I want to search for...
Permit #2023031029
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00080-0160 |
| CONDITIONED SPACE: 2000 sqft |
| GARAGE: 476 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2817 sqft |
| Block: 00080 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 912-258-2201 |
| Location Address: 53 PEBBLE WOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/17/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 09/29/2023 | APPROVED - AS NOTED | RGROSS |
| Note: Builder had difficulty getting asphalt but finally was able to. 9/28/2023 - PREVIOUS INSPECTION NOTES HOT PARCH NEEDS TO BE COMPLETED. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/28/2023 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 has potable irrigation with DBL check-no cross connection | |||
| ROW - STORMWATER FINAL | 09/28/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: HOT PARCH NEEDS TO BE COMPLETED. | |||
| BLD - BUILDING FINAL | 09/28/2023 | FINAL APPROVED | KSANDOE |
| ROW - FINAL APRON (AFTER POUR) | 09/27/2023 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9465 09/27/23 drainage will work as indicated in survey. met with cm about two high spots in the swale that need to be lowered a bit. will have them corrected. everything else looked good at the time of this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/27/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/27/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/27/23 drainage will work as indicated in survey. met with cm about two high spots in the swale that need to be lowered a bit. will have them corrected. everything else looked good at the time of this inspection. | |||
| U-CROSS CONNECTION | 09/26/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with DBL check-no cross connection | |||
| U - SEWER TIE IN | 09/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 09/08/2023 | APPROVED | JSTEWART |
| ROW- PRE-APRON (PRE-POUR) | 08/21/2023 | APPROVED | FSLADISH |
| Note: 08/21/23 PIPE IS GOOD. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| INSULATION | 08/01/2023 | APPROVED | KSANDOE |
| Note: 7/31/2023 - PREVIOUS INSPECTION NOTES Previous note has not been addressed Inspector Notes from Inspection 2420 Missing framing over sub panel | |||
| INSULATION | 07/31/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Previous note has not been addressed Inspector Notes from Inspection 2420 Missing framing over sub panel | |||
| ALL ROUGH | 07/26/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Missing framing over sub panel | |||
| LATH/BRICK/ WATER BARRIER | 07/24/2023 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 07/13/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 07/13/2023 | APPROVED | KSANDOE |
| Note: 7/12/2023 - PREVIOUS INSPECTION NOTES Need building plans on site for inspector use | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/13/2023 | APPROVED | KSANDOE |
| Note: 7/12/2023 - PREVIOUS INSPECTION NOTES Truss bracing ok. Need building plans on site for inspector use | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Truss bracing ok. Need building plans on site for inspector use | |||
| WALL SHEATHING | 07/12/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Need building plans on site for inspector use | |||
| ROOF SHEATHING | 07/07/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 06/21/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/15/2023 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 06/06/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/02/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/02/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 05/30/2023 | APPROVED | CSTONE |
| WATER METER INSTALLATION REQUEST | 05/12/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/21/2023 | 06/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/21/2023 | 06/21/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/04/2023 | 04/04/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/04/2023 | 04/04/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/04/2023 | 04/12/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/20/2023 | 06/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/19/2023 | 03/20/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/19/2023 | 03/22/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 03/19/2023 | 03/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/19/2023 | 03/20/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/19/2023 | 03/20/2023 |
| LOCATE | COMPLETE | 03/19/2023 | 03/21/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/19/2023 | 03/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/19/2023 | 03/23/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/19/2023 | 03/21/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site Plan : provided is for right side garage All plans except for site plan match. Please submit the correct side being proposed |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/28/2023 |
| CONNECTION FEES | ¤1,166.26 | 04/17/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 04/17/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 04/17/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 04/17/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 04/17/2023 |
| IMPACT FEE FIRE | ¤420.52 | 04/17/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/17/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/17/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/17/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/17/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 04/17/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/17/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 04/17/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/17/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 04/17/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 04/17/2023 |
| SURCHARGE FS 533.721 | ¤3.04 | 04/17/2023 |
| SURCHARGE - FS 468.631 | ¤4.56 | 04/17/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/17/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/17/2023 |
| SW ENG PRE APRON | ¤30.00 | 04/17/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/17/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/17/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 04/17/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 04/17/2023 |
| SEWER CREDIT | (¤958.00) | 04/17/2023 |
| SEWER INSPECTION | ¤25.00 | 04/17/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 04/17/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 04/17/2023 |
| SITE PLAN 30 | ¤30.00 | 04/17/2023 |
| WATER- TURN ON | ¤25.00 | 04/17/2023 |
| ADJUSTMENT 50% | (¤465.08) | 04/17/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/17/2023 |
| INSPECTION - RESIDENTIAL | ¤701.25 | 04/17/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤198.90 | 04/17/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,992.30 |