Permit #2023031672

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00320-0160
CONDITIONED SPACE: 2622 sqft
GARAGE: 998 sqft
OPENED PORCH (WITH ROOF) : 432 sqft
Total Square Footage: 4052 sqft
Block: 00320
Subdivision: 2155 - SECTION 32-ROYAL PALMS
Job Phone: 386-585-2654
Location Address: 23 ROSEPETAL LN
Type: DU - DUPLEX
Issue Date: 05/04/2023
NOC: RECORDED
Applicant name: DESIDERIO CARLOS CARREIRO
Owner: 23 ROSE PETAL LANE LLC

Address

3725 TEBALDI PLACE

MELBOURNE, FL 32934

Lot: 0160
Contracted Stated Job Value: ¤250,000.00
Job Description: DUPLEX
Type: CN

Contractor

RED LINE CONSTRUCTION CO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654

Sub Contractors

GREGORY ALLEN HENRY
Status Location Address State License Number Phone
ACTIVE

1332 SUNSET BLVD

DAYTONA BEACH, FL 32117

EC13009193 (Exp: 08/31/2026) 386-679-6908
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/21/2024 FINAL APPROVED JWALKER
Note: 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24 Corrections in Unit A listed below have not been completed. Unit B the door is locked. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/24 Only number 6 from the list below has been corrected. 2/8/2024 - PREVIOUS INSPECTION NOTES 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units. Please label breakers light circuits, what is F/P? General power not clear label.
BLD - BUILDING FINAL 02/20/2024 Disapproved -FEE REQUIRED JWALKER
Note: 2/20/24 Corrections in Unit A listed below have not been completed. Unit B the door is locked. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/24 Only number 6 from the list below has been corrected. 2/8/2024 - PREVIOUS INSPECTION NOTES 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units. Please label breakers light circuits, what is F/P? General power not clear label.
BLD - BUILDING FINAL 02/14/2024 Disapproved -FEE REQUIRED JWALKER
Note: 2/14/24 Only number 6 from the list below has been corrected. 2/8/2024 - PREVIOUS INSPECTION NOTES 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units. Please label breakers light circuits, what is F/P? General power not clear label.
BLD - BUILDING FINAL 02/08/2024 Disapproved - NO FEE JWALKER
Note: 1. Smoke detectors in Unit B are not communicating. 2. Unit A rear bedroom the outlet next to the window is not working. 3. Energy calculations are not onsite. 4. Insulation placard not posted. 5. Unit A, The AHU has no work space platform . 6. Unit B The AHU has no work space.platform. The attic access is too close to the unit. In order to have a work space platform at 30 x 30" the attic access will need to be relocated. 7. Both AHU in the attic are supported on 2x4. The 2x4's need to be pressure treated. 8 . AFIC are require 15- and 20- ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms. Check all breakers at the reinspection at both electircal sub panels in both units.
BLD - BUILDING FINAL 02/05/2024 Disapproved - NO FEE JWALKER
Note: 2/5/24 There is power to either of the units. Checked main disconnect breakers. Breakers are on. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at final
U-CROSS CONNECTION 02/05/2024 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW - FINAL INSPECTION 02/05/2024 APPROVED - AS NOTED PFLANAGAN
Note: THERE A LITTLE OD DIRT IN THE CULVERT END AND SOME TRASH IN THE VACANT LOT TO THE LEFT PLEASE PICK UP ALL AND CLEAN OUT CULVERT
U -UTILITY RESIDENTIAL FINAL 02/05/2024 APPROVED - AS NOTED LFITZGERALD
Note: going forward if sewer C/O is right next to driveway edge-encase in concrete in case vehicle drives over
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/01/2024 APPROVED - AS NOTED PFLANAGAN
Note: LOOKS LIKE THE 28.70 ON THE BACK RIGHT SIDE OF HOUSE IS A TYPE O SO PASSING AS NOTED THAT I TALKED TO DC ABOUT THE FINAL SURVEY AND LOOKS LIKE DRAINAGE IS WORKING CORRECTLY. --------------------------------------------------------------------- 1/31/2024 - PREVIOUS INSPECTION NOTES TALKED TO DC ABOUT THE FINAL SURVEY SHOWING THAT THE DRAINAGE DOESN'T HAVE POSITIVE FALL ON THE SURVEY. FIELD LOOKS LIKE THAT IT WIL FLOW CORRECTLY BUT FINAL SURVEY STILL NEEDS TO BE UP TO THE CITY'S STANDARDS ON THE DRAINAGE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/01/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------- LOOKS LIKE THE 28.70 ON THE BACK RIGHT SIDE OF HOUSE IS A TYPE O SO PASSING AS NOTED THAT I TALKED TO DC ABOUT THE FINAL SURVEY AND LOOKS LIKE DRAINAGE IS WORKING CORRECTLY. --------------------------------------------------------------------- 1/31/2024 - PREVIOUS INSPECTION NOTES TALKED TO DC ABOUT THE FINAL SURVEY SHOWING THAT THE DRAINAGE DOESN'T HAVE POSITIVE FALL ON THE SURVEY. FIELD LOOKS LIKE THAT IT WIL FLOW CORRECTLY BUT FINAL SURVEY STILL NEEDS TO BE UP TO THE CITY'S STANDARDS ON THE DRAINAGE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. 1/31/2024 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY NEEDS TO BE PASSED BEFORE THIS INSPECTION IS DONE.
ROW - FINAL APRON (AFTER POUR) 02/01/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/31/2024 Disapproved - NO FEE PFLANAGAN
Note: TALKED TO DC ABOUT THE FINAL SURVEY SHOWING THAT THE DRAINAGE DOESN'T HAVE POSITIVE FALL ON THE SURVEY. FIELD LOOKS LIKE THAT IT WIL FLOW CORRECTLY BUT FINAL SURVEY STILL NEEDS TO BE UP TO THE CITY'S STANDARDS ON THE DRAINAGE. Sec.300.01 (4,5,6) The tolerance along side lot lines is no more than 20 feet, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet.
ROW FIELD SURVEY /GRADING CERTIFICATION 01/31/2024 Disapproved - NO FEE PFLANAGAN
Note: THE FINAL SURVEY NEEDS TO BE PASSED BEFORE THIS INSPECTION IS DONE.
ROW- PRE-APRON (PRE-POUR) 12/29/2023 APPROVED - AS NOTED FSLADISH
Note: 12/29/23 PIPES ARE BOTH GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
U - SEWER TIE IN 12/19/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 12/19/2023 APPROVED MGIBSON
ELECTRIC - EARLY POWER 12/06/2023 APPROVED JWALKER
FIREWALL FINAL 09/27/2023 FINAL APPROVED JWALKER
LATH/BRICK/ WATER BARRIER 09/12/2023 APPROVED JWALKER
Note: 9/11/2023 - PREVIOUS INSPECTION NOTES 9/11/23: Both Units: Holes in cinderblock require wire lath over holes including holes that are spray foam or have syrofoam insulation in the hole.
LATH/BRICK/ WATER BARRIER 09/11/2023 Disapproved - NO FEE RSIMS
Note: 9/11/23: Both Units: Holes in cinderblock require wire lath over holes including holes that are spray foam or have syrofoam insulation in the hole.
FIREWALL DRYWALL NAILING 09/11/2023 APPROVED RSIMS
INSULATION 09/06/2023 APPROVED JWALKER
Note: 9/5/2023 - PREVIOUS INSPECTION NOTES 9/5/23 Unit A the cut out listed below has not been corrected. The drip pans have not been corrected. M1411.3.1 1. The concrete cut outs at the tub drains need to sealed. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at insulation inspection. Inspector Notes from Inspection 2443 Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny.
INSULATION 09/05/2023 Disapproved - NO FEE JWALKER
Note: 9/5/23 Unit A the cut out listed below has not been corrected. The drip pans have not been corrected. M1411.3.1 1. The concrete cut outs at the tub drains need to sealed. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at insulation inspection. Inspector Notes from Inspection 2443 Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny.
ALL ROUGH 08/24/2023 APPROVED - AS NOTED JWALKER
Note: 1. The concrete cut outs at the tub drains need to sealed. 2. The drip pans under the AHU are to be 3" wider than the units. Check for corrections at insulation inspection. Inspector Notes from Inspection 2443 Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny.
FIREWALL DRYWALL NAILING 08/18/2023 APPROVED - AS NOTED JWALKER
Note: Seal gaps at the draft stop. Full wall DOES NOT HAVE TO BE TAPED. Can seal gaps with fire foam. Check at isulation. Inspection for attic truss draft stop olny.
WALL SHEATHING 07/31/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/31/2023 APPROVED - AS NOTED JWALKER
Note: 1. Trusses T-19 install MGT anchors at the interior CMU See engineering packet for required uplift. 2. Trusses T-14 at the fire wall install hold down anchors minimum 4' o.c. Check for corrections at All Rough inspection.
ROOF VALLEY & METAL 07/31/2023 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 07/28/2023 APPROVED TBAKER
TIE BEAM / LINTEL 07/10/2023 APPROVED JWALKER
TIE BEAM / LINTEL 07/07/2023 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 06/28/2023 APPROVED JWALKER
Note: 6/27/2023 - PREVIOUS INSPECTION NOTES 6/27/23 Rear of slab soil has been washed out by rains. Rebar is to have 3" ground clearance. Check all footings at reinspeciton. 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23 Compaction test is not onsite. Time 8:57am Pipe at left side footing will need to be sleeved. New inspection due to canceled inspection 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection.
MONOLITHIC SLAB 06/27/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/27/23 Rear of slab soil has been washed out by rains. Rebar is to have 3" ground clearance. Check all footings at reinspeciton. 6/23/2023 - PREVIOUS INSPECTION NOTES 6/23/23 Compaction test is not onsite. Time 8:57am Pipe at left side footing will need to be sleeved. New inspection due to canceled inspection 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection.
MONOLITHIC SLAB 06/23/2023 CANCELLED BY APPLICANT WEB
Note: 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection.
MONOLITHIC SLAB 06/23/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/23/23 Compaction test is not onsite. Time 8:57am Pipe at left side footing will need to be sleeved. New inspection due to canceled inspection 6/22/2023 - PREVIOUS INSPECTION NOTES Compaction test not posted in the job box. Stopped inspection.
MONOLITHIC SLAB 06/22/2023 Disapproved - NO FEE JWALKER
Note: Compaction test not posted in the job box. Stopped inspection.
PLUMBING 1ST ROUGH UNDERGROUND 06/15/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 06/09/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/28/2023 07/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/28/2023 07/28/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 05/02/2023 05/02/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 04/24/2023 04/24/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 4/0 copper is not rated for the 400 amp service. NEC 2017 Table 310.15(B)(16).
ZON COMPLETE 04/24/2023 04/25/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 04/16/2023 04/17/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor PLan needs to be revised as the AC shows on the sides of the house all plans need to match
ELEC HOLD 04/16/2023 04/17/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 3/0 copper is not rated for the 400 amp service. NEC 2017 Table 310.15(B)(16).
ZON HOLD 04/06/2023 04/06/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please revise the landscape plan and the floor plan to match the new site plan. Location of AC must change on those plans as well
ENGIN1 COMPLETE 04/06/2023 04/06/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/06/2023 04/14/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SWALE COMPLETE 03/31/2023 06/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 03/30/2023 03/31/2023
Note: Released By: JPI
CUSVC COMPLETE 03/30/2023 03/31/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC HOLD 03/30/2023 03/31/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs. 2. None of the wire sizes are correct on your riser diagram. NEC 2017 Table 310.15(B)(16)
ENGIN1 COMPLETE 03/30/2023 03/31/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/30/2023 03/31/2023
LOCATE COMPLETE 03/30/2023 04/04/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 03/30/2023 03/31/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/30/2023 04/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 03/30/2023 03/31/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: proposed plan shows the AC in a 7.5 Easement please revise your plans and relocate your mechanical Please revose all plans to show new location of AC
BADMIN COMPLETE 03/30/2023 03/31/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/21/2024
REINSPECTION RESIDENTIAL ¤40.00 02/21/2024
REINSPECTION RESIDENTIAL ¤40.00 02/21/2024
REINSPECTION RESIDENTIAL ¤40.00 02/21/2024
CONNECTION FEES ¤2,332.52 05/04/2023
FIRE IMPACT FEE ADMIN ¤25.23 05/04/2023
FIRE IMPACT FEE ADMIN (¤25.23) 05/04/2023
FC IMPACT FEE EMS ¤124.00 05/04/2023
FC IMPACT FEE EMS ¤124.00 05/04/2023
IMPACT FEE FIRE ¤841.04 05/04/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 05/04/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 05/04/2023
FC IMPACT FEE LIBRARY ¤536.00 05/04/2023
FC IMPACT FEE LIBRARY ¤536.00 05/04/2023
IMPACT FEE PARKS ¤3,538.30 05/04/2023
IMPACT FEE SCHOOL ¤10,900.00 05/04/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 05/04/2023
WATER -IRRIGATION INSPECTION ¤50.00 05/04/2023
PARKS IMPACT FEE ADMIN ¤106.15 05/04/2023
PARKS IMPACT FEE ADMIN (¤106.15) 05/04/2023
SURCHARGE FS 533.721 ¤4.00 05/04/2023
SURCHARGE - FS 468.631 ¤6.00 05/04/2023
SW ENG - FOUNDATION SURVEY ¤20.00 05/04/2023
SW ENG INSPECTION 80 ¤80.00 05/04/2023
SW ENG PRE APRON ¤30.00 05/04/2023
SW ENG - REVIEW 20 ¤20.00 05/04/2023
SW ENG RES REVIEW 200 ¤200.00 05/04/2023
TRANS IMPACT FEE ADMIN ¤84.36 05/04/2023
TRANS IMPACT FEE ADMIN (¤84.36) 05/04/2023
SEWER CREDIT (¤2,533.86) 05/04/2023
SEWER INSPECTION ¤25.00 05/04/2023
SEWER CAPITAL FACILITY ¤10,689.64 05/04/2023
WATER CAPITAL FACILITY FEE ¤7,847.76 05/04/2023
SITE PLAN 30 ¤30.00 05/04/2023
WATER- TURN ON ¤25.00 05/04/2023
WATER- TURN ON ¤25.00 05/04/2023
ADJUSTMENT 50% (¤632.75) 05/04/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/04/2023
INSPECTION - RESIDENTIAL ¤962.50 05/04/2023
PLAN REVIEW - RESIDENTIAL ¤273.00 05/04/2023
Fees Total Due: ¤0.00 Total Paid: ¤39,927.15