Permit #2023020526
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00420-0020 |
| CONDITIONED SPACE: 2475 sqft |
| GARAGE: 495 sqft |
| OPENED PORCH (WITH ROOF) : 265 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| Total Square Footage: 3275 sqft |
| Block: 00420 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 912-258-2201 |
| Location Address: 54 RICHMOND DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/03/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS, GA 31522 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤235,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/30/2023 | FINAL APPROVED | JWALKER |
| Note: 10/27/2023 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 10/27/2023 | CANCELLED BY APPLICANT | JWALKER |
| U-CROSS CONNECTION | 10/25/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with DBL CHECK- no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 10/25/2023 | APPROVED | FSLADISH |
| Note: 10/25/23 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 10/25/2023 | APPROVED | FSLADISH |
| Note: 10/25/23 EVERYTHING MET CITY STANDARDS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/25/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/24/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/24/2023 | APPROVED | FSLADISH |
| Note: 10/24/23 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 09/13/2023 | APPROVED | JWALKER |
| U - SEWER TIE IN | 08/29/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 08/07/2023 | APPROVED | CBOWERMASTER |
| INSULATION | 08/04/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 7/27/23 The revision sent in is not what needs to be changed. The floor plan page 2 of the drawing does not show wall details. PAGE 2 will need to be revised and submitted showing which walls are bearing and which walls are non bearing. THIS WILL NEED TO BE COMPLETED BEFORE INSULATION INSPECTION CAN BE PASSED. 7/21/2023 - PREVIOUS INSPECTION NOTES 7/21/23 Still missing revision for bearing walls Listed at the previous Roof brace inspection. On 6/15/2023 1. Have the engineer submitt a revision to the building department showing the locations of all bearing walls on the floor plan. What size post is to be used under the girder trusses at each bearing wall also include type fo anchors to be used to support and hold down the posts. 2. Ledger board fastening detail also needs to be submitted. THE ABOVE LISTED REVISION WILL NEED TO BE SUBMITTED PRIOR TO ALL ROUGH INSPECTION. | |||
| ALL ROUGH | 07/27/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 7/27/23 The revision sent in is not what needs to be changed. The floor plan page 2 of the drawing does not show wall details. PAGE 2 will need to be revised and submitted showing which walls are bearing and which walls are non bearing. THIS WILL NEED TO BE COMPLETED BEFORE INSULATION INSPECTION CAN BE PASSED. 7/21/2023 - PREVIOUS INSPECTION NOTES 7/21/23 Still missing revision for bearing walls Listed at the previous Roof brace inspection. On 6/15/2023 1. Have the engineer submitt a revision to the building department showing the locations of all bearing walls on the floor plan. What size post is to be used under the girder trusses at each bearing wall also include type fo anchors to be used to support and hold down the posts. 2. Ledger board fastening detail also needs to be submitted. THE ABOVE LISTED REVISION WILL NEED TO BE SUBMITTED PRIOR TO ALL ROUGH INSPECTION. | |||
| ALL ROUGH | 07/21/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 7/21/23 Still missing revision for bearing walls, stopped inspection Listed at the previous Roof brace inspection. On 6/15/2023 1. Have the engineer submitt a revision to the building department showing the locations of all bearing walls on the floor plan. What size post is to be used under the girder trusses at each bearing wall also include type fo anchors to be used to support and hold down the posts. 2. Ledger board fastening detail also needs to be submitted. THE ABOVE LISTED REVISION WILL NEED TO BE SUBMITTED PRIOR TO ALL ROUGH INSPECTION. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/18/2023 | APPROVED - AS NOTED | JWALKER |
| Note: Listed at the previous Roof brace inspection. On 6/15/2023 1. Have the engineer submitt a revision to the building department showing the locations of all bearing walls on the floor plan. What size post is to be used under the girder trusses at each bearing wall also include type fo anchors to be used to support and hold down the posts. 2. Ledger board fastening detail also needs to be submitted. THE ABOVE LISTED REVISION WILL NEED TO BE SUBMITTED PRIOR TO ALL ROUGH INSPECTION. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/13/2023 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 07/13/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/30/2023 | CANCELLED BY APPLICANT | AWS_IVR |
| Note: 6/15/2023 - PREVIOUS INSPECTION NOTES 6/15/23 6/15/23 1. Truss T08 missing hold down anchor at the 2x wall. Nail straps at cmu wall. 2. Truss T09 missing hold down achor and 2x wall. Please provide a detail for bearing wall / size of post and requied anchors for both areas of trusses T08 And T09 listed above. 3. Please provide anchoring system for the ledger board at truss T10 4. Trusses T 19, 20,21,and 22 are shown sitting on a bearing wall at mid point of the trusses. Refer to Engineering pages. The wall below is not constructed as a bearing wall. 5. All bearing walls are missing the SP anchors and the tops and bottoms of the studs. 6. Floor plan is not showing locations of bearing wall. Please provide a floor plan show bearing wall locations Inspection stopped. 6/9/2023 - PREVIOUS INSPECTION NOTES 6/9/23 Below listed items have not been corrected. Over framing anchors have not been installed correctly. Straps need to be fastened to trusses below. Not folded onto nailers. 6/9/2023 - PREVIOUS INSPECTION NOTES 6/9/23 Below listed items have not been corrected. Over framing anchors have not been installed correctly. Straps need to be fastened to trusses below. Not folded onto nailers. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23 1.Truss engineering packets onsite however no truss layout drawing onsite or included in the prints. Please provide a truss layout print for reinspection. 2. Garage bearing wall is missing the SP anchors at the top and bottom of the 16" o.c. studs. 3. All over framing is missing hold down anchors. Refer to structual drawings for locations. Walked roof at roof sheating inspection. Roof and wall sheating passed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/15/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/15/23 6/15/23 1. Truss T08 missing hold down anchor at the 2x wall. Nail straps at cmu wall. 2. Truss T09 missing hold down achor and 2x wall. Please provide a detail for bearing wall / size of post and requied anchors for both areas of trusses T08 And T09 listed above. 3. Please provide anchoring system for the ledger board at truss T10 4. Trusses T 19, 20,21,and 22 are shown sitting on a bearing wall at mid point of the trusses. Refer to Engineering pages. The wall below is not constructed as a bearing wall. 5. All bearing walls are missing the SP anchors and the tops and bottoms of the studs. 6. Floor plan is not showing locations of bearing wall. Please provide a floor plan show bearing wall locations Inspection stopped. 6/9/2023 - PREVIOUS INSPECTION NOTES 6/9/23 Below listed items have not been corrected. Over framing anchors have not been installed correctly. Straps need to be fastened to trusses below. Not folded onto nailers. 6/9/2023 - PREVIOUS INSPECTION NOTES 6/9/23 Below listed items have not been corrected. Over framing anchors have not been installed correctly. Straps need to be fastened to trusses below. Not folded onto nailers. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23 1.Truss engineering packets onsite however no truss layout drawing onsite or included in the prints. Please provide a truss layout print for reinspection. 2. Garage bearing wall is missing the SP anchors at the top and bottom of the 16" o.c. studs. 3. All over framing is missing hold down anchors. Refer to structual drawings for locations. Walked roof at roof sheating inspection. Roof and wall sheating passed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/9/23 Below listed items have not been corrected. Over framing anchors have not been installed correctly. Straps need to be fastened to trusses below. Not folded onto nailers. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23 1.Truss engineering packets onsite however no truss layout drawing onsite or included in the prints. Please provide a truss layout print for reinspection. 2. Garage bearing wall is missing the SP anchors at the top and bottom of the 16" o.c. studs. 3. All over framing is missing hold down anchors. Refer to structual drawings for locations. Walked roof at roof sheating inspection. Roof and wall sheating passed. | |||
| ROOF VALLEY & METAL | 06/07/2023 | APPROVED | JWALKER |
| Note: 6/5/2023 - PREVIOUS INSPECTION NOTES 4x4 L metal embedded in roofing cement needs to be installed at the front entry side walls. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2023 | Disapproved - NO FEE | JWALKER |
| Note: 6/6/23 1.Truss engineering packets onsite however not truss layout drawing onsite or included in the prints. Please provide a truss layout print for reinspection. 2. Garage bearing wall is missing the SP anchors at the top and bottom of the 16" o.c. studs. 3. All over framing is missing hold down anchors. Refer to structual drawings for locations. Walked roof at roof sheating inspection. Roof and wall sheating passed. | |||
| ROOF VALLEY & METAL | 06/05/2023 | Disapproved - NO FEE | JWALKER |
| Note: 4x4 L metal embedded in roofing cement needs to be installed at the front entry side walls. | |||
| ROOF SHEATHING | 05/26/2023 | APPROVED | JWALKER |
| WALL SHEATHING | 05/26/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 05/24/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/16/2023 | APPROVED | BTAYLOR |
| Note: 5/12/2023 - PREVIOUS INSPECTION NOTES Window sills have been installed. 1. ALL down rods at the front entry are to be corrected not just the 4 at the columns. 5/9/23 Below listed corrections have not been made. 5/5/2023 - PREVIOUS INSPECTION NOTES 1. Fornt entry where block work steps up. Pieces of #5 rebar have been dropped into the cells and tied to the dowels giving the appearance of full length continous down rods.. Down rods are to be continous from top off wall to down and over lapped min of 25" and secured in place. 2. Precast window sills have not been installed. | |||
| TIE BEAM / LINTEL | 05/12/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Window sills have been installed. 1. ALL down rods at the front entry are to be corrected not just the 4 at the columns. 5/9/23 Below listed corrections have not been made. 5/5/2023 - PREVIOUS INSPECTION NOTES 1. Fornt entry where block work steps up. Pieces of #5 rebar have been dropped into the cells and tied to the dowels giving the appearance of full length continous down rods.. Down rods are to be continous from top off wall to down and over lapped min of 25" and secured in place. 2. Precast window sills have not been installed. | |||
| TIE BEAM / LINTEL | 05/09/2023 | Disapproved - NO FEE | JWALKER |
| Note: 5/9/23 Below listed corrections have not been made. 5/5/2023 - PREVIOUS INSPECTION NOTES 1. Fornt entry where block work steps up. Pieces of #5 rebar have been dropped into the cells and tied to the dowels giving the appearance of full length continous down rods.. Down rods are to be continous from top off wall to down and over lapped min of 25" and secured in place. 2. Precast window sills have not been installed. | |||
| TIE BEAM / LINTEL | 05/05/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Fornt entry where block work steps up. Pieces of #5 rebar have been dropped into the cells and tied to the dowels giving the appearance of full length continous down rods.. Down rods are to be continous from top off wall to down and over lapped min of 25" and secured in place. 2. Precast window sills have not been installed. | |||
| MONOLITHIC SLAB | 04/27/2023 | APPROVED | JWALKER |
| Note: 4/26/2023 - PREVIOUS INSPECTION NOTES | |||
| MONOLITHIC SLAB | 04/26/2023 | CANCELLED BY APPLICANT | JWALKER |
| GRAVITY SEWER TEST | 04/20/2023 | APPROVED | MGIBSON |
| Note: 4/19/2023 - PREVIOUS INSPECTION NOTES Sewer line has been covered by soil wash out due to heavy rain. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/20/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 4/19/2023 - PREVIOUS INSPECTION NOTES Water supply pipe has been covered. Unable to verify pipe size, type. and install. STEEL HEAD PLUMBING INSTALLS SCHEDUAL 40 ASTM STANDARD PIPE FOR WATER MAIN AND ALWAYS BURY'S BEYOND REQUIRED DEPTH | |||
| GRAVITY SEWER TEST | 04/19/2023 | Disapproved - NO FEE | JWALKER |
| Note: Sewer line has been covered by soil wash out due to heavy rain. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/19/2023 | Disapproved - NO FEE | JWALKER |
| Note: Water supply pipe has been covered. Unable to verify pipe size, type. and install. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/18/2023 | CANCELLED BY APPLICANT | AWS_IVR |
| Note: 4/17/2023 - PREVIOUS INSPECTION NOTES NO TEST ON DWV HEAD TEST NOT HOLDING | |||
| GRAVITY SEWER TEST | 04/18/2023 | CANCELLED BY APPLICANT | AWS_IVR |
| Note: 4/17/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE | |||
| GRAVITY SEWER TEST | 04/17/2023 | Disapproved - NO FEE | MGIBSON |
| Note: SEE FIRST ROUGH NOTE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/17/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO TEST ON DWV HEAD TEST NOT HOLDING | |||
| WATER METER INSTALLATION REQUEST | 03/23/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 10/17/2023 | 10/17/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Termite certificate needed. | |||
| BLD | COMPLETE | 07/28/2023 | 08/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/05/2023 | 07/07/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Engineered plan needs to be site specific | |||
| ENGIN1 | COMPLETE | 05/24/2023 | 05/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/24/2023 | 05/24/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/21/2023 | 02/23/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/10/2023 | 02/15/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 02/10/2023 | 02/13/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarminside and outside of all bedrooms. FRC 2020 314, 315 | |||
| ENGIN1 | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/10/2023 | 02/21/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/10/2023 | 05/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/27/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/27/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/27/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/27/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/27/2023 |
| CONNECTION FEES | ¤1,166.26 | 03/03/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/03/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/03/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 03/03/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/03/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/03/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/03/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/03/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/03/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 03/03/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/03/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/03/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/03/2023 |
| SURCHARGE FS 533.721 | ¤3.56 | 03/03/2023 |
| SURCHARGE - FS 468.631 | ¤5.34 | 03/03/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/03/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/03/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/03/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/03/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/03/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 03/03/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 03/03/2023 |
| SEWER CREDIT | (¤1,342.00) | 03/03/2023 |
| SEWER INSPECTION | ¤25.00 | 03/03/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/03/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/03/2023 |
| SITE PLAN 30 | ¤30.00 | 03/03/2023 |
| WATER- TURN ON | ¤25.00 | 03/03/2023 |
| ADJUSTMENT 50% | (¤556.86) | 03/03/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/03/2023 |
| INSPECTION - RESIDENTIAL | ¤844.25 | 03/03/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤239.46 | 03/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,313.38 |