I want to search for...

Permit #2023040380

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7033-00220-0070
Block: 00220
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 386-503-0666
Location Address: 4 REYBELL LN
Type: DR - DRIVEWAY
Issue Date: 04/26/2023
NOC: Unknown
Applicant name: ANTONIO M PAIVA
Owner: BUTLER HERSCHEL & CATHERINE H&W

Address

4 REYBELL LANE

PALM COAST, FL 32164

Lot: 0070
Contracted Stated Job Value: ¤2,250.00
Job Description: ADD PARTIAL CONCRETE LEFT SIDE DRIVEWAY
Type: CN

Contractor

AVANTI CONCRETE PUMPING INC
Status Location Address Phone Fax
ACTIVE

PO BOX 351743

SATSUMA, FL 32189

386-503-0666 386-586-7687

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 07/07/2023 APPROVED FSLADISH
Note: 07/07/23 POUR LOOKS GOOD. CUTS MADE. LOOKED GOOD AT THE TIME OF THIS INSPECTION.
ROW - FINAL INSPECTION 07/07/2023 APPROVED FSLADISH
Note: 07/07/23 LOOKED GOOD AT THE TIME OF THIS INSPECTION.
U -UTILITY RESIDENTIAL FINAL 07/07/2023 FINAL APPROVED LFITZGERALD
ROW- PRE-APRON (PRE-POUR) 06/29/2023 APPROVED FSLADISH
Note: 06/29/23 READY TO POUR, LOOKED GOOD AT TIME OF INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/10/2023 04/10/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 04/10/2023 04/17/2023
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 04/10/2023 04/10/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤15.00) 04/26/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/26/2023
SW ENG INSPECTION 40 ¤40.00 04/26/2023
SW ENG PRE APRON ¤30.00 04/26/2023
SW ENG RES REVIEW 200 ¤200.00 04/26/2023
SITE PLAN 15 ¤15.00 04/26/2023
Fees Total Due: ¤0.00 Total Paid: ¤300.00