I want to search for...

Permit #2023011403

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00580-0220
CONDITIONED SPACE: 2295 sqft
GARAGE: 538 sqft
OPENED PORCH (WITH ROOF) : 201 sqft
OPENED PORCH (WITH ROOF) : 229 sqft
Total Square Footage: 3263 sqft
Block: 00580
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 912-258-2201
Location Address: 3 RIVERSIDE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/10/2023
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 0220
Contracted Stated Job Value: ¤215,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 10/19/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------- 10/17/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT 2) NEED TO HAVE BAHIA SOD ON ALL BARE AREAS IN THE RIGHT OF WAY AND ALL SOD NEEDS TO MATCH THE EXISTING GRADE SURROUNDING IT
U -UTILITY RESIDENTIAL FINAL 10/19/2023 APPROVED - AS NOTED LFITZGERALD
Note: clean out cap too low and being covered by sod-please raise so flush with sod so it can be accessible-photo to me when done 10/17/2023 - PREVIOUS INSPECTION NOTES sewer cap not fitted on sewer riser pipe-pipe is cut wrong-cap will not fit securely-cut pipe flush and secure cap
ROW - STORMWATER FINAL 10/17/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT 2) NEED TO HAVE BAHIA SOD ON ALL BARE AREAS IN THE RIGHT OF WAY AND ALL SOD NEEDS TO MATCH THE EXISTING GRADE SURROUNDING IT
U -UTILITY RESIDENTIAL FINAL 10/17/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: sewer cap not fitted on sewer riser pipe-pipe is cut wrong-cap will not fit securely-cut pipe flush and secure cap
BLD - BUILDING FINAL 10/17/2023 FINAL APPROVED JWALKER
U-CROSS CONNECTION 10/17/2023 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with DBL check-no cross connection
ROW - FINAL APRON (AFTER POUR) 10/16/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/16/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/16/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 09/08/2023 APPROVED JWALKER
U - SEWER TIE IN 08/15/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 08/15/2023 APPROVED - AS NOTED GBERTOLA
Note: 8/15/23= AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAINS PLEASE, BUILD SHOULD DOUBLE CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
PEP TANK INSTALLATION REQUEST 08/01/2023 APPROVED CBOWERMASTER
INSULATION 07/24/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 7/18/23 1. Bearing wall top plate at the dryer duct and the plumbing vent where it has been notched Install 16 gauge 1.5 inch wide metal tie. Each side of the tie is to have (8) 10d nails per side. Check for correction at Insulation inspection. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23 1. Install a nail plate grage wall top plate for the 2" pvc plumbing vent. 2. Dryer vent duct has been has been compressed at the top plate and the mechanical joint is not sealed. 3. Below listed corrections from previous inspection have not been completed. Please not also the SDWC screws used at the bearing wall have only been installed every other stud. 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite.
ALL ROUGH 07/18/2023 APPROVED - AS NOTED JWALKER
Note: 7/18/23 1. Bearing wall top plate at the dryer duct and the plumbing vent where it has been notched Install 16 gauge 1.5 inch wide metal tie. Each side of the tie is to have (8) 10d nails per side. Check for correction at Insulation inspection. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23 1. Install a nail plate grage wall top plate for the 2" pvc plumbing vent. 2. Dryer vent duct has been has been compressed at the top plate and the mechanical joint is not sealed. 3. Below listed corrections from previous inspection have not been completed. Please not also the SDWC screws used at the bearing wall have only been installed every other stud. 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite.
ALL ROUGH 07/07/2023 Disapproved -FEE REQUIRED JWALKER
Note: 7/7/23 1. Install a nail plate grage wall top plate for the 2" pvc plumbing vent. 2. Dryer vent duct has been has been compressed at the top plate and the mechanical joint is not sealed. 3. Below listed corrections from previous inspection have not been completed. Please not also the SDWC screws used at the bearing wall have only been installed every other stud. 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite.
LATH/BRICK/ WATER BARRIER 07/07/2023 APPROVED JWALKER
Note: Inspector Notes from Inspection 2460 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/28/2023 APPROVED - AS NOTED JWALKER
Note: 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/26/2023 Disapproved - NO FEE JWALKER
Note: 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite.
ROOF VALLEY & METAL 06/15/2023 APPROVED JWALKER
ROOF SHEATHING 06/08/2023 APPROVED JWALKER
WALL SHEATHING 06/08/2023 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 05/30/2023 APPROVED TDOAK
TIE BEAM / LINTEL 05/19/2023 APPROVED JWALKER
MONOLITHIC SLAB 05/12/2023 APPROVED JWALKER
Note: 5/10/2023 - PREVIOUS INSPECTION NOTES 1. Please see the prints in the job box. Again the foundation plan does not show footing section detials. 2. The slab at the left side of the building is not meeting the required 4" minimum thickness. Test string lines have been left in place. Please remove excess soil and tamp and reinstalled string lines for reinspection. 5/9/2023 - PREVIOUS INSPECTION NOTES The foundation plan provided has no details as to the type of footing to be installed.
MONOLITHIC SLAB 05/10/2023 Disapproved - NO FEE JWALKER
Note: 1. Please see the prints in the job box. Again the foundation plan does not show footing section detials. 2. The slab at the left side of the building is not meeting the required 4" minimum thickness. Test string lines have been left in place. Please remove excess soil and tamp and reinstalled string lines for reinspection. 5/9/2023 - PREVIOUS INSPECTION NOTES The foundation plan provided has no details as to the type of footing to be installed.
MONOLITHIC SLAB 05/09/2023 Disapproved - NO FEE JWALKER
Note: The foundation plan provided has no details as to the type of footing to be installed.
PLUMBING 1ST ROUGH UNDERGROUND 05/04/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 05/04/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 04/17/2023 APPROVED CSTONE
Note: 3/31/2023 3:22:04 PM- PREVIOUS INSPECTION NOTES NOT CLEARED
WATER METER INSTALLATION REQUEST 03/30/2023 Disapproved - NO FEE CSTONE
Note: NOT CLEARED

Review History

Department Status Date In Date Out
BADMIN INFORMATION 10/17/2023 10/17/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Termite certificate needs to be uploaded.
BLD COMPLETE 07/13/2023 07/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/30/2023 05/30/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/30/2023 05/30/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 02/21/2023 02/28/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/21/2023 02/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/21/2023 02/21/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 02/07/2023 02/13/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. Proposed elevations are to be clearly noted and discernible from the existing survey data. (A) The proposed elevations shall be shown at all locations of existing elevations per the . topographic survey. (A). Elevations on all adjacent property lines at 20-foot intervals. (B)
BLD COMPLETE 01/30/2023 02/01/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 01/30/2023 02/02/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 01/30/2023 01/31/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/30/2023 01/30/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/30/2023 01/31/2023
Note: Released By: TONI CHURCHILL - -
MECH COMPLETE 01/30/2023 01/31/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 01/30/2023 02/06/2023
Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM RIGHT AND LEFT FRONT CORNERS OF HOUSE NEED TO HAVE SOD ELEVATIONS, ALSO ANY EXISTING ELEVATIONS NEED TO A A PROPOSED ELEVATION. ACROSS FRONT PROPERTY LINE NEEDS TO BE EQUAL OR GREATER THAN THE CENTER LINE OF THE ROAD
ZON COMPLETE 01/30/2023 01/31/2023
Note: Released By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM
SWALE COMPLETE 01/30/2023 05/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 10/19/2023
REINSPECTION FEE ¤40.00 10/19/2023
SW ENG REINSPECTION 20 ¤20.00 10/19/2023
SW ENG - REVIEW 20 ¤20.00 03/10/2023
SW ENG RES REVIEW 200 ¤200.00 03/10/2023
TRANS IMPACT FEE ADMIN ¤54.36 03/10/2023
TRANS IMPACT FEE ADMIN (¤54.36) 03/10/2023
SEWER CREDIT (¤1,342.00) 03/10/2023
SEWER INSPECTION ¤25.00 03/10/2023
SEWER CAPITAL FACILITY ¤5,344.82 03/10/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 03/10/2023
SITE PLAN 30 ¤30.00 03/10/2023
SURCHARGE FS 533.721 ¤3.43 03/10/2023
SURCHARGE - FS 468.631 ¤5.15 03/10/2023
SW ENG - FOUNDATION SURVEY ¤20.00 03/10/2023
SW ENG INSPECTION 80 ¤80.00 03/10/2023
SW ENG PRE APRON ¤30.00 03/10/2023
WATER- TURN ON ¤25.00 03/10/2023
ADJUSTMENT 50% (¤533.91) 03/10/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/10/2023
INSPECTION - RESIDENTIAL ¤808.50 03/10/2023
PLAN REVIEW - RESIDENTIAL ¤229.32 03/10/2023
CONNECTION FEES ¤1,166.26 03/10/2023
FIRE IMPACT FEE ADMIN ¤12.62 03/10/2023
FIRE IMPACT FEE ADMIN (¤12.62) 03/10/2023
FC IMPACT FEE EMS ¤62.00 03/10/2023
IMPACT FEE FIRE ¤420.52 03/10/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/10/2023
FC IMPACT FEE LIBRARY ¤268.00 03/10/2023
IMPACT FEE PARKS ¤1,769.15 03/10/2023
IMPACT FEE SCHOOL ¤5,450.00 03/10/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 03/10/2023
WATER -IRRIGATION INSPECTION ¤25.00 03/10/2023
PARKS IMPACT FEE ADMIN ¤53.07 03/10/2023
PARKS IMPACT FEE ADMIN (¤53.07) 03/10/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,190.12