I want to search for...

Permit #2023011018

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00010-0020
CONDITIONED SPACE: 3092 sqft
GARAGE: 896 sqft
SCREEN PORCH (SOLID ROOF) : 82 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
OPENED PORCH (WITH ROOF) : 82 sqft
Total Square Footage: 4262 sqft
Block: 00010
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 774-696-6541
Location Address: 4 FARNUM LN
Type: DU - DUPLEX
Issue Date: 02/13/2023
NOC: RECORDED
Applicant name: JOHN DESMOND
Owner: JOHN J DESMOND

Address

15 CHERRYTREE COURT

PALM COAST , FL 32137

Lot: 0020
Contracted Stated Job Value: ¤325,000.00
Job Description: Duplex
Type: CN

Contractor

COMPLETE BUILDERS LLC
Status Location Address State License Number Phone
INACTIVE

15 CHERRYTREE CT

PALM COAST, FL 32137

CGC1530956 (Exp: 08/31/2026) 774-696-6541

Sub Contractors

JEFFREY ADAM MCGREGOR
Status Location Address State License Number Phone Fax
ACTIVE

1312 YORKTOWN STREET

DELAND , FL 32724

EC13005662 (Exp: 08/31/2026) 386-736-7475 386-785-1503
FRANK E SEVERINO
Status Location Address State License Number Phone Fax
ACTIVE

1360 N NOVA RD

DAYTONA BEACH, FL 32117

CBC060543 (Exp: 08/31/2026) 386-253-1943 386-238-0139
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/21/2023 FINAL APPROVED AGAETANO
Note: 9/19/2023 - PREVIOUS INSPECTION NOTES 9/14/2023 - PREVIOUS INSPECTION NOTES 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped. 09-14-2023 Above issues have not been resolved. 1. Meter mains not ldentified. 2.Unit A - no water. 3. Approved Energy calcs Design Information for both units not on site. 4. Kitchen circuits not working. 5. Bath GFCI not working. Inspection stopped. 09-19-2023 1. AC in both units not workin. Must be in operation for inspection. 2. Units A & B D.W. drains not tied to underside of sink. 3. Unit B hole in wall not sealed. 4. Unit B AHU oval knockout is missing. Interlock is acceptable for AHU as per Building Official. Inspection stopped.
BLD - BUILDING FINAL 09/19/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 9/14/2023 - PREVIOUS INSPECTION NOTES 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped. 09-14-2023 Above issues have not been resolved. 1. Meter mains not ldentified. 2.Unit A - no water. 3. Approved Energy calcs Design Information for both units not on site. 4. Kitchen circuits not working. 5. Bath GFCI not working. Inspection stopped. 09-19-2023 1. AC in both units not working. Must be in operation for inspection. 2. Units A & B D.W. drains not tied to underside of sink. 3. Unit B hole AHU in wall not sealed. 4. Unit B AHU oval knockout is missing. Interlock is acceptable for AHU as per Building Official. Inspection stopped.
BLD - BUILDING FINAL 09/14/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped. 09-14-2023 Above issues have not been resolved. 1. Meter mains not ldentified. 2.Unit A - no water. 3. Approved Energy calcs Design Information for both units not on site. 4. Kitchen circuits not working. 5. Bath GFCI not working. Inspection stopped.
BLD - BUILDING FINAL 09/13/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped.
BLD - BUILDING FINAL 09/12/2023 CANCELLED BY APPLICANT WEB
ROW - FINAL INSPECTION 09/12/2023 FINAL APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 09/06/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 09/06/2023 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/01/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 09/01/2023 APPROVED - AS NOTED EMADISON
Note: ** 09/01/23 BETWEEN DRIVEWAY CULVERTS NEED TO LOWER SOD INCONSISTENT FLOW AS WATER FLOWS FROM LEFT TO RIGHT ** RIGHT SIDE DRIVEWAY ON RIGHT SIDE NEED TO DO A 2:1 SLOPE UP TO MATCH EXISTING GRADE. ** ON BOTH THE LEFT AND RIGHT SIDES OF HOUSE NEXT TO A/C GUTTER DOWN SPOUTS FILL IN ERODED AREA AND SO ** RIGHT SIDE IN FRONT OF VACANT NEED TO SOD AREA OUTLINED WITH WHITE PAINT ** RIGHT SIDE ALONG VACANT WILL NEED TO DO HOT PATCH ROAD REPAIR NOTE WHITE PAINT
ELECTRIC - EARLY POWER 08/15/2023 APPROVED AGAETANO
ROW- PRE-APRON (PRE-POUR) 06/13/2023 APPROVED EMADISON
Note: ** 06/13/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **Sec 400.02 Sidewalks constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete. ______________________________________________________________________________________________________________________ 6/9/2023 - PREVIOUS INSPECTION NOTES ** 06/08/23 RIGHT SIDE DRIVEWAY NEEDS TO BE 8 FEET FROM EDGE OF ROAD TO CENTER OF THE CULVERT PIPE BUILDER NEEDS TO AQDJUST FORM BOARDS. ** CULVERT PIPE GOOD AT THE TIME OF INSPECTION
ROW- PRE-APRON (PRE-POUR) 06/09/2023 Disapproved - NO FEE EMADISON
Note: ** 06/08/23 RIGHT SIDE DRIVEWAY NEEDS TO BE 8 FEET FROM EDGE OF ROAD TO CENTER OF THE CULVERT PIPE BUILDER NEEDS TO AQDJUST FORM BOARDS. ** CULVERT PIPE GOOD AT THE TIME OF INSPECTION
INSULATION 05/24/2023 APPROVED AGAETANO
Note: 5/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 5/9/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added. 05-11-2023 Left unit front window not installed. 05-17-2023 Left front window needs to be covered or installed prior to insulation inspection. This has been noted on 5/11 & 5/9.
WINDOW FASTENING 05/24/2023 APPROVED AGAETANO
Note: 05-09-2023 Left front unit window not installed
GRAVITY SEWER TEST 05/22/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 05/22/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS AVIRTUAL INSPECTION
INSULATION 05/17/2023 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2420 5/9/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added. 05-11-2023 Left unit front window not installed. 05-17-2023 Left front window needs to be covered or installed prior to insulation inspection. This has been noted on 5/11 & 5/9.
ALL ROUGH 05/11/2023 APPROVED - AS NOTED AGAETANO
Note: 5/9/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added. 05-11-2023 Left unit front window not installed.
FIREWALL FINAL 05/10/2023 APPROVED AGAETANO
ROW - DRAINAGE 05/10/2023 APPROVED EMADISON
Note: ** 05/10/23 CORRECTIONS MADE IT IS THE RESPONSIBILITY OF THE BUILDER TO MAINTAIN THE EROSION CONTROL FOR THE PROPERTY WHILE UNDER CONSTRUCTION ** AND TO MAINTAIN THE ROAD SIDE SWALE TO ALLOW FOR THE STORM WATER TO FLOW. _____________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES BUILDER ALSO NEEDS TO FIX SILT FENCE REMOVE THE POTTY and THE DUMPSTER FROM THE SWALE OR FROM THE ROAD AND PLACE IN your property OUT OF THE ROW PICTURE ATTACHED INSPECTOR BE BACK ON 5/10/23
ALL ROUGH 05/09/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added.
ALL ROUGH 05/03/2023 Disapproved - NO FEE AGAETANO
Note: 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed properly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped.
LATH/BRICK/ WATER BARRIER 05/03/2023 APPROVED AGAETANO
ROW - DRAINAGE 05/03/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: BUILDER ALSO NEEDS TO FIX SILT FENCE REMOVE THE POTTY and THE DUMPSTER FROM THE SWALE OR FROM THE ROAD AND PLACE IN your property OUT OF THE ROW PICTURE ATTACHED INSPECTOR BE BACK ON 5/10/23
ROOF VALLEY & METAL 04/28/2023 APPROVED AGAETANO
FIREWALL DRYWALL NAILING 04/26/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/24/2023 APPROVED AGAETANO
FOOTER 04/10/2023 APPROVED RMARTIN
Note: 4/6/2023 - PREVIOUS INSPECTION NOTES 04-05-2023 Left unit footing not installed as per plans. Only 2 rerbar and not spaced properly as per plans.
FOOTER 04/06/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 04-06-2023 Left unit footing not installed as per plans. Only 2 rerbar and not spaced properly as per plans.
WALL SHEATHING 04/06/2023 APPROVED AGAETANO
U-CROSS CONNECTION 04/06/2023 APPROVED DHANEY
FOUND SURVEY APPROVED (OFFICE) 03/23/2023 APPROVED TBAKER
TIE BEAM / LINTEL 03/20/2023 APPROVED AGAETANO
ELECTRIC - EARLY POWER 03/07/2023 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 03/07/2023 APPROVED RMARTIN
PLUMBING 1ST ROUGH UNDERGROUND 03/01/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 02/22/2023 APPROVED TSCHWEERS

Review History

Department Status Date In Date Out
MECH COMPLETE 09/15/2023 09/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/13/2023 06/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/13/2023 06/21/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 06/13/2023 06/13/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 05/05/2023 05/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 05/03/2023 05/04/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Entire energy calc with heatload and duct layout
BLD COMPLETE 03/30/2023 04/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/23/2023 03/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/23/2023 03/23/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 02/27/2023 03/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 02/06/2023 02/06/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 02/06/2023 02/06/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/06/2023 02/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/06/2023 02/10/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 02/01/2023 02/02/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Site plan : Missing mechanical equiptment
ELEC COMPLETE 02/01/2023 02/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 02/01/2023 02/02/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Enegy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition
BLD COMPLETE 01/23/2023 01/24/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 01/23/2023 01/26/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 01/23/2023 01/23/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarms in all bedrooms and outside of all bedrooms. FRC 2020 314,315 2. Need outlet next to sink in master bathroom. NEC 2017 210.52 (D) 3. Electric load calcs need to be done to the living space of the units. NEC 2017 220.80
ENGIN1 COMPLETE 01/23/2023 01/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/23/2023 01/26/2023
Note: Released By: TONI CHURCHILL - -
MECH HOLD 01/23/2023 01/24/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Energy Calcs by listed mechanical subcontractor. 2. Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition
SW1 COMPLETE 01/23/2023 01/31/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 01/23/2023 01/23/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan : Missing mechanical equiptment Landscape plan: Missing Elevation Plan: Articulation: Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation. A base course or plinth course: Banding, molding, or stringcourses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers; as part of the exterior wall construction.
SWALE COMPLETE 01/23/2023 05/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/21/2023
PLAN REVIEW - REVISION ¤32.50 09/21/2023
REINSPECTION RESIDENTIAL ¤40.00 09/21/2023
REINSPECTION RESIDENTIAL ¤40.00 09/21/2023
REINSPECTION RESIDENTIAL ¤40.00 09/21/2023
REINSPECTION RESIDENTIAL ¤40.00 09/21/2023
REINSPECTION RESIDENTIAL ¤40.00 09/21/2023
SW ENG - INSPECTION 20 ¤20.00 09/21/2023
SW ENG - INSPECTION 20 ¤20.00 09/21/2023
SW ENG INSPECTION 80 ¤80.00 02/13/2023
SW ENG PRE APRON ¤30.00 02/13/2023
SW ENG - REVIEW 20 ¤20.00 02/13/2023
SW ENG RES REVIEW 200 ¤200.00 02/13/2023
TRANS IMPACT FEE ADMIN ¤82.14 02/13/2023
TRANS IMPACT FEE ADMIN (¤82.14) 02/13/2023
SEWER CREDIT (¤1,147.00) 02/13/2023
SEWER INSPECTION ¤25.00 02/13/2023
SEWER CAPITAL FACILITY ¤5,344.82 02/13/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 02/13/2023
SITE PLAN 30 ¤30.00 02/13/2023
WATER- TURN ON ¤25.00 02/13/2023
ADJUSTMENT 50% (¤705.12) 02/13/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/13/2023
INSPECTION - RESIDENTIAL ¤1,075.25 02/13/2023
PLAN REVIEW - RESIDENTIAL ¤304.98 02/13/2023
CONNECTION FEES ¤1,166.26 02/13/2023
CONTRACTOR CHANGE ¤20.00 02/13/2023
FIRE IMPACT FEE ADMIN ¤25.23 02/13/2023
FIRE IMPACT FEE ADMIN (¤25.23) 02/13/2023
FC IMPACT FEE EMS ¤124.00 02/13/2023
IMPACT FEE FIRE ¤841.04 02/13/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 02/13/2023
FC IMPACT FEE LIBRARY ¤536.00 02/13/2023
IMPACT FEE PARKS ¤3,538.30 02/13/2023
IMPACT FEE SCHOOL ¤10,900.00 02/13/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 02/13/2023
WATER -IRRIGATION INSPECTION ¤25.00 02/13/2023
PARKS IMPACT FEE ADMIN ¤106.15 02/13/2023
PARKS IMPACT FEE ADMIN ¤106.15 02/13/2023
PARKS IMPACT FEE ADMIN (¤106.15) 02/13/2023
SURCHARGE FS 533.721 ¤4.41 02/13/2023
SURCHARGE - FS 468.631 ¤6.62 02/13/2023
SW ENG - FOUNDATION SURVEY ¤20.00 02/13/2023
Fees Total Due: ¤0.00 Total Paid: ¤30,077.59