I want to search for...
Permit #2023011307
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00660-0040 |
| CONDITIONED SPACE: 2062 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2681 sqft |
| Block: 00660 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 904-888-6443 |
| Location Address: 6 LINDBERG PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/29/2023 |
| NOC: RECORDED |
| Applicant name: AMIR BENTOV |
| Owner: PCRE5 LLC |
|
Address 2800 N 6TH STREET ST AUGUSTINE, FL 32084 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MAVEN HOMES LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2800 N 6TH ST UNIT 790 , |
CRC1333741 (Exp: 08/31/2026) | 904-667-4330 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
JUSTIN JACKSON
| Status | Location Address | Phone |
| INACTIVE |
51 LLWELLYN TRAIL PALM COAST , FL 32164 |
386-338-1000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/25/2024 | Approval - Private Provider | PPROVIDER |
| Note: 1/24/2024 12:08:58 PM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 01/24/2024 | Disapproved- Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 01/23/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/06/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/06/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 12/06/2023 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 12/06/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 12/06/2023 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/04/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/04/23 FFE IS REQUIRED ON ALL ADJACENT PROPERTIES THIS INCLUDES THE PROPERTTY IN THE REAR _________________________________________________________________________________________________________________________ 11/13/2023 - PREVIOUS INSPECTION NOTES ** 11/13/23 BUILDER NEEDS TO SUBMIT A FINAL SURVEY INSPECTOR UNABLE TO FIND A SUBMITTED FINAL SURVEY IN PERMIT ATTACHMENT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/13/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 11/13/23 BUILDER NEEDS TO SUBMIT A FINAL SURVEY INSPECTOR UNABLE TO FIND A SUBMITTED FINAL SURVEY IN PERMIT ATTACHMENT | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/19/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ____________________________________________________________________________________________________________________ 9/18/20**23 - PREVIOUS INSPECTION NOTES ** 09/18/23 SITE NOT READY ___________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES 9/14/23= still need to shave the driveway - UPPER APRON -TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHT'S RAIN. WAY TOO SOFT TO POUR 9/11/2023 - PREVIOUS INSPECTION NOTES ** 09/11/23 HIGH SPOT IN CENTER OF DRIVEWAY ABOVE THE ROW NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA ABOVE THE ROW ** CULVERT ELEVATION GOOD AT THE TIME OF INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 09/18/2023 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 09/18/23 SITE NOT READY ___________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES 9/14/23= still need to shave the driveway - UPPER APRON -TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHT'S RAIN. WAY TOO SOFT TO POUR 9/11/2023 - PREVIOUS INSPECTION NOTES ** 09/11/23 HIGH SPOT IN CENTER OF DRIVEWAY ABOVE THE ROW NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA ABOVE THE ROW ** CULVERT ELEVATION GOOD AT THE TIME OF INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 09/14/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 9/14/23= still need to shave the driveway - UPPER APRON -TOO MUCH WATER IN THE POUR AREA. WATER INSIDE THE CULVERT FROM LAST NIGHT'S RAIN. WAY TOO SOFT TO POUR 9/11/2023 - PREVIOUS INSPECTION NOTES ** 09/11/23 HIGH SPOT IN CENTER OF DRIVEWAY ABOVE THE ROW NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA ABOVE THE ROW ** CULVERT ELEVATION GOOD AT THE TIME OF INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 09/11/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/11/23 HIGH SPOT IN CENTER OF DRIVEWAY ABOVE THE ROW NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA ABOVE THE ROW ** CULVERT ELEVATION GOOD AT THE TIME OF INSPECTION | |||
| ELECTRIC - EARLY POWER | 08/21/2023 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 07/27/2023 | APPROVED | MGIBSON |
| Note: 7/25/2023 - PREVIOUS INSPECTION NOTES 1. Address not visible from road per FBC 319.1 2. Tie in is covered up and filled with mud and water, can not see connection | |||
| U - SEWER TIE IN | 07/25/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Address not visible from road per FBC 319.1 2. Tie in is covered up and filled with mud and water, can not see connection | |||
| GRAVITY SEWER TEST | 07/25/2023 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 07/11/2023 | APPROVED | CSTONE |
| INSULATION | 07/05/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 06/28/2023 | Approval - Private Provider | PPROVIDER |
| Note: 6/27/2023 8:08:36 AM- PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 06/23/2023 | Disapproved- Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 06/20/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 06/06/2023 | CANCELLED BY APPLICANT | STHOMAS |
| WALL SHEATHING | 06/06/2023 | Approval - Private Provider | PPROVIDER |
| Note: 6/5/2023 9:17:47 AM- PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 06/06/2023 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/05/2023 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 05/16/2023 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 05/05/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/04/2023 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 04/10/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 05/15/2023 | 05/15/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM for future submittals, please name your file 'foundation survey' and upload under - foundation survey document type | |||
| ENGIN1 | COMPLETE | 05/15/2023 | 05/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/15/2023 | 05/16/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 04/05/2023 | 04/05/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM NOC needs to be recorded. | |||
| ELEC | COMPLETE | 03/07/2023 | 03/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/07/2023 | 03/13/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/07/2023 | 03/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/07/2023 | 03/07/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/22/2023 | 02/23/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs still do not match the living space of the home. Floor plan say 2062 not 2,000 | |||
| SW1 | HOLD | 02/22/2023 | 03/01/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM STILL NEED A FFE ON THE STRUCTURE | |||
| BLD | COMPLETE | 01/27/2023 | 02/01/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/27/2023 | 02/03/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 01/27/2023 | 01/27/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen and on island need to be GFCI protected. NEC 2017 210.8 2. Electric load calcs need to be done to the living space. NEC 2017 220.80 3. Submit a electrical riser diagram | |||
| ENGIN1 | COMPLETE | 01/27/2023 | 01/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/27/2023 | 01/30/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 01/27/2023 | 01/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/27/2023 | 02/01/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE A FFE ON THE STRUCTURE | |||
| ZON | COMPLETE | 01/27/2023 | 01/27/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/27/2023 | 05/04/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/25/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/25/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/29/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/29/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 03/29/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 03/29/2023 |
| SEWER CREDIT | (¤2,280.91) | 03/29/2023 |
| SEWER INSPECTION | ¤25.00 | 03/29/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/29/2023 |
| WATER CREDIT | (¤172.26) | 03/29/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/29/2023 |
| SITE PLAN 30 | ¤30.00 | 03/29/2023 |
| WATER- TURN ON | ¤25.00 | 03/29/2023 |
| ADJUSTMENT 50% | (¤15.00) | 03/29/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/29/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 03/29/2023 |
| CONNECTION FEES | ¤1,166.26 | 03/29/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/29/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/29/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 03/29/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/29/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/29/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/29/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/29/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/29/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 03/29/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/29/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/29/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/29/2023 |
| SURCHARGE FS 533.721 | ¤2.77 | 03/29/2023 |
| SURCHARGE - FS 468.631 | ¤4.16 | 03/29/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/29/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/29/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/29/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,743.39 |