I want to search for...
Permit #2023031672
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00320-0160 |
| CONDITIONED SPACE: 2622 sqft |
| GARAGE: 998 sqft |
| OPENED PORCH (WITH ROOF) : 432 sqft |
| Total Square Footage: 4052 sqft |
| Block: 00320 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 386-585-2654 |
| Location Address: 23 ROSEPETAL LN |
| Type: DU - DUPLEX |
| Issue Date: 05/04/2023 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: 23 ROSE PETAL LANE LLC |
|
Address 3725 TEBALDI PLACE MELBOURNE, FL 32934 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
GREGORY ALLEN HENRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1332 SUNSET BLVD DAYTONA BEACH, FL 32117 |
EC13009193 (Exp: 08/31/2026) | 386-679-6908 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/21/2024 | FINAL APPROVED | JWALKER |
| Note: 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24 Corrections in Unit A listed below have not been completed. Unit B the door is locked. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/24 Only number 6 from the list below has been corrected. 2/8/2024 - PREVIOUS INSPECTION NOTES 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units. Please label breakers light circuits, what is F/P? General power not clear label. | |||
| BLD - BUILDING FINAL | 02/20/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 2/20/24 Corrections in Unit A listed below have not been completed. Unit B the door is locked. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/24 Only number 6 from the list below has been corrected. 2/8/2024 - PREVIOUS INSPECTION NOTES 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units. Please label breakers light circuits, what is F/P? General power not clear label. | |||
| BLD - BUILDING FINAL | 02/14/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 2/14/24 Only number 6 from the list below has been corrected. 2/8/2024 - PREVIOUS INSPECTION NOTES 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units. Please label breakers light circuits, what is F/P? General power not clear label. | |||
| BLD - BUILDING FINAL | 02/08/2024 | Disapproved - NO FEE | JWALKER |
| Note: 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units. | |||
| BLD - BUILDING FINAL | 02/05/2024 | Disapproved - NO FEE | JWALKER |
| Note: 2/5/24 There is power to either of the units. Checked main disconnect breakers. Breakers are on. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at final | |||
| U-CROSS CONNECTION | 02/05/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ROW - FINAL INSPECTION | 02/05/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THERE A LITTLE OD DIRT IN THE CULVERT END AND SOME TRASH IN THE VACANT LOT TO THE LEFT PLEASE PICK UP ALL AND CLEAN OUT CULVERT | |||
| U -UTILITY RESIDENTIAL FINAL | 02/05/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: going forward if sewer C/O is right next to driveway edge-encase in concrete in case vehicle drives over | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/01/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: LOOKS LIKE THE 28.70 ON THE BACK RIGHT SIDE OF HOUSE IS A TYPE O SO PASSING AS NOTED THAT I TALKED TO DC ABOUT THE FINAL SURVEY AND LOOKS LIKE DRAINAGE IS WORKING CORRECTLY. --------------------------------------------------------------------- 1/31/2024 - PREVIOUS INSPECTION NOTES TALKED TO DC ABOUT THE FINAL SURVEY SHOWING THAT THE DRAINAGE DOESN'T HAVE POSITIVE FALL ON THE SURVEY. FIELD LOOKS LIKE THAT IT WIL FLOW CORRECTLY BUT FINAL SURVEY STILL NEEDS TO BE UP TO THE CITY'S STANDARDS ON THE DRAINAGE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/01/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------- LOOKS LIKE THE 28.70 ON THE BACK RIGHT SIDE OF HOUSE IS A TYPE O SO PASSING AS NOTED THAT I TALKED TO DC ABOUT THE FINAL SURVEY AND LOOKS LIKE DRAINAGE IS WORKING CORRECTLY. --------------------------------------------------------------------- 1/31/2024 - PREVIOUS INSPECTION NOTES TALKED TO DC ABOUT THE FINAL SURVEY SHOWING THAT THE DRAINAGE DOESN'T HAVE POSITIVE FALL ON THE SURVEY. FIELD LOOKS LIKE THAT IT WIL FLOW CORRECTLY BUT FINAL SURVEY STILL NEEDS TO BE UP TO THE CITY'S STANDARDS ON THE DRAINAGE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. 1/31/2024 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY NEEDS TO BE PASSED BEFORE THIS INSPECTION IS DONE. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/01/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/31/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: TALKED TO DC ABOUT THE FINAL SURVEY SHOWING THAT THE DRAINAGE DOESN'T HAVE POSITIVE FALL ON THE SURVEY. FIELD LOOKS LIKE THAT IT WIL FLOW CORRECTLY BUT FINAL SURVEY STILL NEEDS TO BE UP TO THE CITY'S STANDARDS ON THE DRAINAGE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/31/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FINAL SURVEY NEEDS TO BE PASSED BEFORE THIS INSPECTION IS DONE. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/29/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/29/23 PIPES ARE BOTH GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U - SEWER TIE IN | 12/19/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/19/2023 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 12/06/2023 | APPROVED | JWALKER |
| FIREWALL FINAL | 09/27/2023 | FINAL APPROVED | JWALKER |
| LATH/BRICK/ WATER BARRIER | 09/12/2023 | APPROVED | JWALKER |
| Note: 9/11/2023 - PREVIOUS INSPECTION NOTES 9/11/23: Both Units: Holes in cinderblock require wire lath over holes including holes that are spray foam or have syrofoam insulation in the hole. | |||
| LATH/BRICK/ WATER BARRIER | 09/11/2023 | Disapproved - NO FEE | RSIMS |
| Note: 9/11/23: Both Units: Holes in cinderblock require wire lath over holes including holes that are spray foam or have syrofoam insulation in the hole. | |||
| FIREWALL DRYWALL NAILING | 09/11/2023 | APPROVED | RSIMS |
| INSULATION | 09/06/2023 | APPROVED | JWALKER |
| Note: 9/5/2023 - PREVIOUS INSPECTION NOTES 9/5/23 Unit A the cut out listed below has not been corrected. The drip pans have not been corrected. M1411.3.1 1. The concrete cut outs at the tub drains need to sealed. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at insulation inspection. Inspector Notes from Inspection 2443 Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny. | |||
| INSULATION | 09/05/2023 | Disapproved - NO FEE | JWALKER |
| Note: 9/5/23 Unit A the cut out listed below has not been corrected. The drip pans have not been corrected. M1411.3.1 1. The concrete cut outs at the tub drains need to sealed. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at insulation inspection. Inspector Notes from Inspection 2443 Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny. | |||
| ALL ROUGH | 08/24/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. The concrete cut outs at the tub drains need to sealed. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at insulation inspection. Inspector Notes from Inspection 2443 Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny. | |||
| FIREWALL DRYWALL NAILING | 08/18/2023 | APPROVED - AS NOTED | JWALKER |
| Note: Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny. | |||
| WALL SHEATHING | 07/31/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/31/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Trusses T-19 install MGT anchors at the interior CMU See engineering packet for required uplift. 2. Trusses T-14 at the fire wall install hold down anchors minimum 4' o.c. Check for corrections at All Rough inspection. | |||
| ROOF VALLEY & METAL | 07/31/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 07/28/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 07/10/2023 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 07/07/2023 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 06/28/2023 | APPROVED | JWALKER |
| Note: 6/27/2023 - PREVIOUS INSPECTION NOTES 6/27/23 Rear of slab soil has been washed out by rains. Rebar is to have 3" ground clearance. Check all footings at reinspeciton. 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23 Compaction test is not onsite. Time 8:57am Pipe at left side footing will need to be sleeved. New inspection due to canceled inspection 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection. | |||
| MONOLITHIC SLAB | 06/27/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/27/23 Rear of slab soil has been washed out by rains. Rebar is to have 3" ground clearance. Check all footings at reinspeciton. 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23 Compaction test is not onsite. Time 8:57am Pipe at left side footing will need to be sleeved. New inspection due to canceled inspection 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection. | |||
| MONOLITHIC SLAB | 06/23/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection. | |||
| MONOLITHIC SLAB | 06/23/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 6/23/23 Compaction test is not onsite. Time 8:57am Pipe at left side footing will need to be sleeved. New inspection due to canceled inspection 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection. | |||
| MONOLITHIC SLAB | 06/22/2023 | Disapproved - NO FEE | JWALKER |
| Note: Compaction test not posted in the job box. Stopped inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/15/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/09/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/28/2023 | 07/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/28/2023 | 07/28/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/02/2023 | 05/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/24/2023 | 04/24/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 4/0 copper is not rated for the 400 amp service. NEC 2017 Table 310.15(B)(16). | |||
| ZON | COMPLETE | 04/24/2023 | 04/25/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/16/2023 | 04/17/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor PLan needs to be revised as the AC shows on the sides of the house all plans need to match | |||
| ELEC | HOLD | 04/16/2023 | 04/17/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 3/0 copper is not rated for the 400 amp service. NEC 2017 Table 310.15(B)(16). | |||
| ZON | HOLD | 04/06/2023 | 04/06/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please revise the landscape plan and the floor plan to match the new site plan. Location of AC must change on those plans as well | |||
| ENGIN1 | COMPLETE | 04/06/2023 | 04/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/06/2023 | 04/14/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/31/2023 | 06/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/30/2023 | 03/31/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/30/2023 | 03/31/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 03/30/2023 | 03/31/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs. 2. None of the wire sizes are correct on your riser diagram. NEC 2017 Table 310.15(B)(16) | |||
| ENGIN1 | COMPLETE | 03/30/2023 | 03/31/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/30/2023 | 03/31/2023 |
| LOCATE | COMPLETE | 03/30/2023 | 04/04/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/30/2023 | 03/31/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/30/2023 | 04/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/30/2023 | 03/31/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: proposed plan shows the AC in a 7.5 Easement please revise your plans and relocate your mechanical Please revose all plans to show new location of AC | |||
| BADMIN | COMPLETE | 03/30/2023 | 03/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/21/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/21/2024 |
| CONNECTION FEES | ¤2,332.52 | 05/04/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 05/04/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 05/04/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 05/04/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 05/04/2023 |
| IMPACT FEE FIRE | ¤841.04 | 05/04/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 05/04/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 05/04/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 05/04/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 05/04/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 05/04/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 05/04/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 05/04/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 05/04/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 05/04/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 05/04/2023 |
| SURCHARGE FS 533.721 | ¤4.00 | 05/04/2023 |
| SURCHARGE - FS 468.631 | ¤6.00 | 05/04/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/04/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/04/2023 |
| SW ENG PRE APRON | ¤30.00 | 05/04/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/04/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/04/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 05/04/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 05/04/2023 |
| SEWER CREDIT | (¤2,533.86) | 05/04/2023 |
| SEWER INSPECTION | ¤25.00 | 05/04/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 05/04/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 05/04/2023 |
| SITE PLAN 30 | ¤30.00 | 05/04/2023 |
| WATER- TURN ON | ¤25.00 | 05/04/2023 |
| WATER- TURN ON | ¤25.00 | 05/04/2023 |
| ADJUSTMENT 50% | (¤632.75) | 05/04/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/04/2023 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 05/04/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 05/04/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤39,927.15 |