I want to search for...
Permit #2023040294
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00210-0550 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00210 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 832-726-2202 |
| Location Address: 30 BROOKSIDE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/11/2023 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: ZZMZ CASPIAN LLC |
|
Address 1802 N ALAFAYA TRAIL # 182 ORLANDO, FL 32828 |
| Lot: 0550 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
ALEKSANDRA LUSHI
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
9360 CRAVEN RD JACKSONVILLE, FL 32257 |
APT 401 JACKSONVILLE, FL 32257 |
CAC1820975 (Exp: 08/31/2026) | 904-338-8522 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/22/2024 | FINAL APPROVED | JSTEWART |
| Note: 4/18/2024 - PREVIOUS INSPECTION NOTES 4/18/24- 1. Please install washers and tighten anchors at garage door bucks at header height. per plans. 2. Please seal/cap dryer duct (unless dryer is installed). M1502.4.7 Exhaust duct required.....Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates 3. Please secure and seal base of toilets x 2. P2705.1 – 3…WHERE FIXTURES COME IN CONTACT WITH WALLS AND FLOORS, THE CONTACT AREA MUST BE WATER TIGHT 4. Please seal all shower and tub fixtures.P2705.1 – 3…WHERE FIXTURES COME IN CONTACT WITH WALLS AND FLOORS, THE CONTACT AREA MUST BE WATER TIGHT 5. Please seal Penetration for thermostat wire at AHU equipment and ceiling. R402.4 6. Please Move AHU in Closet for min clearence of equipment and Blocking return register. M1305.1.1 Furnaces and air handlers. Furnaces and air handlers within compartments or alcoves shall have a minimum working space clearance of 3 inches (76 mm) along the sides, back and top with a total width of the enclosing space being not less than 12 inches (305 mm) wider than the furnace or air handler. 7. Please have full set of energy calcs onsite, for equipment listing/installed. R107.3,1DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 4/17/2024 - PREVIOUS INSPECTION NOTES 4/17/24- Doors are locked No lockbox code in notes. unable to complete inspection, Exterior- Please relocate Disconnect at ODU from behind equipment for Min clearence. E3405.2 WORKING SPACE for electric equipment…. / ..NEC 440.14 ...READILY ACCESSIBLE .... | |||
| BLD - BUILDING FINAL | 04/18/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 4/18/24- 1. Please install washers and tighten anchors at garage door bucks at header height. per plans. 2. Please seal/cap dryer duct (unless dryer is installed). M1502.4.7 Exhaust duct required.....Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates 3. Please secure and seal base of toilets x 2. P2705.1 – 3…WHERE FIXTURES COME IN CONTACT WITH WALLS AND FLOORS, THE CONTACT AREA MUST BE WATER TIGHT 4. Please seal all shower and tub fixtures.P2705.1 – 3…WHERE FIXTURES COME IN CONTACT WITH WALLS AND FLOORS, THE CONTACT AREA MUST BE WATER TIGHT 5. Please seal Penetration for thermostat wire at AHU equipment and ceiling. R402.4 6. Please Move AHU in Closet for min clearence of equipment and Blocking return register. M1305.1.1 Furnaces and air handlers. Furnaces and air handlers within compartments or alcoves shall have a minimum working space clearance of 3 inches (76 mm) along the sides, back and top with a total width of the enclosing space being not less than 12 inches (305 mm) wider than the furnace or air handler. 7. Please have full set of energy calcs onsite, for equipment listing/installed. R107.3,1DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 4/17/2024 - PREVIOUS INSPECTION NOTES 4/17/24- Doors are locked No lockbox code in notes. unable to complete inspection, Exterior- Please relocate Disconnect at ODU from behind equipment for Min clearence. E3405.2 WORKING SPACE for electric equipment…. / ..NEC 440.14 ...READILY ACCESSIBLE .... | |||
| BLD - BUILDING FINAL | 04/17/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 4/17/24- Doors are locked No lockbox code in notes. unable to complete inspection, Exterior- Please relocate Disconnect at ODU from behind equipment for Min clearence. E3405.2 WORKING SPACE for electric equipment…. / ..NEC 440.14 ...READILY ACCESSIBLE .... | |||
| ROW - STORMWATER FINAL | 04/17/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/17/24 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 4/16/2024 - PREVIOUS INSPECTION NOTES 4/15/24 YOU WILL NEED TO LEAVE A 4" GAP BETWEEN THE SOD AND ANY FENCES ADJOINING PROPERTY. YOU NEED TO CLEAN OUT CULVERT ENDS. I WILL NOT FEE YOU TODAY AS I WAS ALRADY HERE FOR AN AFTERPOUR INSPECTION. PLEASE MAKE CORRECTIONS. No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/16/2024 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 04/16/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/16/24 PIPE IS GOOD. CUTS MADE. CULVERT HS DIRT. HOT PATCH COMPLETED. APPROVING AS NOTED. | |||
| ROW - STORMWATER FINAL | 04/16/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 4/15/24 YOU WILL NEED TO LEAVE A 4" GAP BETWEEN THE SOD AND ANY FENCES ADJOINING PROPERTY. YOU NEED TO CLEAN OUT CULVERT ENDS. I WILL NOT FEE YOU TODAY AS I WAS ALRADY HERE FOR AN AFTERPOUR INSPECTION. PLEASE MAKE CORRECTIONS. No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/15/2024 | APPROVED | TPOLACEK |
| Note: 04/15/24 FINAL SURVEY HAS BEEN SUBMITTED AND PASSED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ------------------------------------------------------------------------------------------------------------------------ 4/5/2024 - PREVIOUS INSPECTION NOTES ** 04/05/24 BUILDER NEEDS TO SUBMITT A FINAL SURVEY THAT HAS BEEN APPROVED BEFORE A FIELD SURVEY CAN BE RESULTED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/15/2024 | APPROVED | TPOLACEK |
| Note: 04/15/24 new survey indicates pipe is in tolernace. i shot the pipe to confirm and found it is within tolerance. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 4/9/2024 - PREVIOUS INSPECTION NOTES CANCELED PER TEXT MESSAGE AT 9:21AM ------------------------------------------------------------------ 4/1/2024 - PREVIOUS INSPECTION NOTES FINAL SURVEY STATES THAT THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/09/2024 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELED PER TEXT MESSAGE AT 9:21AM ------------------------------------------------------------------ 4/1/2024 - PREVIOUS INSPECTION NOTES FINAL SURVEY STATES THAT THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/05/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/05/24 BUILDER NEEDS TO SUBMITT A FINAL SURVEY THAT HAS BEEN APPROVED BEFORE A FIELD SURVEY CAN BE RESULTED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/01/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: FINAL SURVEY STATES THAT THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) | |||
| U-CROSS CONNECTION | 03/25/2024 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 02/16/2024 | APPROVED | RMARTIN |
| Note: 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24- Previous Note not rectified...Weather Proofs are not safed off (all Exterior outlets). No address visible from the road.....R319.1 2/1/2024 - PREVIOUS INSPECTION NOTES 2/1/24 All conductors in panel need to be safed off with wire nuts or landed on breakers/safety hazard, also Square D panels are only approved for Square D breakers, no other breakers can be used per manufacture spec, also weather proofs are not safed off 9/19/23 Emailed FPL @ 10 :30 AM 9/8/2023 - PREVIOUS INSPECTION NOTES 9/8/23- No main disconnect breaker installed, No Breaker for exterior outlet, Please secure ground to wall, please connect screw nut to bottom of panel from outlet. | |||
| ELECTRIC - EARLY POWER | 02/09/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 2/9/24- Previous Note not rectified...Weather Proofs are not safed off (all Exterior outlets). No address visible from the road.....R319.1 2/1/2024 - PREVIOUS INSPECTION NOTES 2/1/24 All conductors in panel need to be safed off with wire nuts or landed on breakers/safety hazard, also Square D panels are only approved for Square D breakers, no other breakers can be used per manufacture spec, also weather proofs are not safed off 9/19/23 Emailed FPL @ 10 :30 AM 9/8/2023 - PREVIOUS INSPECTION NOTES 9/8/23- No main disconnect breaker installed, No Breaker for exterior outlet, Please secure ground to wall, please connect screw nut to bottom of panel from outlet. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/02/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------- 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 DRIVEWAY AREA ABOVE THE ROW NEEDS A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY STRINGLINE LEFT ACROSS DRIVEWAY 4 INCHES NEEDED ALL THE WAY UP TO GARAGE OPENING. ** MATERIAL NEEDS TO BE REMOVED FROM AROUND CULVERT NEEDS TO BE BURIED ONLY HALF WAY UP AND COMPACTED ** CULVERT ELEVATION GOOD AT THE TIME OF THE INSPECTION | |||
| ELECTRIC - EARLY POWER | 02/01/2024 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: 2/1/24 All conductors in panel need to be safed off with wire nuts or landed on breakers/safety hazard, also Square D panels are only approved for Square D breakers, no other breakers can be used per manufacture spec, also weather proofs are not safed off 9/19/23 Emailed FPL @ 10 :30 AM 9/8/2023 - PREVIOUS INSPECTION NOTES 9/8/23- No main disconnect breaker installed, No Breaker for exterior outlet, Please secure ground to wall, please connect screw nut to bottom of panel from outlet. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/30/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/30/24 DRIVEWAY AREA ABOVE THE ROW NEEDS A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY STRINGLINE LEFT ACROSS DRIVEWAY 4 INCHES NEEDED ALL THE WAY UP TO GARAGE OPENING. ** MATERIAL NEEDS TO BE REMOVED FROM AROUND CULVERT NEEDS TO BE BURIED ONLY HALF WAY UP AND COMPACTED ** CULVERT ELEVATION GOOD AT THE TIME OF THE INSPECTION | |||
| U - SEWER TIE IN | 12/08/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 12/08/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 10/18/2023 | APPROVED | JSTEWART |
| INSULATION | 10/16/2023 | APPROVED | FWILLIS |
| ALL ROUGH | 10/10/2023 | APPROVED | JSTEWART |
| ELECTRIC-TUG | 09/19/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 9/19/23 Emailed FPL @ 10 :30 AM 9/8/2023 - PREVIOUS INSPECTION NOTES 9/8/23- No main disconnect breaker installed, No Breaker for exterior outlet, Please secure ground to wall, please connect screw nut to bottom of panel from outlet. | |||
| ELECTRIC-TUG | 09/08/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 9/8/23- No main disconnect breaker installed, No Breaker for exterior outlet, Please secure ground to wall, please connect screw nut to bottom of panel from outlet. | |||
| ROOF VALLEY & METAL | 08/29/2023 | APPROVED | JSTEWART |
| WALL SHEATHING | 08/15/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/15/2023 | APPROVED | JSTEWART |
| FOUND SURVEY APPROVED (OFFICE) | 08/14/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 07/25/2023 | APPROVED | JSTEWART |
| Note: 7/24/2023 - PREVIOUS INSPECTION NOTES 1. 5 location where dowels are closer then 3/4'' to face of block (5 spots marked with orange paint) 2. 5 locations where grout bed for window sills exceeds 3/8'' (5 spots marked with orange paint) | |||
| TIE BEAM / LINTEL | 07/24/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. 5 location where dowels are closer then 3/4'' to face of block (5 spots marked with orange paint) 2. 5 locations where grout bed for window sills exceeds 3/8'' (5 spots marked with orange paint) | |||
| MONOLITHIC SLAB | 07/13/2023 | APPROVED | JSTEWART |
| Note: 7/12/2023 - PREVIOUS INSPECTION NOTES 7/12/23- No termite Notice posted onsite. | |||
| MONOLITHIC SLAB | 07/12/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 7/12/23- No termite Notice posted onsite. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/10/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/01/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/08/2024 | 04/08/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Termite certificated wrong address. | |||
| MECH | COMPLETE | 10/18/2023 | 10/19/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/12/2023 | 10/13/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition 3. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| ENGIN1 | COMPLETE | 08/14/2023 | 08/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/14/2023 | 08/14/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/01/2023 | 05/08/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/01/2023 | 05/05/2023 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 05/01/2023 | 05/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/01/2023 | 05/01/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes | |||
| MECH | COMPLETE | 04/19/2023 | 04/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/19/2023 | 04/25/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Culvert material and size to be depicted. Typical is 17X13 CMP (L)Citation(s): | |||
| ENGIN1 | COMPLETE | 04/19/2023 | 04/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/19/2023 | 04/20/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/10/2023 | 06/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/06/2023 | 04/07/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/06/2023 | 04/12/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/06/2023 | 04/10/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/06/2023 | 04/10/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/06/2023 | 04/10/2023 |
| LOCATE | COMPLETE | 04/06/2023 | 04/12/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/06/2023 | 04/10/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| SW1 | HOLD | 04/06/2023 | 04/13/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE 10' OFF SETS IN THE IMPROVED LOT TO THE RIGHT SO WE CAN DETERMINE IF DRAINAGE IS NOT IMPACTING | |||
| ZON | COMPLETE | 04/06/2023 | 04/10/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/06/2023 | 04/08/2023 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/25/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/25/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/11/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/11/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 05/11/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 05/11/2023 |
| SEWER CREDIT | (¤1,466.00) | 05/11/2023 |
| SEWER INSPECTION | ¤25.00 | 05/11/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 05/11/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 05/11/2023 |
| SITE PLAN 30 | ¤30.00 | 05/11/2023 |
| WATER- TURN ON | ¤25.00 | 05/11/2023 |
| ADJUSTMENT 50% | (¤366.24) | 05/11/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/11/2023 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 05/11/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 05/11/2023 |
| CONNECTION FEES | ¤1,166.26 | 05/11/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 05/11/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 05/11/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 05/11/2023 |
| IMPACT FEE FIRE | ¤420.52 | 05/11/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/11/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/11/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 05/11/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/11/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 05/11/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/11/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 05/11/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 05/11/2023 |
| SURCHARGE FS 533.721 | ¤2.47 | 05/11/2023 |
| SURCHARGE - FS 468.631 | ¤3.71 | 05/11/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/11/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/11/2023 |
| SW ENG PRE APRON | ¤30.00 | 05/11/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,058.54 |