Permit #2023031028

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00600-0080
CONDITIONED SPACE: 2000 sqft
GARAGE: 476 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
Total Square Footage: 2817 sqft
Block: 00600
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 912-258-2201
Location Address: 168 POINT PLEASANT DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/29/2023
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 0080
Contracted Stated Job Value: ¤215,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/28/2023 FINAL APPROVED KSANDOE
ROW - STORMWATER FINAL 09/28/2023 APPROVED - AS NOTED FSLADISH
Note: 09/28/23 REQUESTED CORRECTIONS MADE. SWALE HOLDING WATER BOTH UP AND DOWNSTREAM DUE TO HEAVY RECENT RAINS, APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 9/26/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF CULVERT PIPE 2) RIGHT SIDE OF HOUSE ALL SOD NEED TO BE CUT OFF OF ADJACENT FENCE
U -UTILITY RESIDENTIAL FINAL 09/26/2023 APPROVED - AS NOTED LFITZGERALD
Note: please do not make/have sewer C/O as an "ant hill"-lower it so is flush with grades on this residence and moving forward.
ROW - STORMWATER FINAL 09/26/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF CULVERT PIPE 2) RIGHT SIDE OF HOUSE ALL SOD NEED TO BE CUT OFF OF ADJACENT FENCE
U-CROSS CONNECTION 09/26/2023 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with DBL check-no cross connection 9/21/2023 - PREVIOUS INSPECTION NOTES no pumps in pep tank-utility-Eric informed
ROW - FINAL APRON (AFTER POUR) 09/26/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/22/2023 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 09/22/2023 APPROVED - AS NOTED FSLADISH
Note: 09/22/23 UPON WALKING THE SITE. YOU HAVE INDICATED A COMMON SWALE ON THE RIGHT SIDE ON YOUR FINAL SURVEY, BUT HAVE USED A W SWALE IN THE FIELD. THIS APPEARS TO WORK SO I WILL NOT FAIL YOU TODAY. IN THE FUTURE IF THEY ARE NOT IN SYNC AS SEEN IN THE FIELD, A REVISED SURVEY INDICATING THE SWALE ELEVATION SHOTS WILL BE REQUIRED. I AM PASSING THIS AS NOTED.
U-CROSS CONNECTION 09/21/2023 Disapproved - NO FEE LFITZGERALD
Note: no pumps in pep tank-utility-Eric informed
ELECTRIC - EARLY POWER 08/22/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1149. Release Power
U - SEWER TIE IN 08/15/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 08/03/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATION BEFORE POURING CONCRETE FOR THE DRIVEWAY. ALL CONCRETE NEEDS TO BE 3000PSI WITH FIBER OR WITH METAL MESH TO MEET ALL CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
PEP TANK INSTALLATION REQUEST 07/20/2023 APPROVED CBOWERMASTER
INSULATION 07/17/2023 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2420 Master bath does not have openable window. Exhaust fan will need to be added to shower area. Please submit revised electrical plan with included exhaust fan to building department for review.
ALL ROUGH 07/10/2023 APPROVED - AS NOTED KSANDOE
Note: Master bath does not have openable window. Exhaust fan will need to be added to shower area. Please submit revised electrical plan with included exhaust fan to building department for review.
LATH/BRICK/ WATER BARRIER 07/05/2023 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/30/2023 APPROVED KSANDOE
Note: 6/5/2023 - PREVIOUS INSPECTION NOTES 6/5/23: 1). Loose sheathing front right room (marked on wall below - check whole area) 2). T10 Truss is missing 1 piece of web bracing/engineering & has a damaged web. 3). Need pile of trash/debris on site cleaned up & put in dumpster.
ROOF VALLEY & METAL 06/08/2023 APPROVED RSIMS
Note: 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/23: 1). 5" x 5" wall flashing above the garage is not (tape/bull) sealed as required. 2). Right side ridge line - under;ayment is installed vertically. Must be installed horizontally per manufacturer's specsa & FBC.
ROOF VALLEY & METAL 06/06/2023 Disapproved - NO FEE RSIMS
Note: 6/6/23: 1). 5" x 5" wall flashing above the garage is not (tape/bull) sealed as required. 2). Right side ridge line - under;ayment is installed vertically. Must be installed horizontally per manufacturer's specsa & FBC.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/05/2023 Disapproved - NO FEE RSIMS
Note: 6/5/23: 1). Loose sheathing front right room (marked on wall below - check whole area) 2). T10 Truss is missing 1 piece of web bracing/engineering & has a damaged web. 3). Need pile of trash/debris on site cleaned up & put in dumpster.
ROOF SHEATHING 05/31/2023 APPROVED KSANDOE
WALL SHEATHING 05/31/2023 APPROVED KSANDOE
FOUND SURVEY APPROVED (OFFICE) 05/24/2023 APPROVED TBAKER
TIE BEAM / LINTEL 05/22/2023 APPROVED KSANDOE
MONOLITHIC SLAB 05/12/2023 APPROVED KSANDOE
PLUMBING 1ST ROUGH UNDERGROUND 05/05/2023 APPROVED KSANDOE
GRAVITY SEWER TEST 05/05/2023 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 04/12/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
ELEC COMPLETE 07/17/2023 07/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/13/2023 07/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/23/2023 05/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/23/2023 05/23/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 03/20/2023 06/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 03/19/2023 03/20/2023
Note: Released By: JPI
CUSVC COMPLETE 03/19/2023 03/22/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 03/19/2023 03/20/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/19/2023 03/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/19/2023 03/20/2023
LOCATE COMPLETE 03/19/2023 03/21/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/19/2023 03/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/19/2023 03/23/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 03/19/2023 03/21/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 09/28/2023
SW ENG - REVIEW 20 ¤20.00 03/29/2023
SW ENG RES REVIEW 200 ¤200.00 03/29/2023
TRANS IMPACT FEE ADMIN ¤54.36 03/29/2023
TRANS IMPACT FEE ADMIN (¤54.36) 03/29/2023
SEWER CREDIT (¤650.00) 03/29/2023
SEWER INSPECTION ¤25.00 03/29/2023
SEWER CAPITAL FACILITY ¤5,344.82 03/29/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 03/29/2023
SITE PLAN 30 ¤30.00 03/29/2023
WATER- TURN ON ¤25.00 03/29/2023
ADJUSTMENT 50% (¤465.08) 03/29/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/29/2023
INSPECTION - RESIDENTIAL ¤701.25 03/29/2023
PLAN REVIEW - RESIDENTIAL ¤198.90 03/29/2023
CONNECTION FEES ¤1,166.26 03/29/2023
FIRE IMPACT FEE ADMIN ¤12.62 03/29/2023
FIRE IMPACT FEE ADMIN (¤12.62) 03/29/2023
FC IMPACT FEE EMS ¤62.00 03/29/2023
IMPACT FEE FIRE ¤420.52 03/29/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/29/2023
FC IMPACT FEE LIBRARY ¤268.00 03/29/2023
IMPACT FEE PARKS ¤1,769.15 03/29/2023
IMPACT FEE SCHOOL ¤5,450.00 03/29/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 03/29/2023
WATER -IRRIGATION INSPECTION ¤25.00 03/29/2023
PARKS IMPACT FEE ADMIN ¤53.07 03/29/2023
PARKS IMPACT FEE ADMIN (¤53.07) 03/29/2023
SURCHARGE FS 533.721 ¤3.04 03/29/2023
SURCHARGE - FS 468.631 ¤4.56 03/29/2023
SW ENG - FOUNDATION SURVEY ¤20.00 03/29/2023
SW ENG INSPECTION 80 ¤80.00 03/29/2023
SW ENG PRE APRON ¤30.00 03/29/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,732.30