Permit #2023040707
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00090-0230 |
| CONDITIONED SPACE: 2712 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| PATIO/DECK (NO ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00090 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 407-808-8155 |
| Location Address: 122 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/06/2023 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
NICHOLAS KEITH REX
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1408 HAMLIN UNIT B SAINT CLOUD, FL 34771 |
EC13006779 (Exp: 08/31/2026) | 407-873-2231 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/08/2024 | FINAL APPROVED | BTAYLOR |
| Note: 5/7/2024 - PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 05/08/2024 | FINAL APPROVED | LFITZGERALD |
| Note: 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/7/2024 10:43:36 AM *** fire hydrant valve inaccessible-concrete around rim of valve lid-make accessible and check that no soils are built up inside valve jacket-need to be able to open/close withvalve wrench on operating nut Inspector Notes from Inspection 9035 reclaim irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/07/2024 | Disapproved - NO FEE | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/7/2024 10:43:36 AM *** fire hydrant valve inaccessible-concrete around rim of valve lid-make accessible and check that no soils are built up inside valve jacket-need to be able to open/close withvalve wrench on operating nut Inspector Notes from Inspection 9035 reclaim irrigation-no cross connection | |||
| BLD - BUILDING FINAL | 05/07/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/26/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9271 4/1/24 WAS LEFT OFF THE INITIAL PARTIAL APPROVAL. . Inspector Notes from Inspection 9270 4/1/24 YOU ARE READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _____________________________________________________________________________________________________________________ 3/20/2024 - PREVIOUS INSPECTION NOTES AT THE TIME OF THE INSPECTION READY TO POUR APRON, SIDEWALK & PAVER RESTRAINTS ONLY , IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/26/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/26/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 4/26/24 NO CONCRETE OR PAVER DAMAGE OBSERVED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 4/26/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U-CROSS CONNECTION | 04/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 04/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/26/24 NO CONCRETE OR PAVER DAMAGE OBSERVED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 4/26/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/1/24 YOU ARE READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _____________________________________________________________________________________________________________________ 3/20/2024 - PREVIOUS INSPECTION NOTES AT THE TIME OF THE INSPECTION READY TO POUR APRON, SIDEWALK & PAVER RESTRAINTS ONLY , IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. | |||
| ROW- PAVER RESTRAINTS | 04/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/1/24 WAS LEFT OFF THE INITIAL PARTIAL APPROVAL. . Inspector Notes from Inspection 9270 4/1/24 YOU ARE READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _____________________________________________________________________________________________________________________ 3/20/2024 - PREVIOUS INSPECTION NOTES AT THE TIME OF THE INSPECTION READY TO POUR APRON, SIDEWALK & PAVER RESTRAINTS ONLY , IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/20/2024 | PARTIALLY APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION READY TO POUR APRON, SIDEWALK & PAVER RESTRAINTS ONLY , IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. | |||
| TIE BEAM / LINTEL | 03/05/2024 | APPROVED | BTAYLOR |
| ELECTRIC - EARLY POWER | 03/05/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 8-9-23 1. Emailed FPL at 10:20. 3-5-24 1. Emailed FPL at 10:06. | |||
| GRAVITY SEWER TEST | 12/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ALL COQUINA ROCK FROM SLAB BEFORE BACKFILLING ON WASTE & VENT PLUMBING. THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 12/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ALL COQUINA ROCK FROM SLAB BEFORE BACKFILLING ON WASTE & VENT PLUMBING. THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 11/08/2023 | APPROVED | BTAYLOR |
| INSULATION | 10/18/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 10/13/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 10/12/2023 | APPROVED | MKRASKI |
| ROOF VALLEY & METAL | 09/13/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/06/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING | 08/31/2023 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 08/09/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-9-23 1. Emailed FPL at 10:20. | |||
| TIE BEAM / LINTEL | 07/31/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 07/17/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/10/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/05/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ALL COQUINA ROCK FROM SLAB BEFORE BACKFILLING ON WASTE & VENT PLUMBING | |||
| WATER METER INSTALLATION REQUEST | 06/29/2023 | APPROVED | CSTONE |
| FOOTER | 06/20/2023 | APPROVED | BTAYLOR |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 10/11/2023 | 10/11/2023 |
| Note: Marked INFORMATION By: TIANA BELGROVE - (386)986-3780 - TBELGROVE@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| ENGIN1 | COMPLETE | 07/14/2023 | 07/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/14/2023 | 07/14/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/26/2023 | 06/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/23/2023 | 05/23/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/18/2023 | 05/19/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/18/2023 | 05/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/18/2023 | 05/18/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM NO ZONING CHANGES | |||
| BLD | COMPLETE | 05/12/2023 | 05/17/2023 |
| Note: Released By: JPI | |||
| URB | COMPLETE | 04/17/2023 | 04/19/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BADMIN | COMPLETE | 04/14/2023 | 04/18/2023 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/13/2023 | 04/18/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 04/13/2023 | 04/17/2023 |
| Note: Released By: HALEIGH HAND - - Water/Sewer Impact Fees will be added at a later date after all utility agreements are final. | |||
| ELEC | COMPLETE | 04/13/2023 | 04/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/13/2023 | 04/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/13/2023 | 04/17/2023 |
| LOCATE | HOLD | 04/13/2023 | 04/20/2023 |
| Note: Held By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM Utility system has not been accepted yet. | |||
| MECH | COMPLETE | 04/13/2023 | 04/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/13/2023 | 04/19/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL PROPOSED SOD ELEVATIONS AGAINST HOME NEED TO BE 4" BELOW FFE | |||
| ZON | COMPLETE | 04/13/2023 | 04/17/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/13/2024 |
| CONNECTION FEES | ¤25.00 | 06/06/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/06/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/06/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/06/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/06/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/06/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/06/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/06/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/06/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 06/06/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/06/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/06/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/06/2023 |
| SURCHARGE FS 533.721 | ¤4.04 | 06/06/2023 |
| SURCHARGE - FS 468.631 | ¤6.06 | 06/06/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/06/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/06/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/06/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/06/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/06/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 06/06/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 06/06/2023 |
| SEWER INSPECTION | ¤25.00 | 06/06/2023 |
| SEWER CAPITAL FACILITY | ¤1,682.11 | 06/06/2023 |
| WATER CAPITAL FACILITY FEE | ¤1,398.48 | 06/06/2023 |
| SITE PLAN 30 | ¤30.00 | 06/06/2023 |
| WATER-METER | ¤505.39 | 06/06/2023 |
| WATER-METER | ¤419.86 | 06/06/2023 |
| ADJUSTMENT 50% | (¤639.81) | 06/06/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/06/2023 |
| INSPECTION - RESIDENTIAL | ¤973.50 | 06/06/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤276.12 | 06/06/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,641.92 |