I want to search for...
Permit #2023010627
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7002-00010-0110 |
| Block: 00010 |
| Subdivision: 2218 - SECTION 2-FLORIDA PARK |
| Job Phone: 386-793-6919 |
| Location Address: 21 FARRADAY LN |
| Type: DR - DRIVEWAY |
| Issue Date: 02/15/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN A RUTHERFORD |
| Owner: LEE SIDNEY H & LISA K LEE H&W |
|
Address 21 FARRADAY LN PALMC OAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤10,250.00 |
| Job Description: Replace existing concrete driveway |
| Type: CN |
Contractor
CREATIVE TOUCH CONCRETE SURFACING, LLC
| Status | Location Address | Phone |
| ACTIVE |
1 CARDWELL COURT PALM COAST, FL 32137 |
386-793-6919 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 03/10/2023 | APPROVED | PFLANAGAN |
| ROW - FINAL INSPECTION | 03/10/2023 | FINAL APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 03/10/2023 | FINAL APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 02/21/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY ------------------------------------------------------------------------------------- 2/17/2023 - PREVIOUS INSPECTION NOTES THERE ARE AREAS IN THE POURING AREA THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" IN THE RIGHT OF WAY | |||
| ROW- PRE-APRON (PRE-POUR) | 02/17/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THERE ARE AREAS IN THE POURING AREA THAT WONT GIVE YOU THE MINIMUM AMOUNT OF CONCRETE NEED TO HAVE 6" IN THE RIGHT OF WAY AND 4" IN THE RIGHT OF WAY |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/31/2023 | 02/02/2023 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/31/2023 | 02/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 01/31/2023 | 02/07/2023 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/23/2023 | 01/25/2023 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Please provide the total width of the driveway in front of the garage, not to exceed 36ft wide along with the setback from the nearest point of the driveway to the side property line. | |||
| ENGIN1 | COMPLETE | 01/13/2023 | 01/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 01/13/2023 | 01/20/2023 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/13/2023 | 01/13/2023 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM The existing driveway is legally non-conforming. If replacing this existing driveway, the the new driveway must meet the current Land Development Code of 5ft minimum driveway side setback. The new driveway cannot be located in the 5' easement as it currently sits. Minimum driveway width is 16ft. Please provide the dimensions of the new driveway and walkway along with the material. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/09/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/15/2023 |
| SITE PLAN 15 | ¤15.00 | 02/15/2023 |
| ADJUSTMENT 50% | (¤15.00) | 02/15/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/15/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 02/15/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/15/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤330.00 |