Permit #2023011127
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00510-0210 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 154 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00510 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 831-383-2883 |
| Location Address: 5 ROXTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/21/2023 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO , FL 32819 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤280,465.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/26/2024 | FINAL APPROVED | AGAETANO |
| Note: 6/25/2024 - PREVIOUS INSPECTION NOTES 6/24/2024 - PREVIOUS INSPECTION NOTES 06-24-2024 1. Multiple loose outlets. Check all. 2. AHU under county test. Unable to verify information. 3. All HVAC vents covered. Unable to verify if installed. 4. Front door covered. Unable to verify if lockable. Contractor not ready. 06-25-2024 Above issue has not been resolved. Multiple loose outlets. Check all. Back left bedroom and front room. | |||
| BLD - BUILDING FINAL | 06/25/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 6/24/2024 - PREVIOUS INSPECTION NOTES 06-24-2024 1. Multiple loose outlets. Check all. 2. AHU under county test. Unable to verify information. 3. All HVAC vents covered. Unable to verify if installed. 4. Front door covered. Unable to verify if lockable. Contractor not ready. 06-25-2024 Above issue has not been resolved. Multiple loose outlets. Check all. Back left bedroom and front room. | |||
| BLD - BUILDING FINAL | 06/24/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 06-24-2024 1. Multiple loose outlets. Check all. 2. AHU under county test. Unable to verify information. 3. All HVAC vents covered. Unable to verify if installed. 4. Front door covered. Unable to verify if lockable. Contractor not ready. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/18/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 06/14/24 tpolacek**** MET WITH DAN ON SITE AND DISCUSSED LEFT SIDE SWALE NEEDS TO BE 8' AND HUMO TAKEN OUT. RIGHT SIDE PROPERTY LINE NEEDS TO HAVE 4-1 SLOPE FROM BACK OF HOUSE TO SWALE. | |||
| ROW - STORMWATER FINAL | 06/18/2024 | APPROVED | TPOLACEK |
| Note: 06/18/24 TPOLACEK*** corrections made as a note the swale is holding water due to #7 swale being too high. the entire run has been scheduled for a regrade. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 06/14/24 tpolacek**** MET WITH DAN ON SITE AND DISCUSSED LEFT SIDE SWALE NEEDS TO BE 8' AND HUMO TAKEN OUT. RIGHT SIDE PROPERTY LINE NEEDS TO HAVE 4-1 SLOPE FROM BACK OF HOUSE TO SWALE. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/17/2024 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 06/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:38:50 PM *** has potable irr with OVB-NOcross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/14/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/14/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 06/14/24 tpolacek**** MET WITH DAN ON SITE AND DISCUSSED LEFT SIDE SWALE NEEDS TO BE 8' AND HUMO TAKEN OUT. RIGHT SIDE PROPERTY LINE NEEDS TO HAVE 4-1 SLOPE FROM BACK OF HOUSE TO SWALE. | |||
| FLOOR / WALL PENETRATION | 06/11/2024 | APPROVED | AGAETANO |
| ELECTRIC - EARLY POWER | 06/11/2024 | APPROVED | AGAETANO |
| ROW- PRE-APRON (PRE-POUR) | 05/23/2024 | APPROVED | TPOLACEK |
| Note: 05/23/24 tpolacek*** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/22/2024 - PREVIOUS INSPECTION NOTES 05/22/24 TPOLACEK*** TOO MUCH WATER IN POUR AREA. NEED TO DRAIN AND DRY OUT BEFORE NEXT INSPECTION. 5/20/2024 - PREVIOUS INSPECTION NOTES 05/20/24 TPOLACEK*** RECIEVED A TEXT FROM DAN LAIN AT 8:28AM TO CANCEL PRE POUR INSPECTION FOR TODAY AS THERE IS TOO MUCH WATER IN FOOTERS. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/22/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 05/22/24 TPOLACEK*** TOO MUCH WATER IN POUR AREA. NEED TO DRAIN AND DRY OUT BEFORE NEXT INSPECTION. 5/20/2024 - PREVIOUS INSPECTION NOTES 05/20/24 TPOLACEK*** RECIEVED A TEXT FROM DAN LAIN AT 8:28AM TO CANCEL PRE POUR INSPECTION FOR TODAY AS THERE IS TOO MUCH WATER IN FOOTERS. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/20/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 05/20/24 TPOLACEK*** RECIEVED A TEXT FROM DAN LAIN AT 8:28AM TO CANCEL PRE POUR INSPECTION FOR TODAY AS THERE IS TOO MUCH WATER IN FOOTERS. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/15/2024 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 04/25/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/25/2024 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/17/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 04-12-2024 Shield plates needed at water lines in garage.Check at next inspection. | |||
| INSULATION | 04/17/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 04-12-2024 Shield plates needed at water lines in garage.Check at next inspection. | |||
| ALL ROUGH | 04/12/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 04-12-2024 Shield plates needed at water lines in garage.Check at next inspection. | |||
| ROOF VALLEY & METAL | 04/01/2024 | APPROVED | AGAETANO |
| Note: 3/28/2024 - PREVIOUS INSPECTION NOTES 03-28-2024 Roof Valley Metal not started. No workers on site. | |||
| ROOF VALLEY & METAL | 03/28/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 03-28-2024 Roof Valley Metal not started. No workers on site. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2024 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 03/18/2024 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 03/12/2024 | APPROVED | JWALKER |
| Note: 3/11/2024 - PREVIOUS INSPECTION NOTES | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/11/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 03/11/2024 | CANCELLED BY APPLICANT | JWALKER |
| MONOLITHIC SLAB | 03/01/2024 | APPROVED | FWILLIS |
| Note: 2/29/2024 - PREVIOUS INSPECTION NOTES The 30 x 30 x 16 footing pad with 3 #5 bars each way at the left rear corner of the garage has not been installed. | |||
| MONOLITHIC SLAB | 02/29/2024 | Disapproved - NO FEE | JWALKER |
| Note: The 30 x 30 x 16 footing pad with 3 #5 bars each way at the left rear corner of the garage has not been installed. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/26/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/23/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/17/2024 | 06/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/08/2024 | 03/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/08/2024 | 03/08/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/08/2024 | 02/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/26/2024 | 01/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/14/2023 | 09/20/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/14/2023 | 09/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/14/2023 | 09/14/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no chnges for zoning only elevations | |||
| SW1 | HOLD | 08/23/2023 | 08/29/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM need to have 6% fall the first 10' off the sturcture | |||
| ENGIN1 | COMPLETE | 08/23/2023 | 08/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2023 | 08/23/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/03/2023 | 08/09/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE DRAINAGE ON LEFT AND RIGHT PROPERTY LINE DO TO THE VACANT LOTS WTER IS RUNNING TO THE STRUCTURE | |||
| ENGIN1 | COMPLETE | 08/03/2023 | 08/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/03/2023 | 08/03/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/23/2023 | 06/28/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRAINAGE IS IMPACTING THE LOT BEHIND YOURS | |||
| ZON | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/23/2023 | 06/28/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRINAGE IS IMPACTING LOT BEHIND YOURS | |||
| ENGIN1 | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/28/2023 | 05/05/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO INDACATE WHAT BEHIND YOURS ALL WATER NEEDS TO GO FROM BACK TO THE FRONT | |||
| ENGIN1 | COMPLETE | 04/28/2023 | 05/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/28/2023 | 04/28/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/17/2023 | 04/18/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/17/2023 | 04/24/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRAINAGE NEED TO GO FROM BACK TO FRONT | |||
| ENGIN1 | COMPLETE | 04/17/2023 | 04/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/15/2023 | 05/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 02/14/2023 | 02/14/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM for future submittals please do not name your files 'revised', just the file name. We will remove the previous file submitted. | |||
| ENGIN1 | COMPLETE | 02/14/2023 | 02/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/14/2023 | 02/15/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: still missing All legal information missing ( Section, Block and Lot) map panel number Square footage is different on survey than on site plan. | |||
| SW1 | HOLD | 02/14/2023 | 02/28/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1.Existing interior elevations on a 20’ grid. 2.Elevations on all adjacent properties at a minimum of 20-foot intervals, on a 10 foot offset, outside the property lines 3.Elevations on all adjacent property lines at 20-foot intervals 4.The subject lots drainage must not negatively impact any adjacent property 5.The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation | |||
| BADMIN | COMPLETE | 02/13/2023 | 02/13/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO SITE PLAN.PDF, SURVEY.PDF | |||
| BLD | COMPLETE | 01/24/2023 | 01/27/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/24/2023 | 01/26/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 01/24/2023 | 01/25/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/24/2023 | 01/25/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey. Please see attached information sheet for survey requirements. | |||
| LOCATE | COMPLETE | 01/24/2023 | 01/26/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 01/24/2023 | 01/25/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/24/2023 | 01/31/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SUBMIT A SITE PLAN WITH EXISTING ELEVATIONS AND PROPOSED ELEVATIONS | |||
| ZON | HOLD | 01/24/2023 | 01/25/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan missing : Material of Driveway, material and width of walkway. legal information missing ( Section) Square footage of lot A/c Mechanical equiptment missing please add to splan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/24/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/24/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/16/2024 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 11/21/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 11/21/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 11/21/2023 |
| IMPACT FEE FIRE | ¤420.52 | 11/21/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/21/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/21/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 11/21/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/21/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/21/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/21/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 11/21/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 11/21/2023 |
| SURCHARGE FS 533.721 | ¤5.11 | 11/21/2023 |
| SURCHARGE - FS 468.631 | ¤7.67 | 11/21/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/21/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/21/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/21/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/21/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/21/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 11/21/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 11/21/2023 |
| SEWER CREDIT | (¤1,147.00) | 11/21/2023 |
| SEWER INSPECTION | ¤25.00 | 11/21/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/21/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/21/2023 |
| SITE PLAN 30 | ¤30.00 | 11/21/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/21/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 11/21/2023 |
| WATER- TURN ON | ¤25.00 | 11/21/2023 |
| ADJUSTMENT 50% | (¤510.97) | 11/21/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/21/2023 |
| INSPECTION - RESIDENTIAL | ¤772.75 | 11/21/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤219.18 | 11/21/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,378.87 |