Permit #2023020934
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7020-00040-0350 |
| Block: 00040 |
| Subdivision: 2182 - SECTION 20-WYNNFIELD |
| Job Phone: 386-931-3123 |
| Location Address: 22 WEBWOOD PL |
| Type: DR - DRIVEWAY |
| Issue Date: 03/07/2023 |
| NOC: Unknown |
| Applicant name: JOAO P FERNANDES |
| Owner: MARCAL ADELINO M |
|
Address 22 WEBWOOD PLACE PALM COAST, FL 32164 |
| Lot: 0350 |
| Contracted Stated Job Value: ¤2,300.00 |
| Job Description: REMOVE AND REPLACE CONCRETE DRIVEWAY AND SIDEWALK. |
| Type: CN |
Contractor
TOP OF THE LINE CONCRETE, INC
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 353064 BUNNELL, FL 32110 |
386-446-3198 | 386-446-3198 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 06/26/2023 | FINAL APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 06/26/2023 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 06/26/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- PRE-APRON (PRE-POUR) | 03/08/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/20/2023 | 02/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 02/20/2023 | 02/22/2023 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/20/2023 | 02/21/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤15.00) | 03/07/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/07/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 03/07/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/07/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/07/2023 |
| SITE PLAN 15 | ¤15.00 | 03/07/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤300.00 |