Permit #2023020532
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00110-0190 |
| CONDITIONED SPACE: 2295 sqft |
| GARAGE: 538 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 3263 sqft |
| Block: 00110 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 912-258-2201 |
| Location Address: 68 BEAUFORD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/03/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤215,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/06/2023 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 09/05/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 9/5/23- Island outlets, and outlet to right of range and gfi outlet farthest left of range all show Hot/grd reverse. please repair. Kitchen disposal is not functioning (frozen). | |||
| U -UTILITY RESIDENTIAL FINAL | 09/05/2023 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 09/01/2023 | FINAL APPROVED | EMADISON |
| Note: 8/11/23=I spoke with Jason from Ross grading and explain to him the CENTER OF THE SWALE is going to be 8 foot I'm 5 feet before the cable box is going to bring it to 7 feet. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ | |||
| ROW - FINAL APRON (AFTER POUR) | 09/01/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/01/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/01/2023 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 08/25/2023 | APPROVED | DHANEY |
| ROW- PROJECT STATUS | 08/11/2023 | APPROVED | GBERTOLA |
| Note: 8/11/23=I spoke with Jason from Ross grading and explain to him the CENTER OF THE SWALE is going to be 8 foot I'm 5 feet before the cable box is going to bring it to 7 feet. PER GBERTOLA +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ** 08/07/23 CULVERT PIPE ELEVATION IS GOOD AT THE TIME OF INSPECTION ** BUILDER NEEDS TO REMOVE SOME MATERIAL FROM AROUND CULVERT NEEDS TO BE BURIED 1/2 WAY UP BEFORE YOU POUR ** BUILDER NEED TO PUMP FOOTERS BEFORE POURING ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. _____________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES 8/3/2023 - PREVIOUS INSPECTION NOTES ** 08/03/23 SITE HAS TOO MUCH WATER NOT READY FOR AN INSPECTION ** BUILDER SHOULD OPEN UP SWALE AND ALLOW WATER TO DRAIN CAUSING WATER TO BACK UP _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES TO MUCH WATER IN THE POURING AREA. IT THE RESPONSIBILITY TO MAKE SURE SITE IS PREPPED FOR INSPECTION SEE PHOTOS OF TODAY INSPECTION RESULTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/07/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/07/23 CULVERT PIPE ELEVATION IS GOOD AT THE TIME OF INSPECTION ** BUILDER NEEDS TO REMOVE SOME MATERIAL FROM AROUND CULVERT NEEDS TO BE BURIED 1/2 WAY UP BEFORE YOU POUR ** BUILDER NEED TO PUMP FOOTERS BEFORE POURING ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. _____________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES 8/3/2023 - PREVIOUS INSPECTION NOTES ** 08/03/23 SITE HAS TOO MUCH WATER NOT READY FOR AN INSPECTION ** BUILDER SHOULD OPEN UP SWALE AND ALLOW WATER TO DRAIN CAUSING WATER TO BACK UP _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES TO MUCH WATER IN THE POURING AREA. IT THE RESPONSIBILITY TO MAKE SURE SITE IS PREPPED FOR INSPECTION SEE PHOTOS OF TODAY INSPECTION RESULTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/04/2023 | CANCELLED BY APPLICANT | EMADISON |
| Note: 8/3/2023 - PREVIOUS INSPECTION NOTES ** 08/03/23 SITE HAS TOO MUCH WATER NOT READY FOR AN INSPECTION ** BUILDER SHOULD OPEN UP SWALE AND ALLOW WATER TO DRAIN CAUSING WATER TO BACK UP _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES TO MUCH WATER IN THE POURING AREA. IT THE RESPONSIBILITY TO MAKE SURE SITE IS PREPPED FOR INSPECTION SEE PHOTOS OF TODAY INSPECTION RESULTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/03/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/03/23 SITE HAS TOO MUCH WATER NOT READY FOR AN INSPECTION ** BUILDER SHOULD OPEN UP SWALE AND ALLOW WATER TO DRAIN CAUSING WATER TO BACK UP _________________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES TO MUCH WATER IN THE POURING AREA. IT THE RESPONSIBILITY TO MAKE SURE SITE IS PREPPED FOR INSPECTION SEE PHOTOS OF TODAY INSPECTION RESULTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: TO MUCH WATER IN THE POURING AREA. IT THE RESPONSIBILITY TO MAKE SURE SITE IS PREPPED FOR INSPECTION SEE PHOTOS OF TODAY INSPECTION RESULTS. | |||
| ELECTRIC - EARLY POWER | 07/31/2023 | APPROVED | JSTEWART |
| Note: 7/31/23- Authorize release of email to FPL @ 1:47p | |||
| U - SEWER TIE IN | 07/31/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 06/30/2023 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 06/27/2023 | APPROVED | JSTEWART |
| ALL ROUGH | 06/26/2023 | APPROVED | JSTEWART |
| Note: 6/21/2023 - PREVIOUS INSPECTION NOTES 06/21/2023- Items from prior punchlist created by inspector not completed. Also, add shims to front door jambs, installation gap too large. 6/15/2023 - PREVIOUS INSPECTION NOTES 6/15/23--1. Please tape ends of service lines in meter Panel. 2. need protective framing at breaker panel for romex chase. 3. please seal dryer duct at roof penetration. 4. Nail plate master shower BP. 5. strap and secure all exhaust duct. 6. anchor at master bath window. 7. Nail plates at living rm window for romex running horizontal to vertical screw pattern. 8. Please install front door. 9. front bed rm window missing 2 anchors. 10. front bedroom Nail plates for romex running horizontal to vertical screw pattern. 11. Rear bedroom window missing 2 anchors. 12. rear bedroom nail plate at romex running horizontal to vertical screw pattern. | |||
| ALL ROUGH | 06/21/2023 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: 06/21/2023- Items from prior punchlist created by inspector not completed. Also, add shims to front door jambs, installation gap too large. 6/15/2023 - PREVIOUS INSPECTION NOTES 6/15/23--1. Please tape ends of service lines in meter Panel. 2. need protective framing at breaker panel for romex chase. 3. please seal dryer duct at roof penetration. 4. Nail plate master shower BP. 5. strap and secure all exhaust duct. 6. anchor at master bath window. 7. Nail plates at living rm window for romex running horizontal to vertical screw pattern. 8. Please install front door. 9. front bed rm window missing 2 anchors. 10. front bedroom Nail plates for romex running horizontal to vertical screw pattern. 11. Rear bedroom window missing 2 anchors. 12. rear bedroom nail plate at romex running horizontal to vertical screw pattern. | |||
| ALL ROUGH | 06/15/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 6/15/23--1. Please tape ends of service lines in meter Panel. 2. need protective framing at breaker panel for romex chase. 3. please seal dryer duct at roof penetration. 4. Nail plate master shower BP. 5. strap and secure all exhaust duct. 6. anchor at master bath window. 7. Nail plates at living rm window for romex running horizontal to vertical screw pattern. 8. Please install front door. 9. front bed rm window missing 2 anchors. 10. front bedroom Nail plates for romex running horizontal to vertical screw pattern. 11. Rear bedroom window missing 2 anchors. 12. rear bedroom nail plate at romex running horizontal to vertical screw pattern. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/14/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 6/14/2023---Not needed was approved twice before. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2023 | APPROVED | JSTEWART |
| ROOF VALLEY & METAL | 06/05/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING | 05/26/2023 | APPROVED | FWILLIS |
| Note: 5/25/2023 - PREVIOUS INSPECTION NOTES 5/25/2023--sheet center entry 1st row needs nailed. front right hip triangle sheet seam needs nailed. (marked on roof with sharpie) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/26/2023 | APPROVED | FWILLIS |
| Note: 5/23/2023 - PREVIOUS INSPECTION NOTES 5/23/2023-previous notes not rectified 5/18/2023 - PREVIOUS INSPECTION NOTES 5/18/2023--bearing wall bottom plate need anchors per plan 32" OC, bearing wall frame to CMU needs anchors per plan 48" OC. Missing truss straps on back wall. stopped inspection. 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/2023--Not Ready, 1. Load bearing wall needs to be strapped and anchored per plans, 2. Missing truss straps at bearing wall. 3. no tie down at girder 4. No truss straps at Lanai. stopped inspection. 5/26/23 - REAR WALL ABOVE SLIDING GLASS DOORS META STRAPS WERE MISSED. RETRO-FITTED WITH 10 TWIST STRAPS. NO NOTE ON PLANS ADDRESSING QUANTITY OF RETRO-FITTED STRAPS. | |||
| ROOF SHEATHING | 05/25/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 5/25/2023--sheet center entry 1st row needs nailed. front right hip triangle sheet seam needs nailed. (marked on roof with sharpie) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/23/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 5/23/2023-previous notes not rectified 5/18/2023 - PREVIOUS INSPECTION NOTES 5/18/2023--bearing wall bottom plate need anchors per plan 32" OC, bearing wall frame to CMU needs anchors per plan 48" OC. Missing truss straps on back wall. stopped inspection. 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/2023--Not Ready, 1. Load bearing wall needs to be strapped and anchored per plans, 2. Missing truss straps at bearing wall. 3. no tie down at girder 4. No truss straps at Lanai. stopped inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/18/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 5/18/2023--bearing wall bottom plate need anchors per plan 32" OC, bearing wall frame to CMU needs anchors per plan 48" OC. Missing truss straps on back wall. stopped inspection. 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/2023--Not Ready, 1. Load bearing wall needs to be strapped and anchored per plans, 2. Missing truss straps at bearing wall. 3. no tie down at girder 4. No truss straps at Lanai. stopped inspection. | |||
| WALL SHEATHING | 05/15/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/15/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 5/15/2023--Not Ready, 1. Load bearing wall needs to be strapped and anchored per plans, 2. Missing truss straps at bearing wall. 3. no tie down at girder 4. No truss straps at Lanai. stopped inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/12/2023 | APPROVED | TBAKER |
| ROW - DRAINAGE | 05/08/2023 | APPROVED | GBERTOLA |
| Note: 5/8/23=CORRECTION WERE MADE ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/3/2023 - PREVIOUS INSPECTION NOTES ** 05/03/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE TEMPORARY CULVERT IS PLUGGED NEED REMOVE ALL BUSTED UP PLYWOOD ** NEED SILT FENCING ALONG RIGHT SIDE PROPERTY LINE TO PREVENT ERODING MATERIAL FROM NEGATIVELY IMPACTING THE ADJACENT PROPERTY. ** NEED TO REMOVES TRUSSES FROM ROADSIDE SWALE AS THEY EXTEND TO VERTY EDGE OF ROAD CREATING A SAFETY HAZARD ** NEED TO REMOVE PORT-JOHN FROM ROAD SIDE SWALE AND PLAVE ON SITE ** BUILDER ALSO NEEDS TO INSTALL A FORM OF EROSION CONTROLL DEVICE IN FRONT OF CATCH BASISN TO PREVENT SEDIMENT FROM ENTERING AND POTENTIALLY CLOGGING. ** FOLLOW UP INSPECTION ON 05/08/23 | |||
| ROW - DRAINAGE | 05/03/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/03/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE TEMPORARY CULVERT IS PLUGGED NEED REMOVE ALL BUSTED UP PLYWOOD ** NEED SILT FENCING ALONG RIGHT SIDE PROPERTY LINE TO PREVENT ERODING MATERIAL FROM NEGATIVELY IMPACTING THE ADJACENT PROPERTY. ** NEED TO REMOVES TRUSSES FROM ROADSIDE SWALE AS THEY EXTEND TO VERTY EDGE OF ROAD CREATING A SAFETY HAZARD ** NEED TO REMOVE PORT-JOHN FROM ROAD SIDE SWALE AND PLAVE ON SITE ** BUILDER ALSO NEEDS TO INSTALL A FORM OF EROSION CONTROLL DEVICE IN FRONT OF CATCH BASISN TO PREVENT SEDIMENT FROM ENTERING AND POTENTIALLY CLOGGING ** FOLLOW UP INSPECTION ON 05/08/23 | |||
| TIE BEAM / LINTEL | 05/02/2023 | APPROVED | JSTEWART |
| Note: 4/27/2023 - PREVIOUS INSPECTION NOTES 4/27/2023--Multiple Locations (marked on walls) Footing dowels need to be relocated for 3/4" min embeddment, and overbend. OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION CLEARANCE FROM MASONRY R606.13.4 | |||
| TIE BEAM / LINTEL | 04/27/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 4/27/2023--Multiple Locations (marked on walls) Footing dowels need to be relocated for 3/4" min embeddment, and overbend. OVERBEND DOWEL BAR FBC R606.13.3 EXCEPTION CLEARANCE FROM MASONRY R606.13.4 | |||
| MONOLITHIC SLAB | 04/17/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 4/17/2023--3 column drop dowels are tied together, need to be seperated for proper placement within the block column. WILL CHECK AT TIE BEAM/LINTEL INSPECTION. 4/14/2023 - PREVIOUS INSPECTION NOTES 4/14/2023--Dowels at 3 columns are tied off in a way that Dowels wont be plumb and straight at pour. Please relocate and tie of properly. R404.1.3.3.7.4..SUPPORT AND COVER. Reinforcement shall be secured in the proper location in the forms...... 4/13/2023 - PREVIOUS INSPECTION NOTES 4/13/2023--Dowels at 3 column pads need to be placed properly and tied off. R404.1.3.3.7.4, (highlighted on plans) | |||
| MONOLITHIC SLAB | 04/14/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 4/14/2023--Dowels at 3 columns are tied off in a way that Dowels wont be plumb and straight at pour. Please relocate and tie of properly. R404.1.3.3.7.4..SUPPORT AND COVER. Reinforcement shall be secured in the proper location in the forms...... 4/13/2023 - PREVIOUS INSPECTION NOTES 4/13/2023--Dowels at 3 column pads need to be placed properly and tied off. R404.1.3.3.7.4, (highlighted on plans) | |||
| MONOLITHIC SLAB | 04/13/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 4/13/2023--Dowels at 3 column pads need to be placed properly and tied off. R404.1.3.3.7.4, (highlighted on plans) | |||
| MONOLITHIC SLAB | 04/12/2023 | CANCELLED BY APPLICANT | AWS_IVR |
| Note: 4/10/2023 - PREVIOUS INSPECTION NOTES | |||
| MONOLITHIC SLAB | 04/10/2023 | CANCELLED BY APPLICANT | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/05/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/05/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 03/17/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/11/2023 | 05/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/11/2023 | 05/11/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/21/2023 | 02/21/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/13/2023 | 05/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/10/2023 | 02/15/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/10/2023 | 02/14/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/10/2023 | 02/21/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/10/2023 | 02/13/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM color sheet: Could not find the color sea walls. Please check the name and provide the correct color. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/06/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/06/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/06/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/06/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/06/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/03/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/03/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 03/03/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 03/03/2023 |
| SEWER CREDIT | (¤1,147.00) | 03/03/2023 |
| SEWER INSPECTION | ¤25.00 | 03/03/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/03/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/03/2023 |
| SITE PLAN 30 | ¤30.00 | 03/03/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/03/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/03/2023 |
| WATER- TURN ON | ¤25.00 | 03/03/2023 |
| ADJUSTMENT 50% | (¤533.91) | 03/03/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/03/2023 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 03/03/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 03/03/2023 |
| CONNECTION FEES | ¤1,166.26 | 03/03/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/03/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/03/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 03/03/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/03/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/03/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/03/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/03/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/03/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 03/03/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/03/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/03/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/03/2023 |
| SURCHARGE FS 533.721 | ¤3.43 | 03/03/2023 |
| SURCHARGE - FS 468.631 | ¤5.15 | 03/03/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,605.12 |