Permit #2023030089

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00320-0090
CONDITIONED SPACE: 2000 sqft
GARAGE: 476 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
Total Square Footage: 2817 sqft
Block: 00320
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 912-258-2201
Location Address: 27 RYDELL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/17/2023
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 0090
Contracted Stated Job Value: ¤195,000.00
Job Description: Single Family House
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/22/2023 FINAL APPROVED JWALKER
U -UTILITY RESIDENTIAL FINAL 12/22/2023 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 12/21/2023 APPROVED TPOLACEK
Note: 12/21/23 PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/21/2023 APPROVED TPOLACEK
Note: 12/21/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 11/14/23 PIPE IS GOOD. PLEASE MAKE SURE ALL ASPHALT PIECES ARE REMOVED FROM THE POUR AREA BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/21/2023 APPROVED TPOLACEK
Note: 12/21/23 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 12/21/2023 APPROVED TPOLACEK
Note: 12/21/23 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 12/13/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW- PRE-APRON (PRE-POUR) 11/14/2023 APPROVED - AS NOTED FSLADISH
Note: 11/14/23 PIPE IS GOOD. PLEASE MAKE SURE ALL ASPHALT PIECES ARE REMOVED FROM THE POUR AREA BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ELECTRIC - EARLY POWER 10/30/2023 APPROVED JWALKER
U - SEWER TIE IN 10/18/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 10/06/2023 APPROVED CBOWERMASTER
INSULATION 09/29/2023 APPROVED JWALKER
Note: 9/28/2023 - PREVIOUS INSPECTION NOTES 9-28-23 need the revisions approved and on site for inspection (none of the notes below could be checked). Inspector Notes from Inspection 2420 9/12/23 The plans for the knee wall have been submitted but have not been approved. The Revision for the change of the duct work listed below has not been submitted. The contractor may insulate all areas except for the knee wall area as this will need to be reispected. The insulation inspection cannot be passed until the above listed corrections have been completed. 8/11/2023 - PREVIOUS INSPECTION NOTES 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed.
INSULATION 09/28/2023 Disapproved -FEE REQUIRED LMILLER
Note: 9-28-23 need the revisions approved and on site for inspection (none of the notes below could be checked). Inspector Notes from Inspection 2420 9/12/23 The plans for the knee wall have been submitted but have not been approved. The Revision for the change of the duct work listed below has not been submitted. The contractor may insulate all areas except for the knee wall area as this will need to be reispected. The insulation inspection cannot be passed until the above listed corrections have been completed. 8/11/2023 - PREVIOUS INSPECTION NOTES 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed.
ALL ROUGH 09/12/2023 APPROVED - AS NOTED JWALKER
Note: 9/12/23 The plans for the knee wall have been submitted but have not been approved. The Revision for the change of the duct work listed below has not been submitted. The contractor may insulate all areas except for the knee wall area as this will need to be reispected. The insulation inspection cannot be passed until the above listed corrections have been completed. 8/11/2023 - PREVIOUS INSPECTION NOTES 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed.
ALL ROUGH 08/11/2023 Disapproved -FEE REQUIRED JWALKER
Note: 8/11/23 1. The knee wall detail submitted to the building department has been rejected. 2. The front den area shown on the duct layout has been constructed as a bed room with a closet. There will need to a return for the HVAC installed. An engineering revision must be submitted to the building department showing this layout change. 3. Install a nail plate to chord of the wall at the right side bathroom plumbing vent. 4. 5' head test is not holding water. 5. The bath room fans need to have a proper 3" to 4" duct connector installed. 6. The return plenum constructed of duct board need to have the corners sealed. Insulation cannot be exposed. 7/27/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed.
ALL ROUGH 07/27/2023 Disapproved -FEE REQUIRED JWALKER
Note: Inspector Notes from Inspection 2320 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed.
LATH/BRICK/ WATER BARRIER 07/10/2023 APPROVED - AS NOTED MKRASKI
Note: 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/07/2023 APPROVED - AS NOTED JWALKER
Note: 1. Truss T09, the uplift at the bearing wall shown on the engineering page area 10 shows an uplift of 1728. The 2 SDWC screws at the bearing wall do not meet that requirement. The support column below the truss and required anchors for the support column are not detailed on the drawings. 2. Trusses T21,22,23,24,25,26 and 27. Are shown bearing on block. Appears the block wall was not continued to the needed height. The contractor has built a 2x6 kneewall. This is not detailed in the drawings. 3. The Bearing wall detail on page 6/6 shows SP anchors are to be used at each stud top and bottom. The letter submitted to the building department does not give specific for the use of the SDWC screws. Only one screw has been used top and bottom at every other stud. For the 3 listed items above. Please have the engineer submitt revisions to the building department showing specific anchorage requirements for the bearing wall, The knee wall. and the girder truss T09 along with the support column, The contractor will need to have these detailed revisions submitted and approved before the all rough inspection can be passed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/05/2023 Disapproved - NO FEE JWALKER
Note: Unable to locate a truss layout drawing in the prints or attached to the mitek truss engineering packet. This appears to be an on going failure with several of the builders homes. Please ensure the truss drawings are onsite for all future roof brace inspections to avoid fees and delays. INSPECTION STOPPED DUE TO MISSING TRUSS ENGINEERING DRAWINGS.
ROOF VALLEY & METAL 06/16/2023 APPROVED JWALKER
ROOF SHEATHING 06/12/2023 APPROVED BTAYLOR
WALL SHEATHING 06/12/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 06/05/2023 APPROVED TBAKER
TIE BEAM / LINTEL 05/30/2023 APPROVED - AS NOTED RSIMS
Note: 5/30/23: Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum, contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable).
MONOLITHIC SLAB 05/18/2023 APPROVED JWALKER
GRAVITY SEWER TEST 05/12/2023 APPROVED MGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 05/11/2023 APPROVED - AS NOTED MGIBSON
Note: FIRST ROUGH PLUMBING APPRROVED . GRAVITY SEWER NEEDS TO BE SCHEDULED FOR 5/12/23
WATER METER INSTALLATION REQUEST 05/08/2023 APPROVED CSTONE
WATER METER INSTALLATION REQUEST 04/25/2023 APPROVED CSTONE
Note: 4/3/2023 1:27:16 PM- PREVIOUS INSPECTION NOTES not cleared
WATER METER INSTALLATION REQUEST 03/31/2023 Disapproved - NO FEE CSTONE
Note: not cleared

Review History

Department Status Date In Date Out
BLD COMPLETE 09/22/2023 09/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 09/22/2023 09/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 09/21/2023 09/21/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
BLD COMPLETE 09/01/2023 09/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/19/2023 07/19/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) Document type and file type must match.
BLD COMPLETE 07/13/2023 07/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/05/2023 06/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/05/2023 06/05/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/02/2023 03/07/2023
Note: Released By: JPI
CUSVC COMPLETE 03/02/2023 03/06/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 03/02/2023 03/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/02/2023 03/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/02/2023 03/02/2023
Note: not needed
LOCATE COMPLETE 03/02/2023 03/03/2023
Note: Released By: TONI CHURCHILL - -
MECH COMPLETE 03/02/2023 03/02/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/02/2023 03/09/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 03/02/2023 03/03/2023
Note: Released By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM
SWALE COMPLETE 03/02/2023 05/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 03/02/2023 03/07/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/05/2024
REINSPECTION RESIDENTIAL ¤40.00 01/05/2024
REINSPECTION RESIDENTIAL ¤40.00 01/05/2024
REINSPECTION RESIDENTIAL ¤40.00 01/05/2024
CONNECTION FEES ¤1,166.26 03/17/2023
FIRE IMPACT FEE ADMIN ¤54.36 03/17/2023
FIRE IMPACT FEE ADMIN (¤54.36) 03/17/2023
FIRE IMPACT FEE ADMIN ¤12.62 03/17/2023
FIRE IMPACT FEE ADMIN (¤12.62) 03/17/2023
FC IMPACT FEE EMS ¤62.00 03/17/2023
IMPACT FEE FIRE ¤420.52 03/17/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/17/2023
FC IMPACT FEE LIBRARY ¤268.00 03/17/2023
IMPACT FEE PARKS ¤1,769.15 03/17/2023
IMPACT FEE SCHOOL ¤5,450.00 03/17/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 03/17/2023
WATER -IRRIGATION INSPECTION ¤25.00 03/17/2023
PARKS IMPACT FEE ADMIN ¤53.07 03/17/2023
PARKS IMPACT FEE ADMIN (¤53.07) 03/17/2023
SURCHARGE FS 533.721 ¤3.04 03/17/2023
SURCHARGE - FS 468.631 ¤4.56 03/17/2023
SW ENG - FOUNDATION SURVEY ¤20.00 03/17/2023
SW ENG INSPECTION 80 ¤80.00 03/17/2023
SW ENG PRE APRON ¤30.00 03/17/2023
SW ENG - REVIEW 20 ¤20.00 03/17/2023
SW ENG RES REVIEW 200 ¤200.00 03/17/2023
SEWER CREDIT (¤1,466.00) 03/17/2023
SEWER INSPECTION ¤25.00 03/17/2023
SEWER CAPITAL FACILITY ¤5,344.82 03/17/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 03/17/2023
SITE PLAN 30 ¤30.00 03/17/2023
WATER- TURN ON ¤25.00 03/17/2023
ADJUSTMENT 50% (¤465.08) 03/17/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/17/2023
INSPECTION - RESIDENTIAL ¤701.25 03/17/2023
PLAN REVIEW - RESIDENTIAL ¤198.90 03/17/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,048.80