Permit #2023020266

Permit Details

Status: FINAL

Parcel Id: 06-12-31-0000-000A0-0014
Total Square Footage: 12570 sqft
Block: 000A0
Subdivision: 2120 - Royal Palms Tennis Center Subdivision
Job Phone: 904-219-5939
Location Address: 1280 BELLE TERRE PKWY
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 02/08/2023
NOC: Unknown
Applicant name: CARY LYLE SHIPPERT
Owner: CITY OF PALM COAST

Address

160 LAKE AVENUE

PALM COAST, FL 32164

Lot: 0014
Job Description: SITE WORK - RECREATIONAL CENTER
Type: CN

Contractor

GILBANE BUILDING COMPANY
Status Location Address State License Number Phone
INACTIVE

10201 CENTURION PAKWAY N SUITE 500

JACKSONVILLE, FL 32256

CGC1511537 (Exp: 08/31/2026) 904-900-6349

Inspection History

Type Request Date Result Inspector
U - UTILITY COMMERCIAL FINAL 05/30/2025 FINAL APPROVED LFITZGERALD
CLOSE OUT DOCUMENTS 03/11/2025 APPROVED DRAMIREZ
Note: Close out documents submitted a year ago.
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 02/15/2024 APPROVED DRAMIREZ
BLD- ADA VEHICULAR WAY 01/08/2024 APPROVED FWILLIS
Note: 12/28/2023 - PREVIOUS INSPECTION NOTES RAMP AND LIGHTING AT THE DROP OFF/PICK-UP AREA NEEDS CLARIFICATION. TRUNCATED DOMES MISSING AND LIGHTS MIGHT BE IN THE TRAVEL PATH.
LDSC- LANDSCAPE FINAL 01/05/2024 APPROVED RPICATAGI
UC-FINAL SITE INSPECTION 01/04/2024 FINAL APPROVED JHARDING
UROW-RETENT/DETENT STABILI 01/04/2024 APPROVED JHARDING
Note: 12/28/2023 - PREVIOUS INSPECTION NOTES
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 01/04/2024 APPROVED JHARDING
Note: 12/28/2023 - PREVIOUS INSPECTION NOTES
LDSC-IRRIGATION FINAL 01/03/2024 CANCELLED BY INSPECTOR RPICATAGI
Note: rescheduled by Inspector for Thursday, Jan 4th, 2024
BLD- ADA PARKING 12/28/2023 APPROVED FWILLIS
BLD- ADA VEHICULAR WAY 12/28/2023 Disapproved - NO FEE FWILLIS
Note: RAMP AND LIGHTING AT THE DROP OFF/PICK-UP AREA NEEDS CLARIFICATION. TRUNCATED DOMES MISSING AND LIGHTS MIGHT BE IN THE TRAVEL PATH.
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 12/28/2023 PARTIALLY APPROVED DHANEY
UROW-RETENT/DETENT STABILI 12/28/2023 PARTIALLY APPROVED DHANEY
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 12/19/2023 APPROVED JHARDING
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 12/19/2023 APPROVED RPICATAGI
UC- PRELIMINARY AS-BUILTS 12/19/2023 APPROVED JHARDING
UC-DRAINAGE PIPE PLACEMENT/LAMPING 12/19/2023 APPROVED JHARDING
U-GRAVITY SEWER INSTALL/TESTING 12/14/2023 APPROVED JHARDING
Note: 12/6/2023 - PREVIOUS INSPECTION NOTES Not ready 3/29/2023 - PREVIOUS INSPECTION NOTES Not ready
U-WATER MAIN DISINFECTION 12/06/2023 APPROVED JHARDING
U-WATER MAIN DISINFECTION SAMPLING 12/06/2023 APPROVED JHARDING
U-WATER SERVICE INSTALLATION 12/06/2023 APPROVED JHARDING
U-GRAVITY SEWER INSTALL/TESTING 12/06/2023 CANCELLED BY APPLICANT JHARDING
Note: Not ready 3/29/2023 - PREVIOUS INSPECTION NOTES Not ready
U-WATER METER INSTALLATION/VERIFICATION 12/06/2023 APPROVED JHARDING
UC-SUBSTANTIAL WALK-THRU 12/06/2023 APPROVED JHARDING
U-GREASE INTERCEPTOR FLOW/DYE TESTED 12/06/2023 APPROVED JHARDING
UC-DRAINAGE STRUCT PLACMNT 12/06/2023 APPROVED JHARDING
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 12/06/2023 APPROVED JHARDING
Note: 3/29/2023 - PREVIOUS INSPECTION NOTES Not ready
UROW- CURBING & GUTTER 12/06/2023 APPROVED JHARDING
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 11/30/2023 APPROVED JHARDING
BLD - UNDERGROUND SITE LIGHTING CONDUITS 11/27/2023 APPROVED RMARTIN
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 11/22/2023 APPROVED FWILLIS
Note: 11/20/2023 - PREVIOUS INSPECTION NOTES 11/20/23 - Performed a Courtesy Inspection at north elevation ADA ramp. The upper portion was not ready. Waiting for FPL to remove two containers. Inspector Notes from Inspection 1510 concrete pole base electrical
BLD - SITE LIGHTING-POLE SET/FIXTURE 11/22/2023 APPROVED FWILLIS
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 11/20/2023 PARTIALLY APPROVED FWILLIS
Note: 11/20/23 - Performed a Courtesy Inspection at north elevation ADA ramp. The upper portion was not ready. Waiting for FPL to remove two containers. Inspector Notes from Inspection 1510 concrete pole base electrical
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 11/07/2023 CANCELLED BY APPLICANT WEB
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 11/07/2023 APPROVED - AS NOTED RMARTIN
Note: concrete pole base electrical
U-GREASE INTERCEPTOR PRE-INSTALLATION 04/17/2023 APPROVED LFITZGERALD
Note: Correct DOH now provided 4/14/2023 - PREVIOUS INSPECTION NOTES inspection scheduled after deilvery,no DOH legend number on grease unit and contractor not yet able to provide approved unit nummber, please schedule this inspection when 10 digit DOH number is provided to make sure it meets city approval with it's records-photo of grease note 4-Legend included
U-GREASE INTERCEPTOR PRE-INSTALLATION 04/14/2023 PARTIALLY APPROVED LFITZGERALD
Note: inspection scheduled after deilvery,no DOH legend number on grease unit and contractor not yet able to provide approved unit nummber, please schedule this inspection when 10 digit DOH number is provided to make sure it meets city approval with it's records-see note 4 of grease details in approved plans regarding legend
U-WATER SERVICE INSTALLATION 03/30/2023 CANCELLED BY APPLICANT WEB
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/29/2023 CANCELLED BY APPLICANT JHARDING
Note: Not ready
U-GRAVITY SEWER INSTALL/TESTING 03/29/2023 CANCELLED BY APPLICANT JHARDING
Note: Not ready
UC-CONSTRUCTION ENTRANCE 03/15/2023 APPROVED JHARDING
LDSC-TREE BARRICADE 03/15/2023 APPROVED RPICATAGI
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/15/2023 APPROVED JHARDING

Review History

Department Status Date In Date Out
BLD COMPLETE 11/03/2023 11/03/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 10/30/2023 10/30/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The approved civil set is not to be uploaded with the permit, any revisions, etc. would be handled though the site development review process (planning division). not through the site develoment permit which is issued after the plans and develoment order have been approved.
BLD CANCEL 08/15/2023 08/17/2023
ELEC COMPLETE 08/15/2023 08/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG CANCEL 08/15/2023 08/17/2023
PLLA COMPLETE 08/15/2023 08/16/2023
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
UD1 COMPLETE 08/15/2023 08/16/2023
Note: Released By: BRICE WRIGHT - (386)986-2398 - BWRIGHT@PALMCOASTGOV.COM
BLD COMPLETE 02/07/2023 02/07/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 02/07/2023 02/07/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 02/07/2023 02/07/2023
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 02/07/2023 02/07/2023
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 02/07/2023 02/08/2023
Note: Released By: BRICE WRIGHT - -

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤122.50) 02/08/2023
ADMINISTRATIVE- SITE DEVELOP ¤125.00 02/08/2023
SITE INSPECTION ¤520.00 02/08/2023
SITE PLAN 30 ¤30.00 02/08/2023
Fees Total Due: ¤0.00 Total Paid: ¤552.50