I want to search for...

Permit #2023011318

Permit Details

Status: FINAL

Parcel Id: 14-11-30-5538-00000-0080
Block: 00000
Subdivision: 2130 - ST JOE CORPORATE PARK
Job Phone: 386-864-5066
Location Address: 515 PALM COAST PKWY SW
Type: CP - COMMERCIAL PLUMBING
Issue Date: 02/02/2023
NOC: Unknown
Applicant name: JACOB D CASTLE
Owner: 515 PALM COAST LLC

Address

3910 RCA BLVD STE 1015

PALM BEACH GARDENS, FL 33410

Lot: 0080
Contracted Stated Job Value: ¤2,000.00
Job Description: UNIT 18 - WATER HEATER PLUMBING FOR SALON WILDFLOWER SALON
Type: CN

Contractor

CASTLE PLUMBING LLC
Status Location Address State License Number Phone
CANCEL

508 N MOORE ST

BUNNELL, FL 32110

RF11067810 (Exp: 08/31/2027) 386-864-5066

Inspection History

Type Request Date Result Inspector
PLUMBING FINAL 03/02/2023 Disapproved - NO FEE JWALKER
Note: 3/2/23 The lavatory has not been moved. Item 3 the 60" minimum has not been met. 2/28/2023 - PREVIOUS INSPECTION NOTES Item 3 still needs to be corrected. Install male / female accesibility sign at toilet rm entry. 2/27/2023 - PREVIOUS INSPECTION NOTES 1. No hot water. 2. The lavatory is to be a maximum of 34" off of the finished floor. 606.3 Height. Lavatories and sinks shall be installed with the front of the higher of the rim or counter surface 34 inches (865 mm) maximum above the finish floor or ground. 3. The lavatory has been mounted within the 60" minimum. 604.3.1 Size. Clearance around a water closet shall be 60 inches (1525 mm) minimum measured perpendicular from the side wall and 56 inches (1420 mm) minimum measured perpendicular from the rear wall. 4. The grab bar on the side wall of the toilet is to be 42" minimum a 36" has been installed. 5. The T & P over flow pipe at the water heater is to be a minimum of 3/4" pipe.
PLUMBING FINAL 03/02/2023 FINAL APPROVED JWALKER
Note: 3/2/2023 - PREVIOUS INSPECTION NOTES 3/2/23 The lavatory has not been moved. Item 3 the 60" minimum has not been met. 2/28/2023 - PREVIOUS INSPECTION NOTES Item 3 still needs to be corrected. Install male / female accesibility sign at toilet rm entry. 2/27/2023 - PREVIOUS INSPECTION NOTES 1. No hot water. 2. The lavatory is to be a maximum of 34" off of the finished floor. 606.3 Height. Lavatories and sinks shall be installed with the front of the higher of the rim or counter surface 34 inches (865 mm) maximum above the finish floor or ground. 3. The lavatory has been mounted within the 60" minimum. 604.3.1 Size. Clearance around a water closet shall be 60 inches (1525 mm) minimum measured perpendicular from the side wall and 56 inches (1420 mm) minimum measured perpendicular from the rear wall. 4. The grab bar on the side wall of the toilet is to be 42" minimum a 36" has been installed. 5. The T & P over flow pipe at the water heater is to be a minimum of 3/4" pipe.
PLUMBING FINAL 02/28/2023 Disapproved - NO FEE JWALKER
Note: Item 3 still needs to be corrected. Install male / female accesibility sign at toilet rm entry. 2/27/2023 - PREVIOUS INSPECTION NOTES 1. No hot water. 2. The lavatory is to be a maximum of 34" off of the finished floor. 606.3 Height. Lavatories and sinks shall be installed with the front of the higher of the rim or counter surface 34 inches (865 mm) maximum above the finish floor or ground. 3. The lavatory has been mounted within the 60" minimum. 604.3.1 Size. Clearance around a water closet shall be 60 inches (1525 mm) minimum measured perpendicular from the side wall and 56 inches (1420 mm) minimum measured perpendicular from the rear wall. 4. The grab bar on the side wall of the toilet is to be 42" minimum a 36" has been installed. 5. The T & P over flow pipe at the water heater is to be a minimum of 3/4" pipe.
PLUMBING FINAL 02/27/2023 Disapproved - NO FEE JWALKER
Note: 1. No hot water. 2. The lavatory is to be a maximum of 34" off of the finished floor. 606.3 Height. Lavatories and sinks shall be installed with the front of the higher of the rim or counter surface 34 inches (865 mm) maximum above the finish floor or ground. 3. The lavatory has been mounted within the 60" minimum. 604.3.1 Size. Clearance around a water closet shall be 60 inches (1525 mm) minimum measured perpendicular from the side wall and 56 inches (1420 mm) minimum measured perpendicular from the rear wall. 4. The grab bar on the side wall of the toilet is to be 42" minimum a 36" has been installed. 5. The T & P over flow pipe at the water heater is to be a minimum of 3/4" pipe.
PLUMBING 2ND ROUGH 02/08/2023 APPROVED JWALKER
Note: 2/7/2023 - PREVIOUS INSPECTION NOTES 2/7/23 The head test is not holding water. 2/6/2023 - PREVIOUS INSPECTION NOTES 1. Place the 2" drain line with the 3 shampoo stations under head test. 2. Owner mention the end of that line will be getting moved down 2' to allow for the sink to fit properly please have that line completed before reinspection. 3. Note the bathroom will need to be brought up to current accessiblilty codes. Ensure the exposed washing machine drain running in the bathroom will not interfear with the accessibilty for handi cap access.
PLUMBING 2ND ROUGH 02/07/2023 Disapproved - NO FEE JWALKER
Note: 2/7/23 The head test is not holding water. 2/6/2023 - PREVIOUS INSPECTION NOTES 1. Place the 2" drain line with the 3 shampoo stations under head test. 2. Owner mention the end of that line will be getting moved down 2' to allow for the sink to fit properly please have that line completed before reinspection. 3. Note the bathroom will need to be brought up to current accessiblilty codes. Ensure the exposed washing machine drain running in the bathroom will not interfear with the accessibilty for handi cap access.
PLUMBING 2ND ROUGH 02/06/2023 Disapproved - NO FEE JWALKER
Note: 1. Place the 2" drain line with the 3 shampoo stations under head test. 2. Owner mention the end of that line will be getting moved down 2' to allow for the sink to fit properly please have that line completed before reinspection. 3. Note the bathroom will need to be brought up to current accessiblilty codes. Ensure the exposed washing machine drain running in the bathroom will not interfear with the accessibilty for handi cap access.

Review History

Department Status Date In Date Out
PLUM COMPLETE 02/01/2023 02/01/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN INFORMATION 02/01/2023 02/01/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NO RISER UPLOADED
BADMIN COMPLETE 01/31/2023 01/31/2023
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM 1. RENAME TO RISER.PDF, PLANS.PDF
PLUM HOLD 01/27/2023 01/30/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide a Plumbing Riser Diagram showing vent and drain sizes. 2. Provide Floor Plan showing the locations of the proposed plumbing fixtures.
UD1 CANCEL 01/27/2023 01/27/2023

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤83.75) 02/02/2023
ADMINISTRATIVE - COMMERCIAL ¤75.00 02/02/2023
INSPECTION - PLUMBING ¤60.00 02/02/2023
PLAN REVIEW - MISC 32.50 ¤32.50 02/02/2023
SURCHARGE FS 533.721 ¤2.00 02/02/2023
SURCHARGE - FS 468.631 ¤2.00 02/02/2023
Fees Total Due: ¤0.00 Total Paid: ¤87.75