I want to search for...
Permit #2023010722
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00680-0190 |
| CONDITIONED SPACE: 2298 sqft |
| GARAGE: 626 sqft |
| OPENED PORCH (WITH ROOF) : 365 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 3377 sqft |
| Block: 00680 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 386-931-5935 |
| Location Address: 5 ROXBORO DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/27/2023 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: SANDERS JOHN R SR & VIVIENNE H&W |
|
Address 121 LAGUNA FOREST TRAIL PALM COAST, FL 32164 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤450,000.00 |
| Job Description: SINGLE FAMILY RESIDENTIAL |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 01/29/2024 | APPROVED | GBERTOLA |
| Note: 1/29/24=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/26/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF CULVERT PIPE 2) ALL BARE AREAS AT PROPERTY LINES NEED TO BE SODED 3) THE BERMS ARE TO STEEP ON THE BACK SIDE OF THEM NEED TO MAKE 4:1 SLOPE | |||
| U -UTILITY RESIDENTIAL FINAL | 01/26/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cross connection | |||
| ROW - STORMWATER FINAL | 01/26/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF CULVERT PIPE 2) ALL BARE AREAS AT PROPERTY LINES NEED TO BE SODED 3) THE BERMS ARE TO STEEP ON THE BACK SIDE OF THEM NEED TO MAKE 4:1 SLOPE | |||
| ROW - FINAL APRON (AFTER POUR) | 01/26/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| BLD - BUILDING FINAL | 01/26/2024 | Approval - Private Provider | PPROVIDER |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/25/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE -------------------------------------------------------------------------------------- 1/23/2024 - PREVIOUS INSPECTION NOTES THE ROADSIDE SWALE IS STILL NOT UP TO CITY STANDARDS CAN'T HAVE A TRENCH FOR THE SWALE NEED TO BLEND THE GRADE TO THE LOW AREA YOU CALLING THE SWALE --------------------------------------------------------------------------------------- 1/3/2024 - PREVIOUS INSPECTION NOTES 1) THE FIELD DOESN'T NOT MATCH THE FINAL SURVEY. FINAL SURVEY SHOWS YOU HAVE COMMON SWALES AND THE FIELD SHOWS YOU HAVE BERMS ALONG THE BACK AND LEFT SIDE AT THE PROPERTY LINE. THE FIELDS NEEDS TO MATCH THE FINAL SURVEY SO NEED TO TAKE BERM OUT OR CHANGE THE FINAL SURVEY TO REFLECT THE BERMS. 2) THE ROADSIDE SWALE FLOW NEEDS TO BE 8' OFF EDGE OF PAVEMENT PLEASE SEE DAIGRAM 300.D / 300.F OF THE CITY TECHNICAL MANUAL. ---------------------------------------------------------------------------- rjg. 12/27/23. Please make sure the Berm along the property of 4 Rockwell is inside the property line stakes. The berm is over the line. Homeowner planning to install a fence and the berm needs to be COMPLETELY inside the survey stakes (property line.) Long message left on the Office number on the permit on 12/27/23 to give them fare warning that it needs moved back onto the new build side of the line. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/23/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE ROADSIDE SWALE IS STILL NOT UP TO CITY STANDARDS CAN'T HAVE A TRENCH FOR THE SWALE NEED TO BLEND THE GRADE TO THE LOW AREA YOU CALLING THE SWALE --------------------------------------------------------------------------------------- 1/3/2024 - PREVIOUS INSPECTION NOTES 1) THE FIELD DOESN'T NOT MATCH THE FINAL SURVEY. FINAL SURVEY SHOWS YOU HAVE COMMON SWALES AND THE FIELD SHOWS YOU HAVE BERMS ALONG THE BACK AND LEFT SIDE AT THE PROPERTY LINE. THE FIELDS NEEDS TO MATCH THE FINAL SURVEY SO NEED TO TAKE BERM OUT OR CHANGE THE FINAL SURVEY TO REFLECT THE BERMS. 2) THE ROADSIDE SWALE FLOW NEEDS TO BE 8' OFF EDGE OF PAVEMENT PLEASE SEE DAIGRAM 300.D / 300.F OF THE CITY TECHNICAL MANUAL. ---------------------------------------------------------------------------- rjg. 12/27/23. Please make sure the Berm along the property of 4 Rockwell is inside the property line stakes. The berm is over the line. Homeowner planning to install a fence and the berm needs to be COMPLETELY inside the survey stakes (property line.) Long message left on the Office number on the permit on 12/27/23 to give them fare warning that it needs moved back onto the new build side of the line. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/23/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ON THE FINAL SURVEY | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/03/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE FIELD DOESN'T NOT MATCH THE FINAL SURVEY. FINAL SURVEY SHOWS YOU HAVE COMMON SWALES AND THE FIELD SHOWS YOU HAVE BERMS ALONG THE BACK AND LEFT SIDE AT THE PROPERTY LINE. THE FIELDS NEEDS TO MATCH THE FINAL SURVEY SO NEED TO TAKE BERM OUT OR CHANGE THE FINAL SURVEY TO REFLECT THE BERMS. 2) THE ROADSIDE SWALE FLOW NEEDS TO BE 8' OFF EDGE OF PAVEMENT PLEASE SEE DAIGRAM 300.D / 300.F OF THE CITY TECHNICAL MANUAL. ---------------------------------------------------------------------------- rjg. 12/27/23. Please make sure the Berm along the property of 4 Rockwell is inside the property line stakes. The berm is over the line. Homeowner planning to install a fence and the berm needs to be COMPLETELY inside the survey stakes (property line.) Long message left on the Office number on the permit on 12/27/23 to give them fare warning that it needs moved back onto the new build side of the line. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/03/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------- 12/21/2023 - PREVIOUS INSPECTION NOTES 12/21/23 ** ARRIVED ON SITE TO PERFORM FINAL SURVEY AND THERE IS NO SOD IN PLACE. CREW JUST ARRIVED TO LAY IT DOWN BUT I NEED TO HAVE SOD DOWN TO COMPARE AND ENSURE THE SURVEY WILL WORK AS INDICATED. | |||
| U-CROSS CONNECTION | 01/03/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ELECTRIC - EARLY POWER | 01/03/2024 | Approval - Private Provider | PPROVIDER |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/21/2023 | Disapproved - NO FEE | TPOLACEK |
| Note: 12/21/23 ** ARRIVED ON SITE TO PERFORM FINAL SURVEY AND THERE IS NO SOD IN PLACE. CREW JUST ARRIVED TO LAY IT DOWN BUT I NEED TO HAVE SOD DOWN TO COMPARE AND ENSURE THE SURVEY WILL WORK AS INDICATED. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------------- 10/12/2023 - PREVIOUS INSPECTION NOTES 10/11/2023 - PREVIOUS INSPECTION NOTES 1) THE FACE BOARD ALONG THE EDGE OF PAVEMENT IS TO FAR FROM THE EDGE OF PAVEMENT NEED TO MOVE IT CLOSER 2) THE DRIVEWAY ABOVE THE RIGHT OF WAY DOSEN'T MATCH WHAT THE SITE PLAN SHOWS THE SITE PLAN SHOWS A 20' DRIVEWAY NEED TO REVISE SITE PLAN BEFORE THIS PASSES OR CHANGE IT BACK TO THE ORIGINAL WIDTH | |||
| ROW- PRE-APRON (PRE-POUR) | 10/12/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: 10/11/2023 - PREVIOUS INSPECTION NOTES 1) THE FACE BOARD ALONG THE EDGE OF PAVEMENT IS TO FAR FROM THE EDGE OF PAVEMENT NEED TO MOVE IT CLOSER 2) THE DRIVEWAY ABOVE THE RIGHT OF WAY DOSEN'T MATCH WHAT THE SITE PLAN SHOWS THE SITE PLAN SHOWS A 20' DRIVEWAY NEED TO REVISE SITE PLAN BEFORE THIS PASSES OR CHANGE IT BACK TO THE ORIGINAL WIDTH | |||
| ROW- PRE-APRON (PRE-POUR) | 10/11/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE FACE BOARD ALONG THE EDGE OF PAVEMENT IS TO FAR FROM THE EDGE OF PAVEMENT NEED TO MOVE IT CLOSER 2) THE DRIVEWAY ABOVE THE RIGHT OF WAY DOSEN'T MATCH WHAT THE SITE PLAN SHOWS THE SITE PLAN SHOWS A 20' DRIVEWAY NEED TO REVISE SITE PLAN BEFORE THIS PASSES OR CHANGE IT BACK TO THE ORIGINAL WIDTH | |||
| GRAVITY SEWER TEST | 10/10/2023 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 10/10/2023 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 08/18/2023 | Approval - Private Provider | PPROVIDER |
| Note: 8/17/2023 3:56:00 PM- PREVIOUS INSPECTION NOTES | |||
| INSULATION | 08/16/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 08/01/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 08/01/2023 | CANCELLED BY APPLICANT | PPROVIDER |
| ALL ROUGH | 07/31/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 06/26/2023 | Approval - Private Provider | LMUSGROVE |
| WALL SHEATHING | 06/21/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/21/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 05/18/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/03/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 04/13/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/04/2023 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 03/07/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 01/22/2024 | 01/22/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM MAIN CONTRACTOR INACTIVE | |||
| BADMIN | INFORMATION | 01/19/2024 | 01/19/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM NOC EXPIRED 1/5/24 | |||
| BLD | HOLD | 10/12/2023 | 10/17/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans are for 12 floral court. Upload revision for 5 Roxboro | |||
| ENGIN1 | COMPLETE | 05/18/2023 | 05/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/18/2023 | 05/18/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/28/2023 | 03/28/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Private provider missing Professional liability insurance coverage for firm , provider and authorized representatives. | |||
| MECH | COMPLETE | 02/23/2023 | 02/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/17/2023 | 02/17/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/26/2023 | 01/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition (Second Request) | |||
| ZON | COMPLETE | 01/26/2023 | 01/26/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/26/2023 | 02/01/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE 5% FALL FROM THE STRUCTURE THE FIRST 10" | |||
| ENGIN1 | COMPLETE | 01/26/2023 | 01/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/17/2023 | 01/20/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/17/2023 | 01/19/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 01/17/2023 | 01/18/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/17/2023 | 01/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/17/2023 | 01/19/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/17/2023 | 01/17/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition 2. Provide correct license number on duct layout | |||
| SW1 | HOLD | 01/17/2023 | 01/25/2023 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM NEED TO HAVE A PROPOSED BENCH MARK AND LOCATION OF IT, WHERE EVERYEXISTING ELEVATION IS NEED TO PROVIDE A PROPOSED ELEVATION. NEED TO CLEAN UP SITE PLAN DONT NEED TO SEE LANDSCAPE AS IS MAKING READING NUMBERS DIFFICULT | |||
| SWALE | COMPLETE | 01/17/2023 | 04/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 01/29/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/29/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/29/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 01/29/2024 |
| INSPECTION - RESIDENTIAL | ¤1,237.50 | 02/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤351.00 | 02/27/2023 |
| CONNECTION FEES | ¤1,166.26 | 02/27/2023 |
| WATER- TURN ON | ¤25.00 | 02/27/2023 |
| ADJUSTMENT 50% | (¤809.25) | 02/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/27/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 02/27/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 02/27/2023 |
| SEWER CREDIT | (¤1,147.00) | 02/27/2023 |
| SEWER INSPECTION | ¤25.00 | 02/27/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 02/27/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 02/27/2023 |
| SITE PLAN 30 | ¤30.00 | 02/27/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 02/27/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 02/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 02/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 02/27/2023 |
| IMPACT FEE FIRE | ¤420.52 | 02/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/27/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 02/27/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 02/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/27/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 02/27/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 02/27/2023 |
| SURCHARGE FS 533.721 | ¤5.01 | 02/27/2023 |
| SURCHARGE - FS 468.631 | ¤7.51 | 02/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/27/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,407.40 |