I want to search for...
Permit #2023020533
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00560-0140 |
| CONDITIONED SPACE: 2475 sqft |
| GARAGE: 495 sqft |
| OPENED PORCH (WITH ROOF) : 265 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| Total Square Footage: 3275 sqft |
| Block: 00560 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 912-258-2201 |
| Location Address: 54 BUNKER HILL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/24/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤235,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/12/2023 | FINAL APPROVED | JSTEWART |
| U -UTILITY RESIDENTIAL FINAL | 10/12/2023 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/11/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/11/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 10/11/2023 | APPROVED | EMADISON |
| ROW - FINAL APRON (AFTER POUR) | 10/11/2023 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 10/06/2023 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 09/06/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 10 AM | |||
| ROW- PRE-APRON (PRE-POUR) | 08/22/2023 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATION BEFORE POUR CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH IN THE CONCRETE. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------------------- 8/21/2023 - PREVIOUS INSPECTION NOTES 08/21/23= CULVERT PIPE ELEVATION IS CORRECT. The water is flowing towards the driveway, but it should go towards the road. The current approach is not working. We need to focus on moving forward with a positive flow on the road, rather than going backward. The pitch at the miter end is incorrect. PICTURE ATTACHED | |||
| ROW- PRE-APRON (PRE-POUR) | 08/21/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 08/21/23= CULVERT PIPE ELEVATION IS CORRECT. The water is flowing towards the driveway, but it should go towards the road. The current approach is not working. We need to focus on moving forward with a positive flow on the road, rather than going backward. The pitch at the miter end is incorrect. PICTURE ATTACHED | |||
| U - SEWER TIE IN | 08/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 08/01/2023 | APPROVED | CBOWERMASTER |
| INSULATION | 07/26/2023 | APPROVED | JSTEWART |
| ALL ROUGH | 07/21/2023 | APPROVED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2460 7/17/23--Missing Engineering on T05, and T06, Please install. Will check at All Rough. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/17/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 7/17/23--Missing Engineering on T05, and T06, Please install. Will check at All Rough. | |||
| LATH/BRICK/ WATER BARRIER | 07/14/2023 | APPROVED | JSTEWART |
| WALL SHEATHING | 07/05/2023 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 06/27/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING | 06/20/2023 | APPROVED | JSTEWART |
| FOUND SURVEY APPROVED (OFFICE) | 06/09/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/05/2023 | APPROVED | JSTEWART |
| MONOLITHIC SLAB | 05/19/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 5/19/2023--Please relocate Job box or portable restroom, so address is visible from the road. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/16/2023 | APPROVED | JSTEWART |
| GRAVITY SEWER TEST | 05/16/2023 | APPROVED | JSTEWART |
| WATER METER INSTALLATION REQUEST | 04/14/2023 | APPROVED | CSTONE |
| WATER METER INSTALLATION REQUEST | 03/31/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/05/2023 | 07/06/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plan needs to be site specific. | |||
| ENGIN1 | COMPLETE | 06/08/2023 | 06/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/08/2023 | 06/08/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/17/2023 | 03/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/17/2023 | 03/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/17/2023 | 03/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/13/2023 | 05/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/10/2023 | 02/15/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Digital signature could not be verified. Provide a verifiable digital signature. | |||
| CUSVC | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 02/10/2023 | 02/13/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarm inside and outside of all bedrooms. FRC 2020 314, 315 2. Plans need to be digital signed and sealed. | |||
| ENGIN1 | COMPLETE | 02/10/2023 | 02/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/10/2023 | 02/14/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | HOLD | 02/10/2023 | 02/13/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 02/10/2023 | 02/21/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/10/2023 | 02/14/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/24/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/24/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 03/24/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 03/24/2023 |
| SEWER CREDIT | (¤2,375.89) | 03/24/2023 |
| SEWER INSPECTION | ¤25.00 | 03/24/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/24/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/24/2023 |
| SITE PLAN 30 | ¤30.00 | 03/24/2023 |
| WATER- TURN ON | ¤25.00 | 03/24/2023 |
| ADJUSTMENT 50% | (¤556.86) | 03/24/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/24/2023 |
| INSPECTION - RESIDENTIAL | ¤844.25 | 03/24/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤239.46 | 03/24/2023 |
| CONNECTION FEES | ¤1,166.26 | 03/24/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/24/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/24/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 03/24/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/24/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/24/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/24/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/24/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/24/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 03/24/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/24/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/24/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/24/2023 |
| SURCHARGE FS 533.721 | ¤3.56 | 03/24/2023 |
| SURCHARGE - FS 468.631 | ¤5.34 | 03/24/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/24/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/24/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/24/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,109.49 |