I want to search for...

Permit #2023030552

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00120-0980
CONDITIONED SPACE: 2044 sqft
GARAGE: 748 sqft
OPENED PORCH (WITH ROOF) : 415 sqft
PATIO/DECK (NO ROOF) : 140 sqft
Total Square Footage: 3347 sqft
Block: 00120
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 229-375-9123
Location Address: 1 CURRY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/17/2023
NOC: RECORDED
Applicant name: WILLIAM ROBERT BARRICK
Owner: FAIGAL EYMARD & BEBINA H&W

Address

APT 204

PALM COAST, FL 32137

Address

121 PINE LAKES PKWY NORTH

PALM COAST, FL 32137

Lot: 0980
Contracted Stated Job Value: ¤279,683.00
Job Description: Single Family Residence
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
CANCEL

21 CEDARWOOD CT

PALM COAST, FL 32137

RB29003845 (Exp: 08/31/2025) 386-585-4097

Sub Contractors

WILLIAM ROBERT BARRICK
Status Location Address Mailing Address State License Number Phone
CANCEL

50 LEANNI WAY

PALM COAST, FL 32137

STE E2

PALM COAST, FL 32137

RC29027799 (Exp: 08/31/2025) 229-375-9123
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/09/2024 FINAL APPROVED LMILLER
Note: notes below resolved 5/7/2024 - PREVIOUS INSPECTION NOTES 1. Pex piping sticking out of the yard? on left side of garage near ODU. 2. T-stat wiring needs to be sealed where it goes through garage ceiling. 3. AHU filter door not sealing properly 4. Conduit under meter main must be secured per NEC 352.30a 5. Single 30a pole breaker in electrical panel (garage) is not identified per NEC 110.21 6. Single car garage is not operating properly to check door sensors 7. Garage door bucks not anchored per plans, marked plans Stopped inspection did not go inside besides garage, e-cals good.
ROW - STORMWATER FINAL 05/08/2024 APPROVED EMADISON
Note: *** NOTES ADDED BY EMADISON 5/8/2024 10:41:41 AM *** ** 05/08/24 ALL CORRECTIONS MADE ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. ____________________________________________________________________________________________________________________ 5/7/2024 - PREVIOUS INSPECTION NOTES 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/6/2024 9:31:49 AM *** ** 05/06/24 REQUIRED CORRECTIONS THAT ARE STILL NEEDED AS NOTED IN THE FIELD SURVEY ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL CURRENTLY MEASURES 39 INCHES DUE TO SEDIMENT THAT WASHED INTO THE CANAL DURING CONSTRUCTION Inspector Notes from Inspection 9465 ** 04/19/24 BEFORE ROW FINAL STORMWATER IS APPROVED: ** BUILDER WILL NEED TO MOVE BOTH POP-UP DRAINS IN REAR INSPECTOR IS RECOMMENDING YOU MOVE STRAIGHT OUT FROM STRUCTURE SO THEY FILTER THROUGH THE YARD THEY NEED TO BE INSTALLED SO THEY SIT ON TOP OF THE SOD NOT UNDERNEATH WHICH IS CAUSING WASHOUTS ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL ** NEED TO SOD NEARD REAR STEPS AND REMOVE THE SHRUBS FROM IN FRONT OF STEPS AS IT IS A SAFETY HAZARD BLOCKING A MEANS OF EGRESS IN FRONT OF BOTH SETS OF STEPS ** RIGHT SIDE FRONT SWAL ON RIGHT SIDE REMOVE LARGE HUMP AT PROPERTY LINE
ROW - STORMWATER FINAL 05/07/2024 CANCELLED BY APPLICANT EMADISON
Note: 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/6/2024 9:31:49 AM *** ** 05/06/24 REQUIRED CORRECTIONS THAT ARE STILL NEEDED AS NOTED IN THE FIELD SURVEY ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL CURRENTLY MEASURES 39 INCHES DUE TO SEDIMENT THAT WASHED INTO THE CANAL DURING CONSTRUCTION Inspector Notes from Inspection 9465 ** 04/19/24 BEFORE ROW FINAL STORMWATER IS APPROVED: ** BUILDER WILL NEED TO MOVE BOTH POP-UP DRAINS IN REAR INSPECTOR IS RECOMMENDING YOU MOVE STRAIGHT OUT FROM STRUCTURE SO THEY FILTER THROUGH THE YARD THEY NEED TO BE INSTALLED SO THEY SIT ON TOP OF THE SOD NOT UNDERNEATH WHICH IS CAUSING WASHOUTS ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL ** NEED TO SOD NEARD REAR STEPS AND REMOVE THE SHRUBS FROM IN FRONT OF STEPS AS IT IS A SAFETY HAZARD BLOCKING A MEANS OF EGRESS IN FRONT OF BOTH SETS OF STEPS ** RIGHT SIDE FRONT SWAL ON RIGHT SIDE REMOVE LARGE HUMP AT PROPERTY LINE
BLD - BUILDING FINAL 05/07/2024 Disapproved - NO FEE MKRASKI
Note: 1. Pex piping sticking out of the yard? on left side of garage near ODU. 2. T-stat wiring needs to be sealed where it goes through garage ceiling. 3. AHU filter door not sealing properly 4. Conduit under meter main must be secured per NEC 352.30a 5. Single 30a pole breaker in electrical panel (garage) is not identified per NEC 110.21 6. Single car garage is not operating properly to check door sensors 7. Garage door bucks not anchored per plans, marked plans Stopped inspection did not go inside besides garage, e-cals good.
ROW - FINAL APRON (AFTER POUR) 05/06/2024 APPROVED EMADISON
Note: *** NOTES ADDED BY EMADISON 5/6/2024 9:33:39 AM *** ** 05/06/24 ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. Inspector Notes from Inspection 9465 ** 04/19/24 BEFORE ROW FINAL STORMWATER IS APPROVED: ** BUILDER WILL NEED TO MOVE BOTH POP-UP DRAINS IN REAR INSPECTOR IS RECOMMENDING YOU MOVE STRAIGHT OUT FROM STRUCTURE SO THEY FILTER THROUGH THE YARD THEY NEED TO BE INSTALLED SO THEY SIT ON TOP OF THE SOD NOT UNDERNEATH WHICH IS CAUSING WASHOUTS ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL ** NEED TO SOD NEARD REAR STEPS AND REMOVE THE SHRUBS FROM IN FRONT OF STEPS AS IT IS A SAFETY HAZARD BLOCKING A MEANS OF EGRESS IN FRONT OF BOTH SETS OF STEPS ** RIGHT SIDE FRONT SWAL ON RIGHT SIDE REMOVE LARGE HUMP AT PROPERTY LINE
ROW - STORMWATER FINAL 05/06/2024 Disapproved -FEE REQUIRED EMADISON
Note: *** NOTES ADDED BY EMADISON 5/6/2024 9:31:49 AM *** ** 05/06/24 REQUIRED CORRECTIONS THAT ARE STILL NEEDED AS NOTED IN THE FIELD SURVEY ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL CURRENTLY MEASURES 39 INCHES DUE TO SEDIMENT THAT WASHED INTO THE CANAL DURING CONSTRUCTION Inspector Notes from Inspection 9465 ** 04/19/24 BEFORE ROW FINAL STORMWATER IS APPROVED: ** BUILDER WILL NEED TO MOVE BOTH POP-UP DRAINS IN REAR INSPECTOR IS RECOMMENDING YOU MOVE STRAIGHT OUT FROM STRUCTURE SO THEY FILTER THROUGH THE YARD THEY NEED TO BE INSTALLED SO THEY SIT ON TOP OF THE SOD NOT UNDERNEATH WHICH IS CAUSING WASHOUTS ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL ** NEED TO SOD NEARD REAR STEPS AND REMOVE THE SHRUBS FROM IN FRONT OF STEPS AS IT IS A SAFETY HAZARD BLOCKING A MEANS OF EGRESS IN FRONT OF BOTH SETS OF STEPS ** RIGHT SIDE FRONT SWAL ON RIGHT SIDE REMOVE LARGE HUMP AT PROPERTY LINE
U -UTILITY RESIDENTIAL FINAL 05/06/2024 FINAL APPROVED LFITZGERALD
ELEVATION CERTIFICATE-FINAL APPROVAL 05/03/2024 APPROVED JMYERS
U-CROSS CONNECTION 04/22/2024 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/19/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 04/19/2024 APPROVED - AS NOTED EMADISON
Note: ** 04/19/24 BEFORE ROW FINAL STORMWATER IS APPROVED: ** BUILDER WILL NEED TO MOVE BOTH POP-UP DRAINS IN REAR INSPECTOR IS RECOMMENDING YOU MOVE STRAIGHT OUT FROM STRUCTURE SO THEY FILTER THROUGH THE YARD THEY NEED TO BE INSTALLED SO THEY SIT ON TOP OF THE SOD NOT UNDERNEATH WHICH IS CAUSING WASHOUTS ** YOU NEED TO REMOVE SEDIMENT FROM THE CANAL BOTTOM AT TWO (2) LOCATIONS ON THE LEFT SIDE 1ST INFRONT OF THE STEPS THAT COME OF THE SCREEN ENCLOSURE 2ND BETWEEN LEFT CORNER OF SEAWALL AND LOCATION STATED ABOVE WILL NEED TO REMOVE THE SEDIMENT ***DO NOT*** PUSH IT INTO CANAL THERE NEEDS TO BE 48 INCHES FROM THE CANAL BOTTOM TO THE TOP OF THE SEAWALL ** NEED TO SOD NEARD REAR STEPS AND REMOVE THE SHRUBS FROM IN FRONT OF STEPS AS IT IS A SAFETY HAZARD BLOCKING A MEANS OF EGRESS IN FRONT OF BOTH SETS OF STEPS ** RIGHT SIDE FRONT SWAL ON RIGHT SIDE REMOVE LARGE HUMP AT PROPERTY LINE
ROW- PRE-APRON (PRE-POUR) 03/12/2024 APPROVED - AS NOTED FSLADISH
Note: 3/12/24 YOU ARE NOW READY TO LAY PAVERS AS OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 3/7/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THIS TIME. ****DO NOT LAY ANY PAVERS**** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- PAVER RESTRAINTS 03/07/2024 APPROVED - AS NOTED FSLADISH
Note: 3/7/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THIS TIME. ****DO NOT LAY ANY PAVERS**** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- PRE-APRON (PRE-POUR) 03/07/2024 PARTIALLY APPROVED FSLADISH
Note: 3/7/24 PIPE IS GOOD (FLAT). PIPE IS NOW 5 FT FROM ROAD EDGE AS REQUIRED. YOU ARE APPROVED TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AS OF THIS INSPECTION. **** DO NOT LAY ANY PAVERS UNTIL YOU HAVE COMPLETED A SPREAD AND COMPACTION SECONDARY PREPOUR INSPECTION..**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 3/6/2024 - PREVIOUS INSPECTION NOTES 3/6/24 SPOKE WITH CM. DETERMINED PIPE ELEVATION IS OFF. CANCELLING PER APPLICANT AS A COURTESY. __________________________________________________________________________________________________________________________ 2/28/2024 - PREVIOUS INSPECTION NOTES 2/28/24= CULVERT PIPE IS OUT OF TOLERANCE, NEED TO INSTALL A ELBOW 22.5 MITER END ON THE LEFT SIDE NEED TO BE A 5FT FROM THE ROAD EDGE . /8/24. Imeet the builder to install a culvert pipe at 7,48 or 7,50 invert.NEED TO PAY SPECIAL ATTENTION TO THE APRON DO NOT GO OVER THE 8% SLOPE per gbertola
ROW- PRE-APRON (PRE-POUR) 03/06/2024 CANCELLED BY APPLICANT FSLADISH
Note: 3/6/24 SPOKE WITH CM. DETERMINED PIPE ELEVATION IS OFF. CANCELLING PER APPLICANT AS A COURTESY. __________________________________________________________________________________________________________________________ 2/28/2024 - PREVIOUS INSPECTION NOTES 2/28/24= CULVERT PIPE IS OUT OF TOLERANCE, NEED TO INSTALL A ELBOW 22.5 MITER END ON THE LEFT SIDE NEED TO BE A 5FT FROM THE ROAD EDGE . /8/24. Imeet the builder to install a culvert pipe at 7,48 or 7,50 invert.NEED TO PAY SPECIAL ATTENTION TO THE APRON DO NOT GO OVER THE 8% SLOPE per gbertola
ROW- PRE-APRON (PRE-POUR) 02/28/2024 Disapproved -FEE REQUIRED GBERTOLA
Note: 2/28/24= CULVERT PIPE IS OUT OF TOLERANCE, NEED TO INSTALL A ELBOW 22.5 MITER END ON THE LEFT SIDE NEED TO BE A 5FT FROM THE ROAD EDGE . /8/24. Imeet the builder to install a culvert pipe at 7,48 or 7,50 invert.NEED TO PAY SPECIAL ATTENTION TO THE APRON DO NOT GO OVER THE 8% SLOPE per gbertola
ROW- PROJECT STATUS 02/08/2024 APPROVED GBERTOLA
Note: MEETING WITH THE BUILDER
ELECTRIC - EARLY POWER 01/08/2024 APPROVED AGAETANO
GRAVITY SEWER TEST 12/12/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 12/12/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRT5UAL INSPECTION
LATH/BRICK/ WATER BARRIER 11/15/2023 APPROVED AGAETANO
INSULATION 11/08/2023 APPROVED AGAETANO
Note: 11/6/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 10-26-2023 Dryer vent and kitchen vent not sealed at roof deck properly. Needs mastic. Check at next inspection. 11-06-2023 Insulation not installed.
INSULATION 11/06/2023 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2420 10-26-2023 Dryer vent and kitche vent not sealed at roof deck properly. Needs mastic. Check at next inspection. 11-06-2023 Insulation not installed.
ALL ROUGH 10/26/2023 APPROVED - AS NOTED AGAETANO
Note: 10-26-2023 Dryer vent and kitche vent not sealed at roof deck properly. Needs mastic. Check at next inspection.
ROOF VALLEY & METAL 10/24/2023 APPROVED AGAETANO
WALL SHEATHING 10/19/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/19/2023 APPROVED AGAETANO
ELEV CERT-FOUNDATION APPROVAL 10/18/2023 APPROVED - AS NOTED JMYERS
Note: The Foundation elevation certificate has been approved. However, at Final A9c, d, and e need to be 0 not N/A per new instructions.
FOUND SURVEY APPROVED (OFFICE) 10/05/2023 APPROVED TBAKER
TIE BEAM / LINTEL 09/14/2023 APPROVED AGAETANO
Note: 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. Down cell covered with soil. Highlighted and noted. 2. Dowel not proper distance. Highlighted and noted.R606.13.4 CLEARANCE FROM MASONRY. 3. Front column down cells not exposed for inspection.
TIE BEAM / LINTEL 09/13/2023 Disapproved - NO FEE AGAETANO
Note: 09-13-2023 1. Down cell covered with soil. Highlighted and noted. 2. Dowel not proper distance. Highlighted and noted.R606.13.4 CLEARANCE FROM MASONRY. 3. Front column down cells not exposed for inspection.
ELECTRIC - EARLY POWER 09/08/2023 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 08/28/2023 APPROVED FWILLIS
Note: 8/25/2023 - PREVIOUS INSPECTION NOTES 08-25-2023 1. AC chase line cannot be installed as is. P2603.4. 2. UFER ground not visible.
MONOLITHIC SLAB 08/25/2023 Disapproved - NO FEE AGAETANO
Note: 08-25-2023 1. AC chase line cannot be installed as is. P2603.4. 2. UFER ground not visible.
MONOLITHIC SLAB 08/24/2023 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 08/18/2023 APPROVED MGIBSON
STEM WALL FOUNDATION 08/01/2023 APPROVED AGAETANO
Note: 7/31/2023 - PREVIOUS INSPECTION NOTES 07-31-2023 Down cells and down rods not visible in all areas. Soil and water is covering multiple cells.
STEM WALL FOUNDATION 07/31/2023 Disapproved - NO FEE AGAETANO
Note: 07-31-2023 Down cells and down rods not visible in all areas. Soil and water is covering multiple cells.
FOOTER 07/12/2023 APPROVED AGAETANO
WATER METER INSTALLATION REQUEST 05/19/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
PLFM COMPLETE 05/01/2024 05/03/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 04/23/2024 04/30/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Comments not addressed: A8 a-f need to be N/A per FEMA instructions. A9b needs to be No not N/A. C2e should not be accessory equipment that does not service the building, it should be an A/C or generator not pool equipment; please revise.
PLFM HOLD 04/19/2024 04/21/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A8 a-f need to be N/A per FEMA instructions. A9b needs to be No not N/A. B9 needs to be listed to the tenth. C2e should not be accessory equipment that does not service the building, it should be an A/C or generator not pool equipment; please revise.
MECH COMPLETE 04/01/2024 04/03/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 12/04/2023 12/04/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 11/30/2023 11/30/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement for recording
ENGIN1 COMPLETE 11/28/2023 11/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/28/2023 11/30/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 11/28/2023 11/28/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide an electronic copy of a right of way agreement for paver driveway signed by the authorized signer of JMR III LLC once approved we will ask for the original for recording
BADMIN INFORMATION 10/20/2023 10/20/2023
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please seperate your paperwork. paver detail and the Right of way should be down loaded as such.
PLFM COMPLETE 10/16/2023 10/18/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. However, at Final A9c, d, and e need to be 0 not N/A per new instructions.
ELEC COMPLETE 10/16/2023 10/16/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 10/16/2023 10/16/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 10/05/2023 10/12/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A new elevation certificate has been released by FEMA, please revise elevation certificate to be on the new form. B9 needs to be listed to the tenth, 7.0'. There is still a discrepancy between the elevation noted in C2e and the comments in Section D. One says 10.1 the other says 10.00, which is correct?
ENGIN1 COMPLETE 10/04/2023 10/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/04/2023 10/04/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN COMPLETE 09/13/2023 09/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/25/2023 07/28/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 07/14/2023 07/21/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. ok 2. ok Partial Repeat Comment: 3. Provide stair section from landing adjacent to new open patio to ground / landing below. Show rise and run, show location of handrails, show handrail type (1 or 2),Show attachment and termination details. R311.7.5.1, R311.7.7 R311.7.8. R311.7.8.1. R311.7.8.2, R311.7.8.3, R311.7.5.2, R312.1.2 Repeat Comment: 4. Provide tread depth of 11 inches minimum or provide stair tread nosing detail. R311.7.5.3. Partial Repeat Comment: 5. Provide guard details for landing and stairs including materials, attachement / fastening details, . R312.1 through R312.1.3.
BLD HOLD 06/02/2023 06/09/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM 1. Provide dimensions of landings at top and bottom of stairs. R311.7.6. 2. Show width of stairs. R311.7.1 3. Provide stair section from landing adjacent to new open patio to ground / landing below. Show distance of landing and / or stairs above surrounding grade. Show rise and run, show location of handrails, show handrail type (1 or 2), show handrail mounting height, attachment and termination details. R311.7.5.1, R311.7.7 R311.7.8. R311.7.8.1. R311.7.8.2, R311.7.8.3, R311.7.5.2, R312.1.2 4. Provide tread depth of 11 inches minimum or provide stair tread nosing detail. R311.7.5.3. 5. Provide guard details for landing and stairs including guard height, opening limitations, materials, attachement / fastening details, design loads etc. R312.1 through R312.1.3.
PLFM COMPLETE 04/08/2023 04/12/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. However, at foundation, B9 needs to be 7.0' and there is a discrepancy between the elevation noted in C2e and the comments in Section D for the elevation of C2e. These will need to be fixed on the Foundation elevation certificate for it to be approved.
PLFM HOLD 04/03/2023 04/03/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Comment not addressed: A4 needs to have a use stated, it is still being left blank. In Section D there appears to be text from a digital seal, if this document is meant to be digitally sealed it cannot be printed and then scanned and uploaded, that voids the seal. There are also pages now missing from the upload, please upload all 6 pages of the elevation certificate.
PLFM HOLD 03/30/2023 03/31/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Comment not addressed: A4 needs to have a use stated.
ZON COMPLETE 03/22/2023 03/22/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM HOLD 03/22/2023 03/23/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM A4 needs to have a use stated. The elevations in C2 do not match what is shown on the Site Plan. For example: the proposed FFE on the site plan is 10.5 while the EC has it at 10.3, the LAG on the EC is 6.0 but on the site plan there is a 5.5, the HAG on the EC is 9.7 but on the site plan it is 10.0. Please correct either EC or site plan to match each other.
ENGIN1 COMPLETE 03/22/2023 03/22/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 03/22/2023 03/29/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
PLFM HOLD 03/14/2023 03/14/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please provide Construction elevation certificate as house is located inside the SFHA.
BADMIN COMPLETE 03/12/2023 03/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/10/2023 03/13/2023
Note: Released By: JPI
CUSVC COMPLETE 03/10/2023 03/15/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 03/10/2023 03/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/10/2023 03/10/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/10/2023 03/13/2023
LOCATE COMPLETE 03/10/2023 03/14/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/10/2023 03/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/10/2023 03/16/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 03/10/2023 03/14/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM All Rear windows and doors must have banding this house backs to a canal
SWALE COMPLETE 03/10/2023 03/29/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 05/08/2024
RECORDING FEE REIMBURSE DOC ¤44.00 05/08/2024
SW ENG REINSPECTION 20 ¤20.00 05/08/2024
SW ENG REINSPECTION 20 ¤20.00 05/08/2024
SW ENG REINSPECTION 30 ¤30.00 05/08/2024
PLAN REVIEW - REVISION ¤32.50 05/08/2024
PLAN REVIEW - REVISION ¤32.50 05/08/2024
CONNECTION FEES ¤1,166.26 04/17/2023
WATER-METER ¤505.39 04/17/2023
WATER- TURN ON ¤25.00 04/17/2023
WATER- TURN ON ¤25.00 04/17/2023
ADJUSTMENT 50% (¤510.97) 04/17/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/17/2023
INSPECTION - RESIDENTIAL ¤772.75 04/17/2023
PLAN REVIEW - RESIDENTIAL ¤219.18 04/17/2023
SW ENG - REVIEW 20 ¤20.00 04/17/2023
SW ENG RES REVIEW 200 ¤200.00 04/17/2023
TRANS IMPACT FEE ADMIN ¤54.36 04/17/2023
TRANS IMPACT FEE ADMIN (¤54.36) 04/17/2023
SEWER CREDIT (¤1,147.00) 04/17/2023
SEWER INSPECTION ¤25.00 04/17/2023
SEWER CAPITAL FACILITY ¤5,344.82 04/17/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 04/17/2023
SITE PLAN 30 ¤30.00 04/17/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 04/17/2023
WATER -IRRIGATION INSPECTION ¤25.00 04/17/2023
WATER -IRRIGATION INSPECTION ¤25.00 04/17/2023
PARKS IMPACT FEE ADMIN ¤53.07 04/17/2023
PARKS IMPACT FEE ADMIN (¤53.07) 04/17/2023
SURCHARGE FS 533.721 ¤3.30 04/17/2023
SURCHARGE - FS 468.631 ¤4.95 04/17/2023
SW ENG - FOUNDATION SURVEY ¤20.00 04/17/2023
SW ENG INSPECTION 80 ¤80.00 04/17/2023
SW ENG PRE APRON ¤30.00 04/17/2023
FIRE IMPACT FEE ADMIN ¤12.62 04/17/2023
FIRE IMPACT FEE ADMIN (¤12.62) 04/17/2023
FC IMPACT FEE EMS ¤62.00 04/17/2023
IMPACT FEE FIRE ¤420.52 04/17/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/17/2023
FC IMPACT FEE LIBRARY ¤268.00 04/17/2023
IMPACT FEE PARKS ¤1,769.15 04/17/2023
IMPACT FEE SCHOOL ¤5,450.00 04/17/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,016.23