I want to search for...
Permit #2023031533
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00540-0070 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00540 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 832-726-2202 |
| Location Address: 18 RYKEN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/09/2023 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: ZZMZ CASPIAN, LLC |
|
Address 1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
|
Address #162 ORLANDO, FL 32826 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ALEKSANDRA LUSHI
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
9360 CRAVEN RD JACKSONVILLE, FL 32257 |
APT 401 JACKSONVILLE, FL 32257 |
CAC1820975 (Exp: 08/31/2026) | 904-338-8522 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/27/2024 | FINAL APPROVED | JWALKER |
| Note: 2/23/2024 - PREVIOUS INSPECTION NOTES 1. House number not installed. 2. HVAC, Seal the ceiling where the flex duct supply plenum penetrates the ceiling. | |||
| BLD - BUILDING FINAL | 02/23/2024 | Disapproved - NO FEE | JWALKER |
| Note: 1. House number not installed. 2. HVAC, Seal the ceiling where the flex duct supply plenum penetrates the ceiling. | |||
| ROW - STORMWATER FINAL | 02/09/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THERE IS A LITTLE PIECE OF CONCRETE ON THE LEFT SIDE NEED TO BE PICKED UP. PASSING AS NOTED | |||
| U -UTILITY RESIDENTIAL FINAL | 02/09/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/07/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/07/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/07/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/03/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 12/12/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 1220. Release Power 9/19/2023 - PREVIOUS INSPECTION NOTES Secure the 3/4 conduit protecting the grounding electrode to the bottom of the panel. | |||
| U - SEWER TIE IN | 12/01/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 9/29/2023 - PREVIOUS INSPECTION NOTES NOT RAN YET C/M TO SCHEDULE A U-SEWER TIE IN ON 11/30/23 | |||
| GRAVITY SEWER TEST | 11/29/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 9/29/2023 - PREVIOUS INSPECTION NOTES NOT RAN YET C/M TO SCHEDULE A U-SEWER TIE IN ON 11/30/23 | |||
| PEP TANK INSTALLATION REQUEST | 10/12/2023 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | 09/29/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U - SEWER TIE IN | 09/29/2023 | Disapproved - NO FEE | MGIBSON |
| Note: PEP TANK NOT EVEN INSTALLED | |||
| GRAVITY SEWER TEST | 09/29/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NOT RAN YET | |||
| ELECTRIC-TUG | 09/26/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1220. Release Power 9/19/2023 - PREVIOUS INSPECTION NOTES Secure the 3/4 conduit protecting the grounding electrode to the bottom of the panel. | |||
| INSULATION | 09/26/2023 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 09/20/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 9/19/23 The bath fans and the duct layout listed below will need to be corrected before insulation inspection can pass. 9/14/2023 - PREVIOUS INSPECTION NOTES 1. Install missing nail plates multiple areas for wiring and plumbing at the top and bottom plates of the 2x walls. Knee wall also. Check all areas. 2. Please have the approved duct layout drawing onsite at the reinspection. 3. The bathroom exhaust fan ducts need to be connected to the fans with a proper 3" to 4" connector. 4. Seal the tub drain and kitchen sink drain concrete cut outs. 5. Right side front entry door top chord furring strip / fire blocking is missing. | |||
| ALL ROUGH | 09/19/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 9/19/23 The bath fans and the duct layout listed below will need to be corrected before insulation inspection can pass. 9/14/2023 - PREVIOUS INSPECTION NOTES 1. Install missing nail plates multiple areas for wiring and plumbing at the top and bottom plates of the 2x walls. Knee wall also. Check all areas. 2. Please have the approved duct layout drawing onsite at the reinspection. 3. The bathroom exhaust fan ducts need to be connected to the fans with a proper 3" to 4" connector. 4. Seal the tub drain and kitchen sink drain concrete cut outs. 5. Right side front entry door top chord furring strip / fire blocking is missing. | |||
| ELECTRIC-TUG | 09/19/2023 | Disapproved - NO FEE | JWALKER |
| Note: Secure the 3/4 conduit protecting the grounding electrode to the bottom of the panel. | |||
| ALL ROUGH | 09/14/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Install missing nail plates multiple areas for wiring and plumbing at the top and bottom plates of the 2x walls. Knee wall also. Check all areas. 2. Please have the approved duct layout drawing onsite at the reinspection. 3. The bathroom exhaust fan ducts need to be connected to the fans with a proper 3" to 4" connector. 4. Seal the tub drain and kitchen sink drain concrete cut outs. 5. Right side front entry door top chord furring strip / fire blocking is missing. | |||
| ROOF VALLEY & METAL | 08/17/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 8/9/23 1. Install strap at garage door. 2 Install Hold down anchor at truss CJo1 Check at all rough for corrections. 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23: 1). Roof sheathing (2nd sheet up) is not nailed to the T08 & T09 trusses. Marked on top side of plywood & on wall below area. 2). CJ01 truss in garage is missing a strap. 3). 2 Ply Truss T15 needs more nails in the bottom cord per MiTek requirements. 4). Garage (interior) door framing is missing a full stud on one side, missing 42" straps & missing fitch plate as required on plans. 5). Both ledger boards on either side of front covered porch are missing the fitch plate as required on the plans. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/09/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 8/9/23 1. Install strap at garage door. 2 Install Hold down anchor at truss CJo1 Check at all rough for corrections. 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23: 1). Roof sheathing (2nd sheet up) is not nailed to the T08 & T09 trusses. Marked on top side of plywood & on wall below area. 2). CJ01 truss in garage is missing a strap. 3). 2 Ply Truss T15 needs more nails in the bottom cord per MiTek requirements. 4). Garage (interior) door framing is missing a full stud on one side, missing 42" straps & missing fitch plate as required on plans. 5). Both ledger boards on either side of front covered porch are missing the fitch plate as required on the plans. | |||
| WALL SHEATHING | 08/01/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/01/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 8/1/23: 1). Roof sheathing (2nd sheet up) is not nailed to the T08 & T09 trusses. Marked on top side of plywood & on wall below area. 2). CJ01 truss in garage is missing a strap. 3). 2 Ply Truss T15 needs more nails in the bottom cord per MiTek requirements. 4). Garage (interior) door framing is missing a full stud on one side, missing 42" straps & missing fitch plate as required on plans. 5). Both ledger boards on either side of front covered porch are missing the fitch plate as required on the plans. | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/26/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 07/13/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 07/05/2023 | APPROVED | JWALKER |
| Note: 6/29/2023 - PREVIOUS INSPECTION NOTES Rear porch area has not been tamped Clear washout on right side of garage 6/28/2023 - PREVIOUS INSPECTION NOTES UFER has not been installed. Tamp the rear proch area of the slab. | |||
| MONOLITHIC SLAB | 06/29/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Rear porch area has not been tamped Clear washout on right side of garage 6/28/2023 - PREVIOUS INSPECTION NOTES UFER has not been installed. Tamp the rear proch area of the slab. | |||
| MONOLITHIC SLAB | 06/28/2023 | Disapproved - NO FEE | JWALKER |
| Note: UFER has not been installed. Tamp the rear proch area of the slab. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/23/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/08/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/20/2024 | 02/21/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/25/2023 | 07/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/25/2023 | 07/25/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/05/2023 | 04/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/05/2023 | 04/13/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/05/2023 | 04/05/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/29/2023 | 06/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/28/2023 | 03/28/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/28/2023 | 03/30/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 03/28/2023 | 03/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/28/2023 | 03/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/28/2023 | 03/29/2023 |
| LOCATE | COMPLETE | 03/28/2023 | 03/31/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/28/2023 | 03/29/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/28/2023 | 04/04/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) NEED TO HAVE EXISTING ELEVATION 10' OUT SIDE THE PROPERTY LINE IN THE BACK LOT AND RIGHT ADJACENT LOT. 2) NEED TOHAVE CENTERLINE OF ROAD ELEVATION SO WE CAN DETERMIND IF FFE IS A MINIMUM OF 12" ABOVE THE ROAD | |||
| ZON | COMPLETE | 03/28/2023 | 03/28/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/28/2023 | 03/29/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/28/2023 | 03/29/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please provide center line of road elevations on survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/29/2024 |
| CONNECTION FEES | ¤1,166.26 | 05/09/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 05/09/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 05/09/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 05/09/2023 |
| IMPACT FEE FIRE | ¤420.52 | 05/09/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/09/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/09/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 05/09/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/09/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 05/09/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/09/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 05/09/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 05/09/2023 |
| SURCHARGE FS 533.721 | ¤2.47 | 05/09/2023 |
| SURCHARGE - FS 468.631 | ¤3.71 | 05/09/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/09/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/09/2023 |
| SW ENG PRE APRON | ¤30.00 | 05/09/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/09/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/09/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 05/09/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 05/09/2023 |
| SEWER CREDIT | (¤1,466.00) | 05/09/2023 |
| SEWER INSPECTION | ¤25.00 | 05/09/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 05/09/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 05/09/2023 |
| SITE PLAN 30 | ¤30.00 | 05/09/2023 |
| WATER- TURN ON | ¤25.00 | 05/09/2023 |
| ADJUSTMENT 50% | (¤366.24) | 05/09/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/09/2023 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 05/09/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 05/09/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,916.04 |