6919

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 03/10/2023 APPROVED PFLANAGAN
ROW - FINAL INSPECTION 03/10/2023 FINAL APPROVED PFLANAGAN
U -UTILITY RESIDENTIAL FINAL 03/10/2023 FINAL APPROVED DHANEY
ROW- PRE-APRON (PRE-POUR) 02/21/2023 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY ------------------------------------------------------------------------------------- 2/17/2023 - PREVIOUS INSPECTION NOTES THERE ARE AREAS IN THE POURING AREA THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" IN THE RIGHT OF WAY
ROW- PRE-APRON (PRE-POUR) 02/17/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE ARE AREAS IN THE POURING AREA THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" IN THE RIGHT OF WAY

Review History

Department Status Date In Date Out
ZON COMPLETE 01/31/2023 02/02/2023
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/31/2023 02/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 01/31/2023 02/07/2023
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 01/23/2023 01/25/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Please provide the total width of the driveway in front of the garage, not to exceed 36ft wide along with the setback from the nearest point of the driveway to the side property line.
ENGIN1 COMPLETE 01/13/2023 01/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 01/13/2023 01/20/2023
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 01/13/2023 01/13/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM The existing driveway is legally non-conforming. If replacing this existing driveway, the the new driveway must meet the current Land Development Code of 5ft minimum driveway side setback. The new driveway cannot be located in the 5' easement as it currently sits. Minimum driveway width is 16ft. Please provide the dimensions of the new driveway and walkway along with the material.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 03/09/2023
SW ENG RES REVIEW 200 ¤200.00 02/15/2023
SITE PLAN 15 ¤15.00 02/15/2023
ADJUSTMENT 50% (¤15.00) 02/15/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/15/2023
SW ENG INSPECTION 40 ¤40.00 02/15/2023
SW ENG PRE APRON ¤30.00 02/15/2023
Fees Total Due: ¤0.00 Total Paid: ¤330.00