Permit #2023040519
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00050-0050 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00050 |
| Subdivision: 2214 - SECTION 19-WYNNFIELD |
| Job Phone: 832-726-2202 |
| Location Address: 2 WAVRA PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/09/2023 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN INVESTMENTS 1 LLC |
|
Address 1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ALEKSANDRA LUSHI
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
9360 CRAVEN RD JACKSONVILLE, FL 32257 |
APT 401 JACKSONVILLE, FL 32257 |
CAC1820975 (Exp: 08/31/2026) | 904-338-8522 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/05/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 01/04/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. No insulation in attic 2. Liquid tight connector not installed properly @ ODU 3. Lani requires a switched light 4. SGD anchors are required to be fully embedded 5. Garage door buck anchors have been cut off and require new wedge anchors and 2'' washers per plans 6. Above door bell transformer in garage needs to be sealed (low voltage wires) 7. Exhaust fan duct trim needs to be secured properly @ soffit | |||
| U -UTILITY RESIDENTIAL FINAL | 01/04/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 has potable irr with PVB installed-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/03/2024 | APPROVED | TPOLACEK |
| Note: 01/03/24 CORRECTIONS HAVE BEEN MADE TO SURVEY. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 12/27/2023 - PREVIOUS INSPECTION NOTES 12/27/23 THERE HAS BEEN NO CORRECTIONS MADE. SEE PRVIOUS NOTES AND MAKE CORRECTIONS BEFORE SUBMITTING FOR ANOTHER FINAL SURVEY INSPECTION. ___________________________________________________________________________________________________________________ 12/22/2023 - PREVIOUS INSPECTION NOTES 12/22/23 SWALE PLAN INDICATES A RIGHT TO LEFT FLOW. FINAL SURVEY IS FLAT ON RIGHT SIDE AND PITCHED UPWARD IN FRONT OF PROPERTY. THIS WILL NOT WORK ACCORDING TO THE SWALE PLAN. I ALSO WILL NOTE THAT THE CULVERT PIPE HAS DEBRIS AND AFTERPOUR IN BOTH ENDS THAT WILL NEED TO CLEANED BEFORE AFTER POUR INSPECTION. PLEASE MAKE CORRECTIONS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/03/2024 | APPROVED | TPOLACEK |
| Note: 01/03/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 12/28/2023 - PREVIOUS INSPECTION NOTES 12/2823 PREVIOUS INSPECTION NOTES THIS INSPECTION CAN NOT BE COMPLETED UNTIL THE FINAL SURVEY PASSES. YOU MUST FIRST SUBMIT AND PASS A FINAL SURVEY INSPECTION BEFORE YOU CAN SCHEDULE A FIELD SURVEY. __________________________________________________________________________________________________________________________ 12/22/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION CAN NOT BE COMPLETED UNTIL THE FINAL SURVEY PASSES. | |||
| ROW - STORMWATER FINAL | 01/03/2024 | APPROVED | TPOLACEK |
| Note: 01/03/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/03/2024 | APPROVED | TPOLACEK |
| Note: 01/03/24 PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/28/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 12/2823 PREVIOUS INSPECTION NOTES THIS INSPECTION CAN NOT BE COMPLETED UNTIL THE FINAL SURVEY PASSES. YOU MUST FIRST SUBMIT AND PASS A FINAL SURVEY INSPECTION BEFORE YOU CAN SCHEDULE A FIELD SURVEY. __________________________________________________________________________________________________________________________ 12/22/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION CAN NOT BE COMPLETED UNTIL THE FINAL SURVEY PASSES. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/27/2023 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 12/27/23 THERE HAS BEEN NO CORRECTIONS MADE. SEE PRVIOUS NOTES AND MAKE CORRECTIONS BEFORE SUBMITTING FOR ANOTHER FINAL SURVEY INSPECTION. ___________________________________________________________________________________________________________________ 12/22/2023 - PREVIOUS INSPECTION NOTES 12/22/23 SWALE PLAN INDICATES A RIGHT TO LEFT FLOW. FINAL SURVEY IS FLAT ON RIGHT SIDE AND PITCHED UPWARD IN FRONT OF PROPERTY. THIS WILL NOT WORK ACCORDING TO THE SWALE PLAN. I ALSO WILL NOTE THAT THE CULVERT PIPE HAS DEBRIS AND AFTERPOUR IN BOTH ENDS THAT WILL NEED TO CLEANED BEFORE AFTER POUR INSPECTION. PLEASE MAKE CORRECTIONS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/22/2023 | Disapproved - NO FEE | TPOLACEK |
| Note: THIS INSPECTION CAN NOT BE COMPLETED UNTIL THE FINAL SURVEY PASSES. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/22/2023 | Disapproved - NO FEE | TPOLACEK |
| Note: 12/22/23 SWALE PLAN INDICATES A RIGHT TO LEFT FLOW. FINAL SURVEY IS FLAT ON RIGHT SIDE AND PITCHED UPWARD IN FRONT OF PROPERTY. THIS WILL NOT WORK ACCORDING TO THE SWALE PLAN. I ALSO WILL NOTE THAT THE CULVERT PIPE HAS DEBRIS AND AFTERPOUR IN BOTH ENDS THAT WILL NEED TO CLEANED BEFORE AFTER POUR INSPECTION. PLEASE MAKE CORRECTIONS. | |||
| U-CROSS CONNECTION | 12/15/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irr with PVB installed-no cross connection | |||
| ELECTRIC - EARLY POWER | 12/15/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1018. Release Power Inspector Notes from Inspection 2200 Emailed FPL @ 11 AM | |||
| ROW- PRE-APRON (PRE-POUR) | 11/07/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARTS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U - SEWER TIE IN | 10/27/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 10/27/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 10/23/2023 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 10/19/2023 | APPROVED | FWILLIS |
| ALL ROUGH | 10/17/2023 | APPROVED | MKRASKI |
| ELECTRIC-TUG | 10/16/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 11 AM | |||
| ALL ROUGH | 10/13/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/13/23: ** Kitchen area requires 9" duct supply but 8" is installed. Marked on new Energy Calcs. 10/10/2023 - PREVIOUS INSPECTION NOTES 1. Exhaust fan ducts must be supported a min. of every 4' 2. Duct layout does not match what was installed, revision is required or make duct work match layout 3. Mullbar bracket missing at top of double window in front bedroom 4. Same window as before it missing anchors 5. Smoke detectors can not be within 3' of supplys Front bedroom | |||
| ALL ROUGH | 10/10/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Exhaust fan ducts must be supported a min. of every 4' 2. Duct layout does not match what was installed, revision is required or make duct work match layout 3. Mullbar bracket missing at top of double window in front bedroom 4. Same window as before it missing anchors 5. Smoke detectors can not be within 3' of supplys Front bedroom | |||
| ALL ROUGH | 10/06/2023 | CANCELLED BY APPLICANT | MKRASKI |
| ALL ROUGH | 10/04/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 09/06/2023 | FINAL APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/05/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 9/5/23 1. Truss T19 missing engineering Check on next inspection 9/1/2023 - PREVIOUS INSPECTION NOTES 1. Wrong hold down was used on load bearing wall 4x4 plans call for a Simpson LTT19 2. Load bearing wall mid blocking is required at 1/3 and 2/3 up the wall per plans 3. 2 full king studs are required for load bearing door opening per plans 4. Over framing missing 2x4 collar ties per plans 5. Over framing missing Simpson H2.5s 6. Can not see strap on Truss T22 @ front entry Stopped inspection did not check truss engineering | |||
| WALL SHEATHING | 09/01/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/01/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Wrong hold down was used on load bearing wall 4x4 plans call for a Simpson LTT19 2. Load bearing wall mid blocking is required at 1/3 and 2/3 up the wall per plans 3. 2 full king studs are required for load bearing door opening per plans 4. Over framing missing 2x4 collar ties per plans 5. Over framing missing Simpson H2.5s 6. Can not see strap on Truss T22 @ front entry Stopped inspection did not check truss engineering | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/31/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/08/2023 | APPROVED | MKRASKI |
| Note: 8/4/2023 - PREVIOUS INSPECTION NOTES 8/4/23 Dowels were set AGAIN the same way as previous, per Cheif Building Inspector contractor will need to meet inspector on site and watch them drill and epoxy dowels to make sure they are per detail 8/3/2023 - PREVIOUS INSPECTION NOTES STOPPED INSPECTION. Missed dowels are to be embeded a min of 5'' per detail, dowels were only a max of 1'' embeded, stopped inspection | |||
| TIE BEAM / LINTEL | 08/04/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 8/4/23 Dowels were set AGAIN the same way as previous, per Cheif Building Inspector contractor will need to meet inspector on site and watch them drill and epoxy dowels to make sure they are per detail 8/3/2023 - PREVIOUS INSPECTION NOTES STOPPED INSPECTION. Missed dowels are to be embeded a min of 5'' per detail, dowels were only a max of 1'' embeded, stopped inspection | |||
| TIE BEAM / LINTEL | 08/03/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: STOPPED INSPECTION. Missed dowels are to be embeded a min of 5'' per detail, dowels were only a max of 1'' embeded, stopped inspection | |||
| MONOLITHIC SLAB | 07/25/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/19/2023 | APPROVED | MKRASKI |
| WATER METER INSTALLATION REQUEST | 07/06/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/15/2023 | 11/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/30/2023 | 10/30/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/30/2023 | 11/13/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/30/2023 | 10/30/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide rear setback from patio being added to property line | |||
| BLD | COMPLETE | 10/25/2023 | 10/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/11/2023 | 10/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/31/2023 | 08/31/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/31/2023 | 08/31/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/19/2023 | 04/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/19/2023 | 04/19/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/19/2023 | 04/19/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/19/2023 | 04/25/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/19/2023 | 06/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/11/2023 | 04/12/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/11/2023 | 04/17/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/11/2023 | 04/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 04/11/2023 | 04/12/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey. | |||
| GAS | CANCEL | 04/11/2023 | 04/12/2023 |
| LOCATE | COMPLETE | 04/11/2023 | 04/12/2023 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/11/2023 | 04/12/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Manual J and Manual S of heatload say 2.5 ton system. Equipment models are for 3 ton. Revise 2.Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| SW1 | COMPLETE | 04/11/2023 | 04/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/11/2023 | 04/12/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Window on right side facing street must have banding |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/05/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/05/2024 |
| CONNECTION FEES | ¤1,166.26 | 05/09/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 05/09/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 05/09/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 05/09/2023 |
| IMPACT FEE FIRE | ¤420.52 | 05/09/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/09/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/09/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 05/09/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/09/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 05/09/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/09/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 05/09/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 05/09/2023 |
| SURCHARGE FS 533.721 | ¤2.47 | 05/09/2023 |
| SURCHARGE - FS 468.631 | ¤3.71 | 05/09/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/09/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/09/2023 |
| SW ENG PRE APRON | ¤30.00 | 05/09/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/09/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/09/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 05/09/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 05/09/2023 |
| SEWER CREDIT | (¤1,342.00) | 05/09/2023 |
| SEWER INSPECTION | ¤25.00 | 05/09/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 05/09/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 05/09/2023 |
| SITE PLAN 30 | ¤30.00 | 05/09/2023 |
| WATER- TURN ON | ¤25.00 | 05/09/2023 |
| ADJUSTMENT 50% | (¤366.24) | 05/09/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/09/2023 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 05/09/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 05/09/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,185.04 |