I want to search for...

Permit #2023040721

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-00610-0030
CONDITIONED SPACE: 1629 sqft
GARAGE: 438 sqft
OPENED PORCH (WITH ROOF) : 289 sqft
Total Square Footage: 2356 sqft
Block: 00610
Subdivision: 2189 - SECTION 25-PINE GROVE
Job Phone: 407-580-2657
Location Address: 9 PAT PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/07/2023
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: MASEFIELD DEVELOPMENT LLC

Address

8 VERNON WAY

WHIPPANY, NJ 07981

Lot: 0030
Contracted Stated Job Value: ¤320,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

KERRY DWAIN AYLESWORTH II
Status Location Address Mailing Address State License Number Phone
ACTIVE

2820 LEWIS SPEEDWAY

ST AUGUSTINE, FL 32084

STE B

ST AUGUSTINE, FL 32084

CAC1820713 (Exp: 08/31/2026) 904-342-5709
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 04/12/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE ------------------------------------------------------------------------------- 4/5/2024 - PREVIOUS INSPECTION NOTES ** 04/05/24 AS NOTED IN THE FIELD SURVEY ON 04/02/24 THIS INSPECTOR LEFT NOTES FOR THE BUILDER TO REMOVE THE COLD PATCH USED FOR THE ROAD REPAIR AS HOT ASPHALT PATCH IS REQUIRED AND TO EXTEND ROAD REPAIR ALSO USING HOT ASPHALT FOR ROAD REPAIR. COLD PATCH IS NOT ALLOWED FOR USE TO REPAIR ROAD DAMAGE ** ALSO SEE NOTES THAT WERE LEFT IN ROW STORMWATER FINAL ON 04/02/24 ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 04/02/24 BEFORE FINAL ROW IS APPROVED BUILDER NEEDS TO REMOVE THE COLD PATCH USED FOR THE ROAD REPAIR AND USE HOT ASPHALT PATCH AS REQUIRED BY THE CITY OF PALM COAST YOU WILL ALSO NEED TO EXTEND YOUR ROAD REPAIR ON THE LEFT SIDE NOTE THE HIGH LITED WHITE PAINT LEF TBY INSPECTOR Inspector Notes from Inspection 9465 ** 04/02/24 BEFORE FINAL ROW IS APPROVED BUILDER NEEDS TO REMOVE THE COLD PATCH USED FOR THE ROAD REPAIR AND USE HOT ASPHALT PATCH AS REQUIRED BY THE CITY OF PALM COAST YOU WILL ALSO NEED TO EXTEND YOUR ROAD REPAIR ON THE LEFT SIDE NOTE THE HIGH LITED WHITE PAINT LEF TBY INSPECTOR
BLD - BUILDING FINAL 04/11/2024 FINAL APPROVED KSANDOE
Note: 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: 1). Laundry room outlet on right wall is not GFCI protected as required. 2). Drip edge needs to be sealed where it meets/enters stucco. 3). Range anti-tip device is not installed per Manufacturer's instructions. Anchors in drywall only are pulling out. Needs to be secured to the flor with tapcons or the wall base plate with 2 anchors minimum. 4). Water heater relief valve tube is too close to the ground. (FBC-P504.7.2)
U-CROSS CONNECTION 04/11/2024 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with PVB installed-no cross connection
ROW - FINAL APRON (AFTER POUR) 04/05/2024 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
BLD - BUILDING FINAL 04/05/2024 Disapproved - NO FEE RSIMS
Note: 4/5/24: 1). Laundry room outlet on right wall is not GFCI protected as required. 2). Drip edge needs to be sealed where it meets/enters stucco. 3). Range anti-tip device is not installed per Manufacturer's instructions. Anchors in drywall only are pulling out. Needs to be secured to the flor with tapcons or the wall base plate with 2 anchors minimum. 4). Water heater relief valve tube is too close to the ground. (FBC-P504.7.2)
U -UTILITY RESIDENTIAL FINAL 04/05/2024 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 04/05/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/05/24 AS NOTED IN THE FIELD SURVEY ON 04/02/24 THIS INSPECTOR LEFT NOTES FOR THE BUILDER TO REMOVE THE COLD PATCH USED FOR THE ROAD REPAIR AS HOT ASPHALT PATCH IS REQUIRED AND TO EXTEND ROAD REPAIR ALSO USING HOT ASPHALT FOR ROAD REPAIR. COLD PATCH IS NOT ALLOWED FOR USE TO REPAIR ROAD DAMAGE ** ALSO SEE NOTES THAT WERE LEFT IN ROW STORMWATER FINAL ON 04/02/24 ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 04/02/24 BEFORE FINAL ROW IS APPROVED BUILDER NEEDS TO REMOVE THE COLD PATCH USED FOR THE ROAD REPAIR AND USE HOT ASPHALT PATCH AS REQUIRED BY THE CITY OF PALM COAST YOU WILL ALSO NEED TO EXTEND YOUR ROAD REPAIR ON THE LEFT SIDE NOTE THE HIGH LITED WHITE PAINT LEF TBY INSPECTOR Inspector Notes from Inspection 9465 ** 04/02/24 BEFORE FINAL ROW IS APPROVED BUILDER NEEDS TO REMOVE THE COLD PATCH USED FOR THE ROAD REPAIR AND USE HOT ASPHALT PATCH AS REQUIRED BY THE CITY OF PALM COAST YOU WILL ALSO NEED TO EXTEND YOUR ROAD REPAIR ON THE LEFT SIDE NOTE THE HIGH LITED WHITE PAINT LEF TBY INSPECTOR
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/02/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 04/02/2024 APPROVED - AS NOTED EMADISON
Note: ** 04/02/24 BEFORE FINAL ROW IS APPROVED BUILDER NEEDS TO REMOVE THE COLD PATCH USED FOR THE ROAD REPAIR AND USE HOT ASPHALT PATCH AS REQUIRED BY THE CITY OF PALM COAST YOU WILL ALSO NEED TO EXTEND YOUR ROAD REPAIR ON THE LEFT SIDE NOTE THE HIGH LITED WHITE PAINT LEF TBY INSPECTOR
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/22/2024 Disapproved - NO FEE EMADISON
Note: ** 03/22/24 YOUR FINAL SURVEYS DRAINAGE PATTERN WHICH WAS PROPOSED AS COMMON SWALES ALONG BOTH THE VACANT ON THE LEFT AND IMPROVED LOT ON THE RIGHT DOES NOT MATCH YOUR SUBMITTED SITE PLAN . THIS MAY HAVE BEEN INADVERTENTLY MISSED ON THE PREVIOUS INSPECTION ___________________________________________________________________________________________________________________ 2/28/2024 - PREVIOUS INSPECTION NOTES 1) THE FINAL STATES THE THERE WILL BE WATER POOLING IN THE DRAINAGE PATTERN ON THE BACK LEFT DO TO THE HIGHER ELEVATIONS SURROUNDING THE LOWER ELEVATION. 2) THE FINAL SURVEY STATES THAT YOU DON'T HAVE ENOUGH FALL FOR THE DRAINAGE PATTERN AROUND THE HOUSE THERE ARE SEVERAL OF THE ELEVATIONS ARE THE SAME ON BOTH SIDES OF THE DRAINAGE PATTERN. Sec.300.01 (4,5,6) Need to have positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/28/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) THE FINAL STATES THE THERE WILL BE WATER POOLING IN THE DRAINAGE PATTERN ON THE BACK LEFT DO TO THE HIGHER ELEVATIONS SURROUNDING THE LOWER ELEVATION. 2) THE FINAL SURVEY STATES THAT YOU DON'T HAVE ENOUGH FALL FOR THE DRAINAGE PATTERN AROUND THE HOUSE THERE ARE SEVERAL OF THE ELEVATIONS ARE THE SAME ON BOTH SIDES OF THE DRAINAGE PATTERN. Sec.300.01 (4,5,6) Need to have positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet.
ELECTRIC - EARLY POWER 02/09/2024 APPROVED RMARTIN
Note: 2/7/2024 - PREVIOUS INSPECTION NOTES 2/7/24: Overhead power source requires service feeds to be landed (installed) at Meter Panel/Main Panel 2/5/2024 - PREVIOUS INSPECTION NOTES 2/5/24- Please safe off wall Outlet behind Laundry room door. Inspector Notes from Inspection 2170 Emailed FPL @ 1010. Release Power
ELECTRIC - EARLY POWER 02/07/2024 Disapproved - NO FEE RSIMS
Note: 2/7/24: Overhead power source requires service feeds to be landed (installed) at Meter Panel/Main Panel 2/5/2024 - PREVIOUS INSPECTION NOTES 2/5/24- Please safe off wall Outlet behind Laundry room door. Inspector Notes from Inspection 2170 Emailed FPL @ 1010. Release Power
ELECTRIC - EARLY POWER 02/05/2024 Disapproved - NO FEE JSTEWART
Note: 2/5/24- Please safe off wall Outlet behind Laundry room door. Inspector Notes from Inspection 2170 Emailed FPL @ 1010. Release Power
ROW- PRE-APRON (PRE-POUR) 01/22/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. --------------------------------------------------------------------------------------------- 1/16/2024 - PREVIOUS INSPECTION NOTES 01/16/24 CULVERT DETAIL IN ATTACHED PHOTO. MITER ENDS MUST HAVE 2" OF CONCRETE OVER THE TOP. MITER ENDS AT DRIEVWAY SHALL BE 18" ON BOTH SIDES OF PIPE ON BOTH MITER ENDS CLOSEST TO DRIVEWAY AND 9" AT MITER END. THERE SHALL BE A 6X6 FOOTER AT THE END OF MITERED CUT END.
ROW- PRE-APRON (PRE-POUR) 01/16/2024 Disapproved - NO FEE TPOLACEK
Note: 01/16/24 CULVERT DETAIL IN ATTACHED PHOTO. MITER ENDS MUST HAVE 2" OF CONCRETE OVER THE TOP. MITER ENDS AT DRIEVWAY SHALL BE 18" ON BOTH SIDES OF PIPE ON BOTH MITER ENDS CLOSEST TO DRIVEWAY AND 9" AT MITER END. THERE SHALL BE A 6X6 FOOTER AT THE END OF MITERED CUT END.
U - SEWER TIE IN 12/11/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 12/11/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 12/01/2023 APPROVED KSANDOE
INSULATION 11/20/2023 APPROVED KSANDOE
ALL ROUGH 11/15/2023 APPROVED KSANDOE
ROOF VALLEY & METAL 10/30/2023 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/27/2023 APPROVED KSANDOE
Note: 10/24/2023 - PREVIOUS INSPECTION NOTES Item 1 below has not been addressed 10/23/2023 - PREVIOUS INSPECTION NOTES 1. Continuous load path… R301,2.1 over framing not tied to structural members beneath (Check all) 2. Needd letter from engineer for needed repairs on notched 2x12 at garage interior door header 3. missing Sp-1's on kings per detail on gaarage bearing wall 4. ABU66 Missing nails as required 5. Loose sheathing (Check all). INSPECTION STOPPED,NOT READY FOR INSPECTION, nothing else looked at.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/24/2023 Disapproved - NO FEE KSANDOE
Note: Item 1 below has not been addressed 10/23/2023 - PREVIOUS INSPECTION NOTES 1. Continuous load path… R301,2.1 over framing not tied to structural members beneath (Check all) 2. Needd letter from engineer for needed repairs on notched 2x12 at garage interior door header 3. missing Sp-1's on kings per detail on gaarage bearing wall 4. ABU66 Missing nails as required 5. Loose sheathing (Check all). INSPECTION STOPPED,NOT READY FOR INSPECTION, nothing else looked at.
WALL SHEATHING 10/23/2023 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/23/2023 Disapproved - NO FEE LMILLER
Note: 1. Continuous load path… R301,2.1 over framing not tied to structural members beneath (Check all) 2. Needd letter from engineer for needed repairs on notched 2x12 at garage interior door header 3. missing Sp-1's on kings per detail on gaarage bearing wall 4. ABU66 Missing nails as required 5. Loose sheathing (Check all). INSPECTION STOPPED,NOT READY FOR INSPECTION, nothing else looked at.
TIE BEAM / LINTEL 08/15/2023 APPROVED KSANDOE
FOUND SURVEY APPROVED (OFFICE) 08/07/2023 APPROVED TBAKER
MONOLITHIC SLAB 07/28/2023 APPROVED KSANDOE
Note: 7/27/2023 - PREVIOUS INSPECTION NOTES Clear cave-ins throughout
MONOLITHIC SLAB 07/27/2023 Disapproved - NO FEE KSANDOE
Note: Clear cave-ins throughout
PLUMBING 1ST ROUGH UNDERGROUND 07/12/2023 APPROVED MGIBSON
ELECTRIC TEMP POLE 07/07/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1010. Release Power
WATER METER INSTALLATION REQUEST 06/15/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 04/01/2024 04/03/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/07/2023 08/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/07/2023 08/07/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 04/23/2023 04/24/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 04/23/2023 04/28/2023
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/23/2023 04/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 04/14/2023 04/14/2023
Note: Released By: JPI
CUSVC COMPLETE 04/14/2023 04/18/2023
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 04/14/2023 04/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/14/2023 04/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 04/14/2023 04/17/2023
LOCATE COMPLETE 04/14/2023 04/18/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 04/14/2023 04/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/14/2023 04/21/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM SITE PLAN NEED TO SPECIFY THE SIZE OF THE CULVERT PIPE Culvert material and size to be depicted. Typical is 17X13 CMP (L)
ZON HOLD 04/14/2023 04/18/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan must show walkway width and material Rear Setback should be shown from the rear patio to property line on site plan/survey
BADMIN COMPLETE 04/14/2023 04/18/2023
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM
SWALE COMPLETE 04/14/2023 06/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 04/11/2024
SW ENG REINSPECTION 20 ¤20.00 04/11/2024
PLAN REVIEW - REVISION ¤32.50 04/11/2024
CONNECTION FEES ¤1,166.26 06/07/2023
WATER- TURN ON ¤25.00 06/07/2023
ADJUSTMENT 50% (¤579.80) 06/07/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/07/2023
INSPECTION - RESIDENTIAL ¤880.00 06/07/2023
PLAN REVIEW - RESIDENTIAL ¤249.60 06/07/2023
SW ENG - REVIEW 20 ¤20.00 06/07/2023
SW ENG RES REVIEW 200 ¤200.00 06/07/2023
TRANS IMPACT FEE ADMIN ¤54.36 06/07/2023
TRANS IMPACT FEE ADMIN (¤54.36) 06/07/2023
SEWER CREDIT (¤850.00) 06/07/2023
SEWER INSPECTION ¤25.00 06/07/2023
SEWER CAPITAL FACILITY ¤5,344.82 06/07/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 06/07/2023
SITE PLAN 30 ¤30.00 06/07/2023
FIRE IMPACT FEE ADMIN ¤12.62 06/07/2023
FIRE IMPACT FEE ADMIN (¤12.62) 06/07/2023
FC IMPACT FEE EMS ¤62.00 06/07/2023
IMPACT FEE FIRE ¤420.52 06/07/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/07/2023
FC IMPACT FEE LIBRARY ¤268.00 06/07/2023
IMPACT FEE PARKS ¤1,769.15 06/07/2023
IMPACT FEE SCHOOL ¤5,450.00 06/07/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 06/07/2023
WATER -IRRIGATION INSPECTION ¤25.00 06/07/2023
PARKS IMPACT FEE ADMIN ¤53.07 06/07/2023
PARKS IMPACT FEE ADMIN (¤53.07) 06/07/2023
SURCHARGE FS 533.721 ¤3.69 06/07/2023
SURCHARGE - FS 468.631 ¤5.54 06/07/2023
SW ENG - FOUNDATION SURVEY ¤20.00 06/07/2023
SW ENG INSPECTION 80 ¤80.00 06/07/2023
SW ENG PRE APRON ¤30.00 06/07/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,701.16