I want to search for...
Permit #2023010977
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00670-0110 |
| CONDITIONED SPACE: 2430 sqft |
| GARAGE: 699 sqft |
| OPENED PORCH (WITH ROOF) : 504 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| Total Square Footage: 3729 sqft |
| Block: 00670 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 386-627-0430 |
| Location Address: 3 ULSTER CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/03/2023 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: RICKIE H EBANKS AND LISA P EBANKS H&W |
|
Address 11 EDISON LANE PALM COAST, FL 32164 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/03/2024 | FINAL APPROVED | MKRASKI |
| U-CROSS CONNECTION | 11/16/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/16/2023 | APPROVED | GBERTOLA |
| Note: 11/16/23= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/20/23 UPON WALKING THE PROPERTY NOTICED A COUPLE WASHOUTS IN THE REAR RIGHT THAT NEED REPAIR. YOU WILL NEED TO DO ROAD REPAIR ON ULYSSESS BEFORE ROW FINAL PASSAGE. BOTH AREAS OUTLINED IN WHITE. APPROVING THE FIELD SURVEY AS NOTED. | |||
| ROW - STORMWATER FINAL | 11/16/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION FROM THE TIME OF THE INSPECTION APPROVAL TO THE CONCRETE POUR. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/20/23 UPON WALKING THE PROPERTY NOTICED A COUPLE WASHOUTS IN THE REAR RIGHT THAT NEED REPAIR. YOU WILL NEED TO DO ROAD REPAIR ON ULYSSESS BEFORE ROW FINAL PASSAGE. BOTH AREAS OUTLINED IN WHITE. APPROVING THE FIELD SURVEY AS NOTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/16/2023 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/20/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/20/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/20/23 UPON WALKING THE PROPERTY NOTICED A COUPLE WASHOUTS IN THE REAR RIGHT THAT NEED REPAIR. YOU WILL NEED TO DO ROAD REPAIR ON ULYSSESS BEFORE ROW FINAL PASSAGE. BOTH AREAS OUTLINED IN WHITE. APPROVING THE FIELD SURVEY AS NOTED. | |||
| ELECTRIC - EARLY POWER | 09/15/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 4/27/2023 - PREVIOUS INSPECTION NOTES 4-27-23 1. Electrical protection need to extend down to grade. 5-1-23 1. Emailed FPL at 2:36. 9-15-23 1. Emailed FPL at 2:41. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/14/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U - SEWER TIE IN | 08/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 08/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 06/30/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 06/29/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 06/22/2023 | APPROVED | BTAYLOR |
| Note: 6/14/2023 - PREVIOUS INSPECTION NOTES 6/14/23: 1). No energy calcs in permit box. 107.3.1 2). 5ft head pressure not holding. P2503.5.1 3). Wires are not phased out as required. 4). Plumbing vent pipe at Laundry Area is not pitched as required. 1/8" per foot minimum. 5). Main flexible duct lines are not strap supported at 4ft intervals as required. 6). Windows are not anchored per manufacturer's installation requirements. 7). Need revision submitted to & approved by the City for the different windows (Silverline) & Doors (Plygem) than what was originally submitted & approved by the City. 8). Front doors do not have the glass installed - Will need to be installed by Insulation or a window nailing inspection will be added to permit. | |||
| ALL ROUGH | 06/14/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/14/23: 1). No energy calcs in permit box. 107.3.1 2). 5ft head pressure not holding. P2503.5.1 3). Wires are not phased out as required. 4). Plumbing vent pipe at Laundry Area is not pitched as required. 1/8" per foot minimum. 5). Main flexible duct lines are not strap supported at 4ft intervals as required. 6). Windows are not anchored per manufacturer's installation requirements. 7). Need revision submitted to & approved by the City for the different windows (Silverline) & Doors (Plygem) than what was originally submitted & approved by the City. 8). Front doors do not have the glass installed - Will need to be installed by Insulation or a window nailing inspection will be added to permit. | |||
| ELECTRIC-TUG | 05/01/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4/27/2023 - PREVIOUS INSPECTION NOTES 4-27-23 1. Electrical protection need to extend down to grade. 5-1-23 1. Emailed FPL at 2:36. | |||
| ELECTRIC-TUG | 04/27/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-27-23 1. Electrical protection need to extend down to grade. | |||
| ROOF VALLEY & METAL | 04/25/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 4-19-23 1. Missing engineering circled in packet. | |||
| WALL SHEATHING | 04/19/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/19/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-19-23 1. Missing engineering circled in packet. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/10/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/05/2023 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 03/17/2023 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 03/16/2023 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/10/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/14/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/21/2023 | 06/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/15/2023 | 06/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/14/2023 | 06/14/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide only changed numbers on product approval worksheet or highlight changes on product approval worksheet | |||
| SW1 | COMPLETE | 05/31/2023 | 06/09/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/31/2023 | 06/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/31/2023 | 05/31/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/23/2023 | 05/23/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM BACK LEFT SIDE BY THE PROPERTY LINE WATER IS IMPACTING THE JOINT LOT Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) | |||
| ENGIN1 | COMPLETE | 05/16/2023 | 05/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/16/2023 | 05/16/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/11/2023 | 05/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/11/2023 | 05/15/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ZON | COMPLETE | 05/11/2023 | 05/11/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 05/02/2023 | 05/02/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation does not agree with center of road elevations by .5' | |||
| ENGIN1 | COMPLETE | 04/06/2023 | 04/10/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/06/2023 | 04/10/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/01/2023 | 02/01/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/31/2023 | 01/31/2023 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The job value stated on the application appears to be incorrect, please submit a revisoin sheet with with a statement with the correct value. | |||
| MECH | COMPLETE | 01/30/2023 | 01/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/30/2023 | 05/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/30/2023 | 01/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | HOLD | 01/23/2023 | 01/24/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide Product Approval for rear glass siding doors. Product Approval submitted is for a swing door and Floor Plans show a slider. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| BLD | HOLD | 01/20/2023 | 01/24/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide Product Approval for rear glass siding doors. Product Approval submitted is for a swing door and Floor Plans show a slider. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 01/20/2023 | 01/24/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/20/2023 | 01/23/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/20/2023 | 01/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/20/2023 | 01/26/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | HOLD | 01/20/2023 | 01/23/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calcs from listed mechanical subcontractor or list correct mechanical subcontractor | |||
| SW1 | COMPLETE | 01/20/2023 | 01/25/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/20/2023 | 01/23/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 01/03/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/03/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/03/2024 |
| CONNECTION FEES | ¤1,166.26 | 02/03/2023 |
| WATER-METER | ¤505.39 | 02/03/2023 |
| WATER- TURN ON | ¤25.00 | 02/03/2023 |
| WATER- TURN ON | ¤25.00 | 02/03/2023 |
| ADJUSTMENT 50% | (¤5,310.00) | 02/03/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/03/2023 |
| INSPECTION - RESIDENTIAL | ¤8,250.00 | 02/03/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤2,340.00 | 02/03/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/03/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 02/03/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 02/03/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 02/03/2023 |
| IMPACT FEE FIRE | ¤420.52 | 02/03/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/03/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/03/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 02/03/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/03/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 02/03/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/03/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/03/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 02/03/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 02/03/2023 |
| SURCHARGE FS 533.721 | ¤30.77 | 02/03/2023 |
| SURCHARGE - FS 468.631 | ¤46.16 | 02/03/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/03/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/03/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/03/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/03/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/03/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 02/03/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 02/03/2023 |
| SEWER CREDIT | (¤850.00) | 02/03/2023 |
| SEWER INSPECTION | ¤25.00 | 02/03/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 02/03/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 02/03/2023 |
| SITE PLAN 30 | ¤30.00 | 02/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤26,094.45 |