I want to search for...
Permit #2023020251
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7016-0RP0B-0000 |
| CONDITIONED SPACE: 1195 sqft |
| GARAGE: 407 sqft |
| Total Square Footage: 1602 sqft |
| Block: 0RP0B |
| Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE |
| Job Phone: (386)445-9393 |
| Location Address: 1370 PALM HARBOR PKWY |
| Type: BA - BUILDING ADDITION |
| Issue Date: 04/27/2023 |
| NOC: Unknown |
| Applicant name: ANTONIO JR AMARAL |
| Owner: AMARAL ANTONIO JR & CARLA H&W |
|
Address 1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
| Lot: 0000 |
| Contracted Stated Job Value: ¤100.00 |
| Job Description: ADDITION REF # 2021031639 |
| Type: CN |
| Original Permit #: 2021031639 |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/28/2023 | FINAL APPROVED | RMARTIN |
| U -UTILITY RESIDENTIAL FINAL | 04/28/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL INSPECTION | 03/03/2023 | FINAL APPROVED | PFLANAGAN |
| Note: No Final Survey Needed. Concrete Slab was existing. Drainage patter would not have changed. 2/9/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE A FINAL SURVEY FOR THIS ADDITION DO TO ADDITION IS OVER 300SQFT | |||
| ROW - FINAL INSPECTION | 02/09/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO HAVE A FINAL SURVEY FOR THIS ADDITION DO TO ADDITION IS OVER 300SQFT | |||
| INSULATION | 04/13/2022 | APPROVED | RMARTIN |
| LATH/BRICK/ WATER BARRIER | 04/11/2022 | APPROVED | RMARTIN |
| ALL ROUGH | 04/08/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Job box on the ground and filled with water. Cannot complete inspection, drawings are wet. 1. Please provide bearing wall detail. 2. Bearing wall drawings are blurry. 3. Please provide approved truss layout drawings. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/19/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: THIS IS A REINSPECTION Job box on the ground and filled with water. Cannot complete inspection, drawings are wet. 1. Please provide bearing wall detail. 2. Bearing wall drawings are blurry. 3. Please provide approved truss layout drawings. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/18/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Job box on the ground and filled with water. Cannot complete inspection, drawings are wet. | |||
| TIE BEAM / LINTEL | 12/06/2021 | APPROVED | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 12/01/2021 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 10/22/2021 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION missing connection at breezeway per plans. missing detail 3 at garage wall area per plans. missing compaction report. missing termite treatment or intenet to treat certificate. bathroom is flipped from plans Need revision for changes 10-21-21... notes above resolved | |||
| MONOLITHIC SLAB | 10/18/2021 | Disapproved - NO FEE | LMILLER |
| Note: missing connection at breezeway per plans. missing detail 3 at garage wall area per plans. missing compaction report. missing termite treatment or intenet to treat certificate. bathroom is flipped from plans Need revision for changes | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/01/2021 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/30/2021 | 12/01/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/30/2021 | 12/01/2021 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/20/2021 | 10/21/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 10/20/2021 | 10/21/2021 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/13/2021 | 07/13/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/09/2021 | 06/10/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/09/2021 | 06/10/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2nd Request Riser diagram is not legible. | |||
| PLUM | COMPLETE | 06/09/2021 | 06/16/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/09/2021 | 06/17/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/25/2021 | 03/31/2021 |
| Note: Held By: JOHN BODEN - (386)986-2624 - JBODEN@PALMCOASTGOV.COM Provide plans with verifiable digital signature. Existing slab was permitted as patio/slab and had no footing inspections performed. Please provide Engineers letter certifying the existance of footings called out on plan. Provide Product Approval for roofing underlayment | |||
| ELEC | HOLD | 03/25/2021 | 03/29/2021 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs to show that the existing service can accomodate the new building. Riser diagram is not legible. | |||
| MECH | HOLD | 03/25/2021 | 03/26/2021 |
| Note: Held By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM Provide heatload and duct layout. Not in Energy calc packet | |||
| PLUM | HOLD | 03/25/2021 | 03/31/2021 |
| Note: Held By: JOHN BODEN - (386)986-2624 - JBODEN@PALMCOASTGOV.COM Provide riser diagram for supply and waste | |||
| SW1 | COMPLETE | 03/25/2021 | 03/31/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/25/2021 | 03/26/2021 |
| Note: Released By: TRACEY DOAK - (386)986-2473 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤219.88) | 04/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/27/2023 |
| INSPECTION - RESIDENTIAL | ¤409.75 | 04/27/2023 |
| SURCHARGE FS 533.721 | ¤2.26 | 04/27/2023 |
| SURCHARGE - FS 468.631 | ¤3.38 | 04/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/27/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/03/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤350.51 |