I want to search for...
Permit #2023011403
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00580-0220 |
| CONDITIONED SPACE: 2295 sqft |
| GARAGE: 538 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 3263 sqft |
| Block: 00580 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 912-258-2201 |
| Location Address: 3 RIVERSIDE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/10/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤215,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 10/19/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------- 10/17/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT 2) NEED TO HAVE BAHIA SOD ON ALL BARE AREAS IN THE RIGHT OF WAY AND ALL SOD NEEDS TO MATCH THE EXISTING GRADE SURROUNDING IT | |||
| U -UTILITY RESIDENTIAL FINAL | 10/19/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: clean out cap too low and being covered by sod-please raise so flush with sod so it can be accessible-photo to me when done 10/17/2023 - PREVIOUS INSPECTION NOTES sewer cap not fitted on sewer riser pipe-pipe is cut wrong-cap will not fit securely-cut pipe flush and secure cap | |||
| ROW - STORMWATER FINAL | 10/17/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT 2) NEED TO HAVE BAHIA SOD ON ALL BARE AREAS IN THE RIGHT OF WAY AND ALL SOD NEEDS TO MATCH THE EXISTING GRADE SURROUNDING IT | |||
| U -UTILITY RESIDENTIAL FINAL | 10/17/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: sewer cap not fitted on sewer riser pipe-pipe is cut wrong-cap will not fit securely-cut pipe flush and secure cap | |||
| BLD - BUILDING FINAL | 10/17/2023 | FINAL APPROVED | JWALKER |
| U-CROSS CONNECTION | 10/17/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with DBL check-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 10/16/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/16/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/16/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 09/08/2023 | APPROVED | JWALKER |
| U - SEWER TIE IN | 08/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 08/15/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: 8/15/23= AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAINS PLEASE, BUILD SHOULD DOUBLE CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| PEP TANK INSTALLATION REQUEST | 08/01/2023 | APPROVED | CBOWERMASTER |
| INSULATION | 07/24/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 7/18/23 1. Bearing wall top plate at the dryer duct and the plumbing vent where it has been notched Install 16 gauge 1.5 inch wide metal tie. Each side of the tie is to have (8) 10d nails per side. Check for correction at Insulation inspection. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23 1. Install a nail plate grage wall top plate for the 2" pvc plumbing vent. 2. Dryer vent duct has been has been compressed at the top plate and the mechanical joint is not sealed. 3. Below listed corrections from previous inspection have not been completed. Please not also the SDWC screws used at the bearing wall have only been installed every other stud. 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite. | |||
| ALL ROUGH | 07/18/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 7/18/23 1. Bearing wall top plate at the dryer duct and the plumbing vent where it has been notched Install 16 gauge 1.5 inch wide metal tie. Each side of the tie is to have (8) 10d nails per side. Check for correction at Insulation inspection. 7/7/2023 - PREVIOUS INSPECTION NOTES 7/7/23 1. Install a nail plate grage wall top plate for the 2" pvc plumbing vent. 2. Dryer vent duct has been has been compressed at the top plate and the mechanical joint is not sealed. 3. Below listed corrections from previous inspection have not been completed. Please not also the SDWC screws used at the bearing wall have only been installed every other stud. 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite. | |||
| ALL ROUGH | 07/07/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 7/7/23 1. Install a nail plate grage wall top plate for the 2" pvc plumbing vent. 2. Dryer vent duct has been has been compressed at the top plate and the mechanical joint is not sealed. 3. Below listed corrections from previous inspection have not been completed. Please not also the SDWC screws used at the bearing wall have only been installed every other stud. 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite. | |||
| LATH/BRICK/ WATER BARRIER | 07/07/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/28/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 6/28/23 1 Install hold down anchor at truss TGO1, At the side bearing on the wood framed wall. 2. Please submit the engineering revision to the building department for the bearing wall that is replacing the SP anchors with the SDWC screws at the top and bottom of the 16" o.c. studs. Check for corrections at the ALL ROUGH INSPECTION. 6/26/2023 - PREVIOUS INSPECTION NOTES 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/26/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Unable to locate truss layout print. 2. SP anchors at the bearing wall have not been installed. 3. Over framing missing hold down anchors at bottom of the rafters. Check all hold down anchors at truss ends and engineering at reispection. Please ensure truss layout is onsite. | |||
| ROOF VALLEY & METAL | 06/15/2023 | APPROVED | JWALKER |
| ROOF SHEATHING | 06/08/2023 | APPROVED | JWALKER |
| WALL SHEATHING | 06/08/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 05/30/2023 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 05/19/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 05/12/2023 | APPROVED | JWALKER |
| Note: 5/10/2023 - PREVIOUS INSPECTION NOTES 1. Please see the prints in the job box. Again the foundation plan does not show footing section detials. 2. The slab at the left side of the building is not meeting the required 4" minimum thickness. Test string lines have been left in place. Please remove excess soil and tamp and reinstalled string lines for reinspection. 5/9/2023 - PREVIOUS INSPECTION NOTES The foundation plan provided has no details as to the type of footing to be installed. | |||
| MONOLITHIC SLAB | 05/10/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Please see the prints in the job box. Again the foundation plan does not show footing section detials. 2. The slab at the left side of the building is not meeting the required 4" minimum thickness. Test string lines have been left in place. Please remove excess soil and tamp and reinstalled string lines for reinspection. 5/9/2023 - PREVIOUS INSPECTION NOTES The foundation plan provided has no details as to the type of footing to be installed. | |||
| MONOLITHIC SLAB | 05/09/2023 | Disapproved - NO FEE | JWALKER |
| Note: The foundation plan provided has no details as to the type of footing to be installed. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/04/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 05/04/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/17/2023 | APPROVED | CSTONE |
| Note: 3/31/2023 3:22:04 PM- PREVIOUS INSPECTION NOTES NOT CLEARED | |||
| WATER METER INSTALLATION REQUEST | 03/30/2023 | Disapproved - NO FEE | CSTONE |
| Note: NOT CLEARED |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 10/17/2023 | 10/17/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Termite certificate needs to be uploaded. | |||
| BLD | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/30/2023 | 05/30/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/30/2023 | 05/30/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/21/2023 | 02/28/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/21/2023 | 02/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/21/2023 | 02/21/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/07/2023 | 02/13/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. Proposed elevations are to be clearly noted and discernible from the existing survey data. (A) The proposed elevations shall be shown at all locations of existing elevations per the . topographic survey. (A). Elevations on all adjacent property lines at 20-foot intervals. (B) | |||
| BLD | COMPLETE | 01/30/2023 | 02/01/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/30/2023 | 02/02/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 01/30/2023 | 01/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/30/2023 | 01/30/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/30/2023 | 01/31/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 01/30/2023 | 01/31/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/30/2023 | 02/06/2023 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM RIGHT AND LEFT FRONT CORNERS OF HOUSE NEED TO HAVE SOD ELEVATIONS, ALSO ANY EXISTING ELEVATIONS NEED TO A A PROPOSED ELEVATION. ACROSS FRONT PROPERTY LINE NEEDS TO BE EQUAL OR GREATER THAN THE CENTER LINE OF THE ROAD | |||
| ZON | COMPLETE | 01/30/2023 | 01/31/2023 |
| Note: Released By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/30/2023 | 05/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/19/2023 |
| REINSPECTION FEE | ¤40.00 | 10/19/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/19/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/10/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/10/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 03/10/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 03/10/2023 |
| SEWER CREDIT | (¤1,342.00) | 03/10/2023 |
| SEWER INSPECTION | ¤25.00 | 03/10/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/10/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/10/2023 |
| SITE PLAN 30 | ¤30.00 | 03/10/2023 |
| SURCHARGE FS 533.721 | ¤3.43 | 03/10/2023 |
| SURCHARGE - FS 468.631 | ¤5.15 | 03/10/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/10/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/10/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/10/2023 |
| WATER- TURN ON | ¤25.00 | 03/10/2023 |
| ADJUSTMENT 50% | (¤533.91) | 03/10/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/10/2023 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 03/10/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 03/10/2023 |
| CONNECTION FEES | ¤1,166.26 | 03/10/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/10/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/10/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 03/10/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/10/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/10/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/10/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/10/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/10/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 03/10/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/10/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/10/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/10/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,190.12 |