I want to search for...
Permit #2023011018
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00010-0020 |
| CONDITIONED SPACE: 3092 sqft |
| GARAGE: 896 sqft |
| SCREEN PORCH (SOLID ROOF) : 82 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 82 sqft |
| Total Square Footage: 4262 sqft |
| Block: 00010 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 774-696-6541 |
| Location Address: 4 FARNUM LN |
| Type: DU - DUPLEX |
| Issue Date: 02/13/2023 |
| NOC: RECORDED |
| Applicant name: JOHN DESMOND |
| Owner: JOHN J DESMOND |
|
Address 15 CHERRYTREE COURT PALM COAST , FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤325,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
COMPLETE BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
15 CHERRYTREE CT PALM COAST, FL 32137 |
CGC1530956 (Exp: 08/31/2026) | 774-696-6541 |
Sub Contractors
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
FRANK E SEVERINO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1360 N NOVA RD DAYTONA BEACH, FL 32117 |
CBC060543 (Exp: 08/31/2026) | 386-253-1943 | 386-238-0139 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/21/2023 | FINAL APPROVED | AGAETANO |
| Note: 9/19/2023 - PREVIOUS INSPECTION NOTES 9/14/2023 - PREVIOUS INSPECTION NOTES 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped. 09-14-2023 Above issues have not been resolved. 1. Meter mains not ldentified. 2.Unit A - no water. 3. Approved Energy calcs Design Information for both units not on site. 4. Kitchen circuits not working. 5. Bath GFCI not working. Inspection stopped. 09-19-2023 1. AC in both units not workin. Must be in operation for inspection. 2. Units A & B D.W. drains not tied to underside of sink. 3. Unit B hole in wall not sealed. 4. Unit B AHU oval knockout is missing. Interlock is acceptable for AHU as per Building Official. Inspection stopped. | |||
| BLD - BUILDING FINAL | 09/19/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 9/14/2023 - PREVIOUS INSPECTION NOTES 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped. 09-14-2023 Above issues have not been resolved. 1. Meter mains not ldentified. 2.Unit A - no water. 3. Approved Energy calcs Design Information for both units not on site. 4. Kitchen circuits not working. 5. Bath GFCI not working. Inspection stopped. 09-19-2023 1. AC in both units not working. Must be in operation for inspection. 2. Units A & B D.W. drains not tied to underside of sink. 3. Unit B hole AHU in wall not sealed. 4. Unit B AHU oval knockout is missing. Interlock is acceptable for AHU as per Building Official. Inspection stopped. | |||
| BLD - BUILDING FINAL | 09/14/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped. 09-14-2023 Above issues have not been resolved. 1. Meter mains not ldentified. 2.Unit A - no water. 3. Approved Energy calcs Design Information for both units not on site. 4. Kitchen circuits not working. 5. Bath GFCI not working. Inspection stopped. | |||
| BLD - BUILDING FINAL | 09/13/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 09-13-2023 1. Energy calcs do not match for either unit. 2. Meter main not labeled. 3. Unit A disposal not working. 4. Holes on exterior. 5. AC pad is covered with mulch. Inspection stopped. | |||
| BLD - BUILDING FINAL | 09/12/2023 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL INSPECTION | 09/12/2023 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 09/06/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 09/06/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/01/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/01/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/01/23 BETWEEN DRIVEWAY CULVERTS NEED TO LOWER SOD INCONSISTENT FLOW AS WATER FLOWS FROM LEFT TO RIGHT ** RIGHT SIDE DRIVEWAY ON RIGHT SIDE NEED TO DO A 2:1 SLOPE UP TO MATCH EXISTING GRADE. ** ON BOTH THE LEFT AND RIGHT SIDES OF HOUSE NEXT TO A/C GUTTER DOWN SPOUTS FILL IN ERODED AREA AND SO ** RIGHT SIDE IN FRONT OF VACANT NEED TO SOD AREA OUTLINED WITH WHITE PAINT ** RIGHT SIDE ALONG VACANT WILL NEED TO DO HOT PATCH ROAD REPAIR NOTE WHITE PAINT | |||
| ELECTRIC - EARLY POWER | 08/15/2023 | APPROVED | AGAETANO |
| ROW- PRE-APRON (PRE-POUR) | 06/13/2023 | APPROVED | EMADISON |
| Note: ** 06/13/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **Sec 400.02 Sidewalks constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete. ______________________________________________________________________________________________________________________ 6/9/2023 - PREVIOUS INSPECTION NOTES ** 06/08/23 RIGHT SIDE DRIVEWAY NEEDS TO BE 8 FEET FROM EDGE OF ROAD TO CENTER OF THE CULVERT PIPE BUILDER NEEDS TO AQDJUST FORM BOARDS. ** CULVERT PIPE GOOD AT THE TIME OF INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 06/09/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/08/23 RIGHT SIDE DRIVEWAY NEEDS TO BE 8 FEET FROM EDGE OF ROAD TO CENTER OF THE CULVERT PIPE BUILDER NEEDS TO AQDJUST FORM BOARDS. ** CULVERT PIPE GOOD AT THE TIME OF INSPECTION | |||
| INSULATION | 05/24/2023 | APPROVED | AGAETANO |
| Note: 5/17/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 5/9/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added. 05-11-2023 Left unit front window not installed. 05-17-2023 Left front window needs to be covered or installed prior to insulation inspection. This has been noted on 5/11 & 5/9. | |||
| WINDOW FASTENING | 05/24/2023 | APPROVED | AGAETANO |
| Note: 05-09-2023 Left front unit window not installed | |||
| GRAVITY SEWER TEST | 05/22/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 05/22/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS AVIRTUAL INSPECTION | |||
| INSULATION | 05/17/2023 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2420 5/9/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added. 05-11-2023 Left unit front window not installed. 05-17-2023 Left front window needs to be covered or installed prior to insulation inspection. This has been noted on 5/11 & 5/9. | |||
| ALL ROUGH | 05/11/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 5/9/2023 - PREVIOUS INSPECTION NOTES 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added. 05-11-2023 Left unit front window not installed. | |||
| FIREWALL FINAL | 05/10/2023 | APPROVED | AGAETANO |
| ROW - DRAINAGE | 05/10/2023 | APPROVED | EMADISON |
| Note: ** 05/10/23 CORRECTIONS MADE IT IS THE RESPONSIBILITY OF THE BUILDER TO MAINTAIN THE EROSION CONTROL FOR THE PROPERTY WHILE UNDER CONSTRUCTION ** AND TO MAINTAIN THE ROAD SIDE SWALE TO ALLOW FOR THE STORM WATER TO FLOW. _____________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES BUILDER ALSO NEEDS TO FIX SILT FENCE REMOVE THE POTTY and THE DUMPSTER FROM THE SWALE OR FROM THE ROAD AND PLACE IN your property OUT OF THE ROW PICTURE ATTACHED INSPECTOR BE BACK ON 5/10/23 | |||
| ALL ROUGH | 05/09/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 5/3/2023 - PREVIOUS INSPECTION NOTES 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed prperly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. 05-09-2023 1. Right unit head test failed. 2. Left unit kitchen vent not sealed at roof deck properly. 3. Left unit window not installed. Window nailing will be added. | |||
| ALL ROUGH | 05/03/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 05-03-2023 1. Right unit: Exterior GFI at meter main not fastened. Sleeves through fire wall not sealed properly. Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 2. Left unit: Refrigerator water line at slab not sealed properly at fire wall. Please provide details of repair and submit to the building department and have on site for inspection. Energy calcs not match - SHGC sticker is .30 and calcs indicate .24. 3. Only one head test. Inspection stopped. | |||
| LATH/BRICK/ WATER BARRIER | 05/03/2023 | APPROVED | AGAETANO |
| ROW - DRAINAGE | 05/03/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: BUILDER ALSO NEEDS TO FIX SILT FENCE REMOVE THE POTTY and THE DUMPSTER FROM THE SWALE OR FROM THE ROAD AND PLACE IN your property OUT OF THE ROW PICTURE ATTACHED INSPECTOR BE BACK ON 5/10/23 | |||
| ROOF VALLEY & METAL | 04/28/2023 | APPROVED | AGAETANO |
| FIREWALL DRYWALL NAILING | 04/26/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/24/2023 | APPROVED | AGAETANO |
| FOOTER | 04/10/2023 | APPROVED | RMARTIN |
| Note: 4/6/2023 - PREVIOUS INSPECTION NOTES 04-05-2023 Left unit footing not installed as per plans. Only 2 rerbar and not spaced properly as per plans. | |||
| FOOTER | 04/06/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 04-06-2023 Left unit footing not installed as per plans. Only 2 rerbar and not spaced properly as per plans. | |||
| WALL SHEATHING | 04/06/2023 | APPROVED | AGAETANO |
| U-CROSS CONNECTION | 04/06/2023 | APPROVED | DHANEY |
| FOUND SURVEY APPROVED (OFFICE) | 03/23/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/20/2023 | APPROVED | AGAETANO |
| ELECTRIC - EARLY POWER | 03/07/2023 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 03/07/2023 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/01/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 02/22/2023 | APPROVED | TSCHWEERS |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/15/2023 | 09/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/13/2023 | 06/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/13/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/13/2023 | 06/13/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/05/2023 | 05/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/03/2023 | 05/04/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Entire energy calc with heatload and duct layout | |||
| BLD | COMPLETE | 03/30/2023 | 04/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/23/2023 | 03/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/23/2023 | 03/23/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/27/2023 | 03/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/06/2023 | 02/06/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/06/2023 | 02/06/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/06/2023 | 02/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/06/2023 | 02/10/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/01/2023 | 02/02/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Site plan : Missing mechanical equiptment | |||
| ELEC | COMPLETE | 02/01/2023 | 02/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/01/2023 | 02/02/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Enegy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| BLD | COMPLETE | 01/23/2023 | 01/24/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/23/2023 | 01/26/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 01/23/2023 | 01/23/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarms in all bedrooms and outside of all bedrooms. FRC 2020 314,315 2. Need outlet next to sink in master bathroom. NEC 2017 210.52 (D) 3. Electric load calcs need to be done to the living space of the units. NEC 2017 220.80 | |||
| ENGIN1 | COMPLETE | 01/23/2023 | 01/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/23/2023 | 01/26/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | HOLD | 01/23/2023 | 01/24/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Energy Calcs by listed mechanical subcontractor. 2. Energy Calcs need to be signed by the builder per 107.1 FBC Residential 2020 7th edition | |||
| SW1 | COMPLETE | 01/23/2023 | 01/31/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/23/2023 | 01/23/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan : Missing mechanical equiptment Landscape plan: Missing Elevation Plan: Articulation: Facade articulation is required to add interest to a building. The following features shall be acceptable techniques of exterior articulation. A base course or plinth course: Banding, molding, or stringcourses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers; as part of the exterior wall construction. | |||
| SWALE | COMPLETE | 01/23/2023 | 05/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 09/21/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/21/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/21/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/21/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/13/2023 |
| SW ENG PRE APRON | ¤30.00 | 02/13/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/13/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/13/2023 |
| TRANS IMPACT FEE ADMIN | ¤82.14 | 02/13/2023 |
| TRANS IMPACT FEE ADMIN | (¤82.14) | 02/13/2023 |
| SEWER CREDIT | (¤1,147.00) | 02/13/2023 |
| SEWER INSPECTION | ¤25.00 | 02/13/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 02/13/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 02/13/2023 |
| SITE PLAN 30 | ¤30.00 | 02/13/2023 |
| WATER- TURN ON | ¤25.00 | 02/13/2023 |
| ADJUSTMENT 50% | (¤705.12) | 02/13/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/13/2023 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 02/13/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 02/13/2023 |
| CONNECTION FEES | ¤1,166.26 | 02/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/13/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 02/13/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 02/13/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 02/13/2023 |
| IMPACT FEE FIRE | ¤841.04 | 02/13/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 02/13/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 02/13/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 02/13/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 02/13/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 02/13/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/13/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 02/13/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 02/13/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 02/13/2023 |
| SURCHARGE FS 533.721 | ¤4.41 | 02/13/2023 |
| SURCHARGE - FS 468.631 | ¤6.62 | 02/13/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/13/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤30,077.59 |