I want to search for...
Permit #2023030089
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00320-0090 |
| CONDITIONED SPACE: 2000 sqft |
| GARAGE: 476 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2817 sqft |
| Block: 00320 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 912-258-2201 |
| Location Address: 27 RYDELL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/17/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: Single Family House |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/22/2023 | FINAL APPROVED | JWALKER |
| U -UTILITY RESIDENTIAL FINAL | 12/22/2023 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 12/21/2023 | APPROVED | TPOLACEK |
| Note: 12/21/23 PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/21/2023 | APPROVED | TPOLACEK |
| Note: 12/21/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 11/14/23 PIPE IS GOOD. PLEASE MAKE SURE ALL ASPHALT PIECES ARE REMOVED FROM THE POUR AREA BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/21/2023 | APPROVED | TPOLACEK |
| Note: 12/21/23 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 12/21/2023 | APPROVED | TPOLACEK |
| Note: 12/21/23 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 12/13/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 11/14/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/14/23 PIPE IS GOOD. PLEASE MAKE SURE ALL ASPHALT PIECES ARE REMOVED FROM THE POUR AREA BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 10/30/2023 | APPROVED | JWALKER |
| U - SEWER TIE IN | 10/18/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 10/06/2023 | APPROVED | CBOWERMASTER |
| INSULATION | 09/29/2023 | APPROVED | JWALKER |
| Note: 9/28/2023 - PREVIOUS INSPECTION NOTES 9-28-23 need the revisions approved and on site for inspection (none of the notes below could be checked). Inspector Notes from Inspection 2420 9/12/23 The plans for the knee wall have been submitted but have not been approved. The Revision for the change of the duct work listed below has not been submitted. The contractor may insulate all areas except for the knee wall area as this will need to be reispected. The insulation inspection cannot be passed until the above listed corrections have been completed. 8/11/2023 - PREVIOUS INSPECTION NOTES 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed. | |||
| INSULATION | 09/28/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 9-28-23 need the revisions approved and on site for inspection (none of the notes below could be checked). Inspector Notes from Inspection 2420 9/12/23 The plans for the knee wall have been submitted but have not been approved. The Revision for the change of the duct work listed below has not been submitted. The contractor may insulate all areas except for the knee wall area as this will need to be reispected. The insulation inspection cannot be passed until the above listed corrections have been completed. 8/11/2023 - PREVIOUS INSPECTION NOTES 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed. | |||
| ALL ROUGH | 09/12/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 9/12/23 The plans for the knee wall have been submitted but have not been approved. The Revision for the change of the duct work listed below has not been submitted. The contractor may insulate all areas except for the knee wall area as this will need to be reispected. The insulation inspection cannot be passed until the above listed corrections have been completed. 8/11/2023 - PREVIOUS INSPECTION NOTES 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed. | |||
| ALL ROUGH | 08/11/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed. | |||
| ALL ROUGH | 07/27/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed. | |||
| LATH/BRICK/ WATER BARRIER | 07/10/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/05/2023 | Disapproved - NO FEE | JWALKER |
| Note: Unable to locate a truss layout drawing in the prints or attached to the mitek truss engineering packet. This appears to be an on going failure with several of the builders homes. Please ensure the truss drawings are onsite for all future roof brace inspections to avoid fees and delays. INSPECTION STOPPED DUE TO MISSING TRUSS ENGINEERING DRAWINGS. | |||
| ROOF VALLEY & METAL | 06/16/2023 | APPROVED | JWALKER |
| ROOF SHEATHING | 06/12/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 06/12/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 06/05/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 05/30/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 5/30/23: Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). | |||
| MONOLITHIC SLAB | 05/18/2023 | APPROVED | JWALKER |
| GRAVITY SEWER TEST | 05/12/2023 | APPROVED | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: FIRST ROUGH PLUMBING APPRROVED . GRAVITY SEWER NEEDS TO BE SCHEDULED FOR 5/12/23 | |||
| WATER METER INSTALLATION REQUEST | 05/08/2023 | APPROVED | CSTONE |
| WATER METER INSTALLATION REQUEST | 04/25/2023 | APPROVED | CSTONE |
| Note: 4/3/2023 1:27:16 PM- PREVIOUS INSPECTION NOTES not cleared | |||
| WATER METER INSTALLATION REQUEST | 03/31/2023 | Disapproved - NO FEE | CSTONE |
| Note: not cleared |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/22/2023 | 09/26/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/22/2023 | 09/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/21/2023 | 09/21/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| BLD | COMPLETE | 09/01/2023 | 09/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/19/2023 | 07/19/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) Document type and file type must match. | |||
| BLD | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/02/2023 | 03/07/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/02/2023 | 03/06/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 03/02/2023 | 03/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/02/2023 | 03/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/02/2023 | 03/02/2023 |
| Note: not needed | |||
| LOCATE | COMPLETE | 03/02/2023 | 03/03/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 03/02/2023 | 03/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/02/2023 | 03/09/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/02/2023 | 03/03/2023 |
| Note: Released By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/02/2023 | 05/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/02/2023 | 03/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| CONNECTION FEES | ¤1,166.26 | 03/17/2023 |
| FIRE IMPACT FEE ADMIN | ¤54.36 | 03/17/2023 |
| FIRE IMPACT FEE ADMIN | (¤54.36) | 03/17/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/17/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/17/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 03/17/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/17/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/17/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/17/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/17/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/17/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 03/17/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/17/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/17/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/17/2023 |
| SURCHARGE FS 533.721 | ¤3.04 | 03/17/2023 |
| SURCHARGE - FS 468.631 | ¤4.56 | 03/17/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/17/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/17/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/17/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/17/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/17/2023 |
| SEWER CREDIT | (¤1,466.00) | 03/17/2023 |
| SEWER INSPECTION | ¤25.00 | 03/17/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/17/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/17/2023 |
| SITE PLAN 30 | ¤30.00 | 03/17/2023 |
| WATER- TURN ON | ¤25.00 | 03/17/2023 |
| ADJUSTMENT 50% | (¤465.08) | 03/17/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/17/2023 |
| INSPECTION - RESIDENTIAL | ¤701.25 | 03/17/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤198.90 | 03/17/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,048.80 |