I want to search for...

Permit #2023040448

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1460
CONDITIONED SPACE: 2250 sqft
OPENED PORCH (WITH ROOF) : 88 sqft
GARAGE: 779 sqft
OPENED PORCH (WITH ROOF) : 337 sqft
OPENED PORCH (WITH ROOF) : 239 sqft
CONDITIONED SPACE: 963 sqft
Total Square Footage: 4656 sqft
Block: 00000
Subdivision: -
Job Phone: (386) 446-5850
Location Address: 311 HIBISCUS WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/15/2023
NOC: RECORDED
Applicant name: CHARLES DALLAS RINEK
Owner: SCHMIDGALL TRENT & CARRIE H&W

Address

UNIT 311

ST JOHNS, FL 32259

Address

348 SENTOSA DR

ST JOHNS, FL 32259

Lot: 1460
Contracted Stated Job Value: ¤1,200,000.00
Job Description: Single Family Residence
Type: CN

Contractor

CHARLES RINEK CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 352502

Palm Coast, FL 32137

CGC046080 (Exp: 08/31/2026) (386) 446-5850 (386)445-9992

Sub Contractors

KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007
PHILIP ALAN KENOVICH
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 1470

HOLLY HILL, FL 32117

LG270 (Exp: 08/31/2026) (386)672-2507

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 01/13/2025 APPROVED EMADISON
BLD - BUILDING FINAL 01/10/2025 FINAL APPROVED HCAMACHO
BLD - BUILDING FINAL 01/09/2025 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 01/09/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/09/25 STILL NEED TO REMOVE ALL SEDIMENT THAT ERODED INTO THE POND WHILE THE PROPERTY WAS UNDER CONSTRUCTION THE MATERIAL EXTENDS APPROXIMATELY 4-5 FT INTO THE POND ** NEED TO PUT YOUR POP-UP DRAINS ONTO OF THE SOD TO PREVENT FUTURE EROSION OF THE SOIL FROM UNDERNEATH THE SOD ___________________________________________________________________________________________________________________ 1/7/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK ---------------------------------------------------------------------- 1/6/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK -------------------------------------------------------------------------------------- **NOTE TO INSPECTOR BUILDER IS REQUIRED TO REMOVE ALL SEDIMENT FROM WATER WAY PRIOR TO THE ROW STORMWATER FINAL BEING APPROVED
ROW - STORMWATER FINAL 01/07/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK ---------------------------------------------------------------------- 1/6/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK -------------------------------------------------------------------------------------- **NOTE TO INSPECTOR BUILDER IS REQUIRED TO REMOVE ALL SEDIMENT FROM WATER WAY PRIOR TO THE ROW STORMWATER FINAL BEING APPROVED
ROW - STORMWATER FINAL 01/06/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO DO THE FOLLOWING 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK -------------------------------------------------------------------------------------- **NOTE TO INSPECTOR BUILDER IS REQUIRED TO REMOVE ALL SEDIMENT FROM WATER WAY PRIOR TO THE ROW STORMWATER FINAL BEING APPROVED
ROW - FINAL APRON (AFTER POUR) 01/06/2025 APPROVED PFLANAGAN
Note: 12/31/2024 - PREVIOUS INSPECTION NOTES ALL PAVERS ALONG NEED TO ATTACHED TO THE PAVER RESTRAINT FOOTERS SO PAVERS DON'T BUCKLE UNDER HEAVY LOADS.
ROW - FINAL APRON (AFTER POUR) 12/31/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: ALL PAVERS ALONG NEED TO ATTACHED TO THE PAVER RESTRAINT FOOTERS SO PAVERS DON'T BUCKLE UNDER HEAVY LOADS.
ROW - STORMWATER FINAL 12/31/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO REMOVE ALL SEDIMENT IN POND IN THE BACK 2) NEED TO FIX ALL WASHOUTS AT THE BOTTOM OF BANK -------------------------------------------------------------------------------------- **NOTE TO INSPECTOR BUILDER IS REQUIRED TO REMOVE ALL SEDIMENT FROM WATER WAY PRIOR TO THE ROW STORMWATER FINAL BEING APPROVED
U -UTILITY RESIDENTIAL FINAL 12/31/2024 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/26/2024 APPROVED PFLANAGAN
Note: 12/16/2024 - PREVIOUS INSPECTION NOTES ** 12/16/24 BUILDER NEEDS TO PROVIDE INFORMATION OFTHE ADJACENT PROPERTIES ON THE RIGHT AND LEFT ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** NEED MORE ELEVATION SHOTS IN REAR ALSO NEED TO MAKE SURE THAT ALL SHOTS ARE LEGIBLE ** NEED TO ALSO PROVIDE THE FFE OF YOUR POOL DECK
ROW FIELD SURVEY /GRADING CERTIFICATION 12/26/2024 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/16/2024 Disapproved - NO FEE EMADISON
Note: ** 12/16/24 BUILDER NEEDS TO PROVIDE INFORMATION OFTHE ADJACENT PROPERTIES ON THE RIGHT AND LEFT ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** NEED MORE ELEVATION SHOTS IN REAR ALSO NEED TO MAKE SURE THAT ALL SHOTS ARE LEGIBLE ** NEED TO ALSO PROVIDE THE FFE OF YOUR POOL DECK
ROW- PRE-APRON (PRE-POUR) 10/18/2024 APPROVED - AS NOTED EMADISON
Note: ** 10/18/24 READY TO SET PAVERS _____________________________________________________________________________________________________________ 9/18/2024 - PREVIOUS INSPECTION NOTES ** 09/18/24 READY TO OUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 09/18/2024 APPROVED EMADISON
Note: ** 09/18/24 READY TO POUR PAVER RESTRAINTS AND APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW- PRE-APRON (PRE-POUR) 09/18/2024 PARTIALLY APPROVED EMADISON
Note: ** 09/18/24 READY TO OUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
WINDOW NAILING 06/05/2024 APPROVED JWALKER
Note: 2/12/24- for exterior doors, not installed at All rough.
ELECTRIC - EARLY POWER 05/17/2024 APPROVED JSTEWART
GRAVITY SEWER TEST 04/01/2024 APPROVED MGIBSON
U-CROSS CONNECTION 03/28/2024 APPROVED DHANEY
U - SEWER TIE IN 03/28/2024 APPROVED - AS NOTED MGIBSON
Note: CONTRACTOR TO SCHEDUAL GRAVITY SEWER ON 4/1/24 BOTH U-SEWER AND GRAVITY SEWER ARE APPROVED
INSULATION 03/08/2024 APPROVED JSTEWART
LATH/BRICK/ WATER BARRIER 03/04/2024 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 2/12/24- disreguard previous Note Product approval is right. Adding a window Nailing Inspection for exterior doors not installed. Please block the openings before Insulation.
EXTERIOR STRAP/CLIP 03/04/2024 CANCELLED BY INSPECTOR AGAETANO
Note: Inspector Notes from Inspection 2420 2/12/24- disreguard previous Note Product approval is right. Adding a window Nailing Inspection for exterior doors not installed. Please block the openings before Insulation. 03-04-2024Contractor was requesting a soffit inspection.
ALL ROUGH 02/12/2024 APPROVED - AS NOTED JSTEWART
Note: 2/12/24- disreguard previous Note Product approval is right. Adding a window Nailing Inspection for exterior doors not installed. Please block the openings before Insulation.
ROOF VALLEY & METAL 01/18/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2460 12/7/2023 - PREVIOUS INSPECTION NOTES 12/7/23 - SECOND STORY BALCONY POST AND HEADER COVERED. I DID NOT FIND ANY NOTES SHOWING BALCONY WAS INSPECTED. TRUSS BRACES NOT INSPECTED. Inspector Notes from Inspection 2460 12-01-2023 Roof sheathing only approved. Left side of valley missed fasteners. Framer on site and will address ASAP. Framer indicates he is not ready for tie down inspection. 12-19-2023 1. A3 Stair platform detail indicates knee wall at all stair runs. Knee wall not installed at entry stair. 2. Tie downs, anchors, and engineering was previously inspected at by Forest. 3. Balcony header was previously inspected and approved at wall sheathing. 4. Garage truss engineering needed to be inspected. Approved. Check stair knee wall at all rough.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/19/2023 APPROVED - AS NOTED AGAETANO
Note: 12/7/2023 - PREVIOUS INSPECTION NOTES 12/7/23 - SECOND STORY BALCONY POST AND HEADER COVERED. I DID NOT FIND ANY NOTES SHOWING BALCONY WAS INSPECTED. TRUSS BRACES NOT INSPECTED. Inspector Notes from Inspection 2460 12-01-2023 Roof sheathing only approved. Left side of valley missed fasteners. Framer on site and will address ASAP. Framer indicates he is not ready for tie down inspection. 12-19-2023 1. A3 Stair platform detail indicates knee wall at all stair runs. Knee wall not installed at entry stair. 2. Tie downs, anchors, and engineering was previously inspected at by Forest. 3. Balcony header was previously inspected and approved at wall sheathing. 4. Garage truss engineering needed to be inspected. Approved. Check stair knee wall at all rough.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/07/2023 Disapproved - NO FEE FWILLIS
Note: 12/7/23 - SECOND STORY BALCONY POST AND HEADER COVERED. I DID NOT FIND ANY NOTES SHOWING BALCONY WAS INSPECTED. TRUSS BRACES NOT INSPECTED. Inspector Notes from Inspection 2460 12-01-2023 Roof sheathing only approved. Left side of valley missed fasteners. Framer on site and will address ASAP. Framer indicates he is not ready for tie down inspection.
WALL SHEATHING 12/01/2023 APPROVED - AS NOTED AGAETANO
Note: 12-01-2023 Missed fasteners right side of second floor. Frtamer on site and will address ASAP.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/01/2023 APPROVED - AS NOTED AGAETANO
Note: 12-01-2023 Roof sheathing only approved. Left side of valley missed fasteners. Framer on site and will address ASAP. Framer indicates he is not ready for tie down inspection.
FOUND SURVEY APPROVED (OFFICE) 11/30/2023 APPROVED TBAKER
ELECTRIC-TUG 10/25/2023 APPROVED AGAETANO
ROW - DRAINAGE 10/18/2023 APPROVED - AS NOTED EMADISON
Note: ** 10/18/23 CORRECTIONS MADE BUILDER WILL STILL BE RTEQUIRED TO REMOVE SEDIMENT FROM WATER WAY BEFORE THE STORMWATER FINAL IS APPROVED ** IT IS ALSO THE BUILDERS RESPONSIBILITY TO MAINTAIN EROSION CONTROL OF THE JOB SITE _____________________________________________________________________________________________________________________ 10/17/2023 - PREVIOUS INSPECTION NOTES ** 10/17/23 WORKERS ON SITE MAKING REPAIRS AS INDICATED IN PREVIOUS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/18/23 _________________________________________________________________________________________________________________ 10/16/2023 - PREVIOUS INSPECTION NOTES ** 10/16/23 NO CORRECTIONS MADE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/17/23 ______________________________________________________________________________________________________________________ 10/13/2023 - PREVIOUS INSPECTION NOTES ** 10/13/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/16/23 10/12/2023 - PREVIOUS INSPECTION NOTES ** 10/12/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/13/23 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 NO CORRECTIONS HAVE BEEN MADE TO SITE ** BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** FOLLOW UP INSPECTION 10/12/23 _______________________________________________________________________________________________________________________ ** 10/09/23 BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** SEE PHOTOS FROM TOAYS DATE ** FOLLOW UP INSPECTION 10/11/23 Inspector Notes from Inspection 9470 ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 10/17/2023 PARTIALLY APPROVED EMADISON
Note: ** 10/17/23 WORKERS ON SITE MAKING REPAIRS AS INDICATED IN PREVIOUS INSPECTIONS ** FOLLOW UP INSPECTION ON 10/18/23 _________________________________________________________________________________________________________________ 10/16/2023 - PREVIOUS INSPECTION NOTES ** 10/16/23 NO CORRECTIONS MADE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/17/23 ______________________________________________________________________________________________________________________ 10/13/2023 - PREVIOUS INSPECTION NOTES ** 10/13/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/16/23 10/12/2023 - PREVIOUS INSPECTION NOTES ** 10/12/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/13/23 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 NO CORRECTIONS HAVE BEEN MADE TO SITE ** BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** FOLLOW UP INSPECTION 10/12/23 _______________________________________________________________________________________________________________________ ** 10/09/23 BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** SEE PHOTOS FROM TOAYS DATE ** FOLLOW UP INSPECTION 10/11/23 Inspector Notes from Inspection 9470 ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 10/16/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/16/23 NO CORRECTIONS MADE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/17/23 ______________________________________________________________________________________________________________________ 10/13/2023 - PREVIOUS INSPECTION NOTES ** 10/13/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/16/23 10/12/2023 - PREVIOUS INSPECTION NOTES ** 10/12/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/13/23 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 NO CORRECTIONS HAVE BEEN MADE TO SITE ** BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** FOLLOW UP INSPECTION 10/12/23 _______________________________________________________________________________________________________________________ ** 10/09/23 BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** SEE PHOTOS FROM TOAYS DATE ** FOLLOW UP INSPECTION 10/11/23 Inspector Notes from Inspection 9470 ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 10/13/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/13/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/16/23 10/12/2023 - PREVIOUS INSPECTION NOTES ** 10/12/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/13/23 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 NO CORRECTIONS HAVE BEEN MADE TO SITE ** BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** FOLLOW UP INSPECTION 10/12/23 _______________________________________________________________________________________________________________________ ** 10/09/23 BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** SEE PHOTOS FROM TOAYS DATE ** FOLLOW UP INSPECTION 10/11/23 Inspector Notes from Inspection 9470 ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 10/12/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/12/23 ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 313 HIBISCUS ** UNDERMINING OF YOUR STRUCTURE FROM RIGHT SIDE ** SILT FENCE FAILING IN REAR AT THE TIME OF INSPECTION ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ( ROADWAY WHERE NO CORRECTIONS WERE MADE ) ** FOLLOW UP INSPECTION 10/13/23 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 NO CORRECTIONS HAVE BEEN MADE TO SITE ** BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** FOLLOW UP INSPECTION 10/12/23 _______________________________________________________________________________________________________________________ ** 10/09/23 BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** SEE PHOTOS FROM TOAYS DATE ** FOLLOW UP INSPECTION 10/11/23 Inspector Notes from Inspection 9470 ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 10/11/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/11/23 NO CORRECTIONS HAVE BEEN MADE TO SITE ** BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** FOLLOW UP INSPECTION 10/12/23 _______________________________________________________________________________________________________________________ ** 10/09/23 BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** SEE PHOTOS FROM TOAYS DATE ** FOLLOW UP INSPECTION 10/11/23 Inspector Notes from Inspection 9470 ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 10/09/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/09/23 BUILDER NEEDS TO TAKE IMMEDIATE ACTION TO CORRECT SERIOUS EROSIN ON HIS SITE ** LEFT SIDE NEGATIVE IMPACT ERODING AND UNDERMINING ADJACENT PROPERTY 13 HIBISCUS ** UNDERMINING STRUCTURE BOTH FROM RIGHT SIDE AND IN REAR ** SILT FENCE FAILING AROUND ENTIRE SITE NEED TO RE-ESTABLISH SILT FENCE OF ENTIRE SITE ** EROSION NEGATIVELY IMPACTING WATER WAY AS WELL AS ROAD WAY ** SEE PHOTOS FROM TOAYS DATE ** FOLLOW UP INSPECTION 10/11/23 Inspector Notes from Inspection 9470 ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 09/15/2023 APPROVED - AS NOTED EMADISON
Note: ** 09/15/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBLITY TO MAINTAIN THE DRAINAGE OF YOUR CONSTRUCTION SITE TO PREVENT NEGATIVE IMPACTS OF ADJACENT LOTS AND THE WATER WAY (POND) AND ROADWAY _______________________________________________________________________________________________________________________ 9/14/2023 - PREVIOUS INSPECTION NOTES ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 09/14/2023 PARTIALLY APPROVED EMADISON
Note: ** 09/14/23 WORKERS ON SITE IN PROCESS OF INSTALLING SILT FENCE IN REAR HE INDICATED THEY ARE IN THE PROCESS OF INSTALLING 3 ROWS OF SILT FENCE ACROSS REAR OF PROPERTY. **FOLLOW UP INSPECTION ON 09/15 TO ENSURE WORK HAS BEN COMPLETED ________________________________________________________________________________________________________________________ 9/13/2023 - PREVIOUS INSPECTION NOTES ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION __________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 09/13/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION ** 09/13/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/14/23 DUE TO THE SEVERITY OF THE EROSION ________________________________________________________________________________________________________________________ 9/12/2023 - PREVIOUS INSPECTION NOTES ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED IMMEDIATELY ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
ROW - DRAINAGE 09/12/2023 Disapproved - NO FEE EMADISON
Note: ** 09/12/23 SEVERE EROSION ALONG YOUR LEFT SIDE PROPERTY LINE WHICH MAY HAVE A NEGATIVE IMPACT UPON THE ADJACENT PROPERTY 313 HIBISCUS WAY IMMEDIATE ATTENTION IS REQUIRED OR A STOP WORK ORDER WILL BE PLACED UPON YOUR JOB SITE. **SEVERE EROSION OF YOUR JOB SITE WHICH IS NEGATIVELY IMPACTING THE WATER WAY (POND) LARGE AMOUNTS OF SEDIMENT HAS ERODED INTO IT WHICH WILL NEED TO BE REMOVED BEFORE YOUR ROW STORMWATER FINAL IS APPROVED ** ALSO NEED TO REINSTALL SILT FENCE ACROSS REAR OF PROPERTY REQUIRING A SECOND SILT FENCE 5 FT AWAY TO AID IN THE EROSION CONTROL ** NEED TO CLEAN SEDIMENT THAT HAS ERODED INTO THE ROADWAY WHICHIS A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS AND MOTORIST. ** SEE ATTACHED PHOTOS MADE (2) ATTEMPTS TO CALL BUILDER LEFT MESSAGES BOTH TIMES ** FOLLOW UP INSPECTION ON 09/13/23 DUE TO THE SEVERITY OF THE EROSION
TIE BEAM / LINTEL 08/25/2023 Disapproved - NO FEE AGAETANO
Note: 08-25-2023 Dowel missed. Noted on drawings.
TIE BEAM / LINTEL 08/25/2023 APPROVED AGAETANO
Note: 8/25/2023 - PREVIOUS INSPECTION NOTES 08-25-2023 Dowel missed. Noted on drawings. 08-25-2023 Dowel now visible.
WATER METER INSTALLATION REQUEST 07/25/2023 APPROVED CBOWERMASTER
MONOLITHIC SLAB 07/24/2023 APPROVED AGAETANO
Note: 7/20/2023 - PREVIOUS INSPECTION NOTES 7/17/2023 - PREVIOUS INSPECTION NOTES 07-17-2023 1. AH line not per code. P2603.4 Pipes through foundation walls. A pipe that passes through a foundation wall shall be provided with a relieving arch, or a pipe sleeve shall be built into the foundation wall. The sleeve shall be two pipe sizes greater than the pipe passing through the wall. 2. Termite bond not posted. 07-20-2023 AHU line cannot be in bearing wall footing as noted aerlier. Drawings indicate AHU line not in footing.
MONOLITHIC SLAB 07/20/2023 Disapproved - NO FEE AGAETANO
Note: 7/17/2023 - PREVIOUS INSPECTION NOTES 07-17-2023 1. AH line not per code. P2603.4 Pipes through foundation walls. A pipe that passes through a foundation wall shall be provided with a relieving arch, or a pipe sleeve shall be built into the foundation wall. The sleeve shall be two pipe sizes greater than the pipe passing through the wall. 2. Termite bond not posted. 07-20-2023 AHU line cannot be in bearing wall footing as noted aerlier. Drawings indicate AHU line not in footing.
MONOLITHIC SLAB 07/17/2023 Disapproved - NO FEE AGAETANO
Note: 07-17-2023 1. AH line not per code. P2603.4 Pipes through foundation walls. A pipe that passes through a foundation wall shall be provided with a relieving arch, or a pipe sleeve shall be built into the foundation wall. The sleeve shall be two pipe sizes greater than the pipe passing through the wall. 2. Termite bond not posted. 3. Inrterior bearing indicates three #5.
PLUMBING 1ST ROUGH UNDERGROUND 07/12/2023 APPROVED MGIBSON

Review History

Department Status Date In Date Out
MECH COMPLETE 01/03/2025 01/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/30/2024 01/03/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 07/18/2024 07/18/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator Revisions and corrections should follow the same criteria and should use the same name as the original originally identified. (no – new, revised, second submittal, updated)
BADMIN INFORMATION 07/18/2024 07/18/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please include the rerecording stamp from the clerks office. Your cover page is requesting it, but nothing indicates it being rerecorded.
BLD COMPLETE 12/19/2023 12/22/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/29/2023 11/30/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/29/2023 11/29/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 09/13/2023 09/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 09/11/2023 09/12/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/09/2023 06/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/09/2023 06/14/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ELEC COMPLETE 05/08/2023 05/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 05/01/2023 05/01/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 05/01/2023 05/08/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/01/2023 05/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ELEC HOLD 05/01/2023 05/01/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electric load calcs do not match the living space. Your living space is 3213 which you can locate on the floor plan.
MECH COMPLETE 05/01/2023 05/01/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
GAS COMPLETE 05/01/2023 05/01/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
URB COMPLETE 04/13/2023 04/14/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 -
BLD COMPLETE 04/10/2023 04/12/2023
Note: Released By: JPI
CUSVC COMPLETE 04/10/2023 04/14/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC HOLD 04/10/2023 04/11/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs. 2. Need outlet on the front of the house. NEC 2017 210.52 (E) (1) 3. Need outlet on the second floor balcony. NEC 2017 210.52 (E) (3)
ENGIN1 COMPLETE 04/10/2023 04/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS HOLD 04/10/2023 04/11/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide pipe material, size and length for all piping on gas riser diagram. Need lines going to appliances and line across house.
LOCATE COMPLETE 04/10/2023 04/12/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 04/10/2023 04/11/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs are missing heatload and manual D. Provide complete file. 2. Square footage on Energy calcs does not match the plans 3. Provide duct layout signed by AC contractor
SW1 HOLD 04/10/2023 04/17/2023
Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM NEED TO INDICATE IF ADJACENT LOTS ARE VACANT OR IMPROVED
ZON HOLD 04/10/2023 04/13/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Please include the width of driveway and walkway. Also please include the setback of the driveway to demonstrate it meets the minimum requried 5' setback from side property line. Please add the propane tank location on site plan and its' setbacks Color sheet: sheet provided was cut off at the bottom half please resubmit.
BADMIN COMPLETE 04/10/2023 04/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 01/13/2025
SW ENG REINSPECTION 20 ¤20.00 01/13/2025
SW ENG REINSPECTION 20 ¤20.00 01/13/2025
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG - INSPECTION 20 ¤20.00 12/09/2024
SW ENG INSPECTION 80 ¤80.00 05/15/2023
SW ENG PRE APRON ¤30.00 05/15/2023
SW ENG - REVIEW 20 ¤20.00 05/15/2023
SW ENG RES REVIEW 200 ¤200.00 05/15/2023
TRANS IMPACT FEE ADMIN ¤99.33 05/15/2023
TRANS IMPACT FEE ADMIN (¤99.33) 05/15/2023
SITE PLAN 30 ¤30.00 05/15/2023
WATER-METER ¤505.39 05/15/2023
ADJUSTMENT 50% (¤2,133.00) 05/15/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/15/2023
INSPECTION - RESIDENTIAL ¤3,300.00 05/15/2023
PLAN REVIEW - RESIDENTIAL ¤936.00 05/15/2023
CONNECTION FEES ¤25.00 05/15/2023
FIRE IMPACT FEE ADMIN ¤12.62 05/15/2023
FIRE IMPACT FEE ADMIN (¤12.62) 05/15/2023
FC IMPACT FEE EMS ¤62.00 05/15/2023
IMPACT FEE FIRE ¤420.52 05/15/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/15/2023
FC IMPACT FEE LIBRARY ¤268.00 05/15/2023
IMPACT FEE PARKS ¤1,769.15 05/15/2023
IMPACT FEE SCHOOL ¤5,450.00 05/15/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 05/15/2023
PARKS IMPACT FEE ADMIN ¤53.07 05/15/2023
PARKS IMPACT FEE ADMIN (¤53.07) 05/15/2023
SURCHARGE FS 533.721 ¤12.58 05/15/2023
SURCHARGE - FS 468.631 ¤18.88 05/15/2023
SW ENG - FOUNDATION SURVEY ¤20.00 05/15/2023
Fees Total Due: ¤0.00 Total Paid: ¤14,853.52