Permit #2023040756

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00050-0030
CONDITIONED SPACE: 1546 sqft
GARAGE: 448 sqft
OPENED PORCH (WITH ROOF) : 55 sqft
OPENED PORCH (WITH ROOF) : 82 sqft
CONDITIONED SPACE: 1546 sqft
GARAGE: 448 sqft
OPENED PORCH (WITH ROOF) : 55 sqft
OPENED PORCH (WITH ROOF) : 82 sqft
Total Square Footage: 4262 sqft
Block: 00050
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 774-696-6541
Location Address: 5 COLUMBIA LN
Type: DU - DUPLEX
Issue Date: 06/21/2023
NOC: RECORDED
Applicant name: JOHN DESMOND
Owner: DESMOND, JOHN J.

Address

15 CHERRYTREE CT

PALM COAST, FL 32137

Lot: 0030
Contracted Stated Job Value: ¤325,000.00
Job Description: DUPLEX
Type: CN

Contractor

COMPLETE BUILDERS LLC
Status Location Address State License Number Phone
INACTIVE

15 CHERRYTREE CT

PALM COAST, FL 32137

CGC1530956 (Exp: 08/31/2026) 774-696-6541

Sub Contractors

FRANK E SEVERINO
Status Location Address State License Number Phone Fax
ACTIVE

1360 N NOVA RD

DAYTONA BEACH, FL 32117

CBC060543 (Exp: 08/31/2026) 386-253-1943 386-238-0139
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
IAN MICHEAL JOHNSON
Status Location Address State License Number Phone Fax
ACTIVE

4244 JACKSON STREET

PORT ORANGE, FL 32127

CCC1325915 (Exp: 08/31/2026) 386-760-0764 386-760-3080
JEFFREY ADAM MCGREGOR
Status Location Address State License Number Phone Fax
ACTIVE

1312 YORKTOWN STREET

DELAND , FL 32724

EC13005662 (Exp: 08/31/2026) 386-736-7475 386-785-1503
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/28/2024 FINAL APPROVED AGAETANO
Note: 2/27/2024 - PREVIOUS INSPECTION NOTES 02-27-2024 1. Both units no water in kitchen sink. 2. Both units loose outlets in kitchen counter. Check all. 3. SGD left unit not opening. 4. Holes exterior wall and soffit at meter. Check all. 5. Inspection stopped. A complete inspection will be required.
BLD - BUILDING FINAL 02/27/2024 Disapproved - NO FEE AGAETANO
Note: 02-27-2024 1. Both units no water in kitchen sink. 2. Both units loose outlets in kitchen counter. Check all. 3. SGD left unit not opening. 4. Holes exterior wall and soffit at meter. Check all. 5. Inspection stopped. A complete inspection will be required.
ROW - FINAL INSPECTION 02/16/2024 APPROVED TPOLACEK
Note: 02/16/24 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 2/15/2024 - PREVIOUS INSPECTION NOTES ** 02/15/24 AS NOTED IN PREVIOUS INSPECTION THIS STILL IS REQUIRED TO BE CORRECTED ** RIGHT SIDE ALONG VACANT PROPERTY LINE NEED TO RAKE OUT BARE EXPOSED EARTH NEAR REAR AND ALL MOUNDS THROWN ONTO VACANT THEN ***SEED AND STRAW*** _______________________________________________________________________________________________________________________ 2/8/2024 - PREVIOUS INSPECTION NOTES ** 02/08/24 LEFT SIDE IN DRAINAGEAGE CONVEYANCE BUILDER NEED TO REMOVE THE SHRUBBERY AND BARK MULCH FROM ALONG SIDE THE A/C PAD NOTE WHITE PAINT ** IN REAR ROAD SIDE OF THE FENCE IN EASEMENT NEED TO REPAIR SOD ON BANK AND COVER BARE EARTH ** RIGHT SIDE ALONG VACANT PROPERTY LINE NEED TO RAKE OUT BARE EXPOSED EARTH NEAR REAR AND ALL MOUNDS THROWN ONTO VACANT THEN ***SEED AND STRAW*** ** NEED TO REMOVE THE DUMPSTER FROM THE RIGHT AWAY AND REPAIR AND SOD DISTURBED EARTH ** REMOVE ALL TRASH AND CONSTRUCTION DEBRISFROM AROUND DUMPSTER AND VACANT
ROW - FINAL INSPECTION 02/15/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 02/15/24 AS NOTED IN PREVIOUS INSPECTION THIS STILL IS REQUIRED TO BE CORRECTED ** RIGHT SIDE ALONG VACANT PROPERTY LINE NEED TO RAKE OUT BARE EXPOSED EARTH NEAR REAR AND ALL MOUNDS THROWN ONTO VACANT THEN ***SEED AND STRAW*** _______________________________________________________________________________________________________________________ 2/8/2024 - PREVIOUS INSPECTION NOTES ** 02/08/24 LEFT SIDE IN DRAINAGEAGE CONVEYANCE BUILDER NEED TO REMOVE THE SHRUBBERY AND BARK MULCH FROM ALONG SIDE THE A/C PAD NOTE WHITE PAINT ** IN REAR ROAD SIDE OF THE FENCE IN EASEMENT NEED TO REPAIR SOD ON BANK AND COVER BARE EARTH ** RIGHT SIDE ALONG VACANT PROPERTY LINE NEED TO RAKE OUT BARE EXPOSED EARTH NEAR REAR AND ALL MOUNDS THROWN ONTO VACANT THEN ***SEED AND STRAW*** ** NEED TO REMOVE THE DUMPSTER FROM THE RIGHT AWAY AND REPAIR AND SOD DISTURBED EARTH ** REMOVE ALL TRASH AND CONSTRUCTION DEBRISFROM AROUND DUMPSTER AND VACANT
U -UTILITY RESIDENTIAL FINAL 02/08/2024 FINAL APPROVED DHANEY
ROW - FINAL INSPECTION 02/08/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 02/08/24 LEFT SIDE IN DRAINAGEAGE CONVEYANCE BUILDER NEED TO REMOVE THE SHRUBBERY AND BARK MULCH FROM ALONG SIDE THE A/C PAD NOTE WHITE PAINT ** IN REAR ROAD SIDE OF THE FENCE IN EASEMENT NEED TO REPAIR SOD ON BANK AND COVER BARE EARTH ** RIGHT SIDE ALONG VACANT PROPERTY LINE NEED TO RAKE OUT BARE EXPOSED EARTH NEAR REAR AND ALL MOUNDS THROWN ONTO VACANT THEN ***SEED AND STRAW*** ** NEED TO REMOVE THE DUMPSTER FROM THE RIGHT AWAY AND REPAIR AND SOD DISTURBED EARTH ** REMOVE ALL TRASH AND CONSTRUCTION DEBRISFROM AROUND DUMPSTER AND VACANT
ROW - FINAL APRON (AFTER POUR) 02/08/2024 APPROVED EMADISON
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 02/08/2024 APPROVED AGAETANO
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/07/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 02/07/2024 APPROVED EMADISON
Note:
ROW- PRE-APRON (PRE-POUR) 12/13/2023 APPROVED - AS NOTED EMADISON
Note: ** 12/13/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ______________________________________________________________________________________________________________________ 12/11/2023 - PREVIOUS INSPECTION NOTES ** 12/11/23 BOTH DRIVEWAYS HAVE BEEN FORMED INCORRECTLY SITE PLAN CALLS FOR BOTH DRIVEWAYS TO BE 16 FEET WIDE BOTH DRIVEWAYS MEASURING AT 25 FEET WIDE DOES NOT MATCH SITE PLAN ** NEED TO MAKE SURE YOU HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA AND IN SIDEWALKS ** NEED TO MAKE SURE FORM BOARDS ARE EXTENDED TO GROUND OR BACKFILLED TO CONTAIN CONCRETE WITHIN THE POUR AREA ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 12/11/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/11/23 BOTH DRIVEWAYS HAVE BEEN FORMED INCORRECTLY SITE PLAN CALLS FOR BOTH DRIVEWAYS TO BE 16 FEET WIDE BOTH DRIVEWAYS MEASURING AT 25 FEET WIDE DOES NOT MATCH SITE PLAN ** NEED TO MAKE SURE YOU HAVE A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA AND IN SIDEWALKS ** NEED TO MAKE SURE FORM BOARDS ARE EXTENDED TO GROUND OR BACKFILLED TO CONTAIN CONCRETE WITHIN THE POUR AREA ** SEE ATTACHED PHOTOS
INSULATION 11/20/2023 APPROVED AGAETANO
ALL ROUGH 11/15/2023 APPROVED BTAYLOR
Note: 11/14/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES 11-13-23 need to complete all items in prior failure notification before re-calling inspection. Checked for a complete set of documents and they were not on site as requested. nothing further checked. Please complete all requested items, and insure any additional items needing attention are correected and then recall inspection when ready. Inpection stopped 11/9/2023 - PREVIOUS INSPECTION NOTES 1. Address noit visible from road per FBC 319.1 2. Fullset of plans and e-cals need to be on site for inspection per FBC 107.3.1 3. Failed 5' head pressure (left side) 4. Nail plate missing on drain line for washer (left side) Not ready, stopped inspection. only looked at garage and laundry on left side nothing else 11-14-2023 1. Energy calcs and mechanical layouit not on site. 2. Only one head test. 3. Drawings are ripped, dirty, and matted. Please organize and provide a readable, full set of approved drawings for all inspections.
ALL ROUGH 11/14/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 11/13/2023 - PREVIOUS INSPECTION NOTES 11-13-23 need to complete all items in prior failure notification before re-calling inspection. Checked for a complete set of documents and they were not on site as requested. nothing further checked. Please complete all requested items, and insure any additional items needing attention are correected and then recall inspection when ready. Inpection stopped 11/9/2023 - PREVIOUS INSPECTION NOTES 1. Address noit visible from road per FBC 319.1 2. Fullset of plans and e-cals need to be on site for inspection per FBC 107.3.1 3. Failed 5' head pressure (left side) 4. Nail plate missing on drain line for washer (left side) Not ready, stopped inspection. only looked at garage and laundry on left side nothing else 11-14-2023 1. Energy calcs and mechanical layouit not on site. 2. Only one head test. 3. Drawings are ripped, dirty, and matted. Please organize and provide a readable, full set of approved drawings for all inspections.
ALL ROUGH 11/13/2023 Disapproved -FEE REQUIRED LMILLER
Note: 11-13-23 Received call from job site super, located documents, came back and did a complete inspection. need nail plates on electric and plumbing in side B, top pressure treated band (check all) 11-13-23 need to complete all items in prior failure notification before re-calling inspection. Checked for a complete set of documents and they were not on site as requested. nothing further checked. Please complete all requested items, and insure any additional items needing attention are correected and then recall inspection when ready. Inpesction stopped 11/9/2023 - PREVIOUS INSPECTION NOTES 1. Address noit visible from road per FBC 319.1 2. Fullset of plans and e-cals need to be on site for inspection per FBC 107.3.1 3. Failed 5' head pressure (left side) 4. Nail plate missing on drain line for washer (left side) Not ready, stopped inspection. only looked at garage and laundry on left side nothing else
ALL ROUGH 11/09/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Address noit visible from road per FBC 319.1 2. Fullset of plans and e-cals need to be on site for inspection per FBC 107.3.1 3. Failed 5' head pressure (left side) 4. Nail plate missing on drain line for washer (left side) Not ready, stopped inspection. only looked at garage and laundry on left side nothing else
FIREWALL FINAL 11/08/2023 APPROVED BTAYLOR
GRAVITY SEWER TEST 11/06/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 11/06/2023 APPROVED AGAETANO
Note: 10/31/2023 - PREVIOUS INSPECTION NOTES Need to apply water barrier to exposed wood at front windows and at ufer conection around trim ring.
U - SEWER TIE IN 11/06/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 10/31/2023 Disapproved - NO FEE LMILLER
Note: Need to apply water barrier to exposed wood at front windows and at ufer conection around trim ring.
ROOF VALLEY & METAL 10/23/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/18/2023 APPROVED - AS NOTED AGAETANO
Note: 9/22/2023 - PREVIOUS INSPECTION NOTES 09-22-2023 1. A2 A5 ledger board not installed as per plans. 10-18-2023 Both T14 missing 3/4" gussets. Check at next inspection.
FIREWALL DRYWALL NAILING 10/18/2023 APPROVED AGAETANO
WALL SHEATHING 09/22/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/22/2023 Disapproved - NO FEE AGAETANO
Note: 09-22-2023 1. A2 A5 ledger board not installed as per plans.
FOUND SURVEY APPROVED (OFFICE) 09/21/2023 APPROVED TBAKER
TIE BEAM / LINTEL 08/22/2023 APPROVED FWILLIS
MONOLITHIC SLAB 08/07/2023 APPROVED AGAETANO
Note: 8/3/2023 - PREVIOUS INSPECTION NOTES 8/3/23: Notified Contractor ** Unit A: Back bathroom plumbing drain sleeve is not extended through the footer & minor dirt cave in at garage front area.
MONOLITHIC SLAB 08/03/2023 Disapproved - NO FEE RSIMS
Note: 8/3/23: Notified Contractor ** Unit A: Back bathroom plumbing drain sleeve is not extended through the footer & minor dirt cave in at garage front area.
PLUMBING 1ST ROUGH UNDERGROUND 07/28/2023 APPROVED MGIBSON
U-CROSS CONNECTION 07/28/2023 APPROVED DHANEY
WATER METER INSTALLATION REQUEST 07/18/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 09/25/2023 09/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 09/21/2023 09/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/21/2023 09/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/21/2023 09/21/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 08/21/2023 08/21/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please correct the file names on your documents. See the document submittal regulations on the permit portal page for specific instructions.
BADMIN INFORMATION 07/13/2023 07/13/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM NOC description of property should be address not land. Need to have NOC re recorded with new instrument no.
MECH COMPLETE 06/15/2023 06/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/14/2023 06/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 06/14/2023 06/14/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout does not match the house plans
BLD HOLD 06/12/2023 06/13/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 2. The conditioned space area in the Energy Calculations does not equal the same area listed within the Floor Plan SF breakdown. Please cure. 107.2.6
BLD HOLD 06/07/2023 06/08/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5
ENGIN1 COMPLETE 05/24/2023 05/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/24/2023 06/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 05/24/2023 05/24/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM changes for stormwater only
MECH COMPLETE 05/24/2023 05/24/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 05/16/2023 05/16/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 05/16/2023 05/16/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH HOLD 05/16/2023 05/16/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition (Third Request) House faces NE
ELEC HOLD 05/16/2023 05/16/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit a duplex riser diagram
SW1 COMPLETE 05/16/2023 05/23/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
BLD HOLD 05/16/2023 05/17/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles are of a similar nomenclature. 107.3.5
ENGIN1 COMPLETE 05/16/2023 05/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/16/2023 05/23/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 05/08/2023 05/08/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan missing Please provide new site plan with new house layout
ELEC HOLD 05/08/2023 05/09/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit a duplex riser diagram
SW1 HOLD 05/08/2023 05/15/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM NEED TO SUBMIT A NEW SITE PLAN
MECH HOLD 05/08/2023 05/08/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition (Second Request)
BADMIN INFORMATION 05/08/2023 05/08/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM REMOVE '5 COLUMBIA LANE' FROM ALL FILE NAMES
BLD HOLD 05/08/2023 05/15/2023
Note: Held By: JPI 1. The address on the energy calculations do not match the address on the permit application. Please cure and review will continue. EC R101.5
MECH HOLD 05/05/2023 05/08/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
BLD COMPLETE 04/14/2023 04/18/2023
Note: Released By: JPI
CUSVC COMPLETE 04/14/2023 04/17/2023
Note: Released By: HALEIGH HAND - -
ELEC HOLD 04/14/2023 04/20/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs. 2. Submit a duplex riser diagram 3. Need correct outlet spacing in master bed rooms. NEC 2017 210.52
ENGIN1 COMPLETE 04/14/2023 04/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 04/14/2023 04/18/2023
LOCATE COMPLETE 04/14/2023 04/18/2023
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 04/14/2023 04/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/14/2023 04/21/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Need to submit a clear site plan . The proposed elevations shall be shown at all locations of existing elevations per the A) Adjacent driveway culverts and drainage features: Site Plan must include the inverts of .Adjacent driveway culverts and drainage features: Site Plan must include the inverts ofadjacent developed property driveway culverts and any other drainage features within 100 feet of the property lines. (A)See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items. See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items.
ZON HOLD 04/14/2023 04/18/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan missing Banding required around all windows and doors facing right of way. This backs tp a rear street so banding required on the back. Scanned copy of survey is band quality. All numbers cannot be read Duplexes with 1,300 or greater square feet in living area per unit shall have at least a two-car attached garage per dwelling unit.
SWALE COMPLETE 04/14/2023 06/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 02/28/2024
REINSPECTION RESIDENTIAL ¤40.00 02/28/2024
REINSPECTION RESIDENTIAL ¤40.00 02/28/2024
REINSPECTION RESIDENTIAL ¤40.00 02/28/2024
SW ENG REINSPECTION 20 ¤20.00 02/28/2024
SW ENG REINSPECTION 20 ¤20.00 02/28/2024
SW ENG REINSPECTION 30 ¤30.00 02/28/2024
SW ENG - REVIEW 20 ¤20.00 06/21/2023
SW ENG RES REVIEW 200 ¤200.00 06/21/2023
TRANS IMPACT FEE ADMIN ¤84.36 06/21/2023
TRANS IMPACT FEE ADMIN (¤84.36) 06/21/2023
SEWER CREDIT (¤336.31) 06/21/2023
SEWER INSPECTION ¤25.00 06/21/2023
SEWER CAPITAL FACILITY ¤10,689.64 06/21/2023
WATER CAPITAL FACILITY FEE ¤7,847.76 06/21/2023
SITE PLAN 30 ¤30.00 06/21/2023
WATER- TURN ON ¤50.00 06/21/2023
ADJUSTMENT 50% (¤705.12) 06/21/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/21/2023
INSPECTION - RESIDENTIAL ¤1,075.25 06/21/2023
PLAN REVIEW - RESIDENTIAL ¤304.98 06/21/2023
CONNECTION FEES ¤2,332.52 06/21/2023
FIRE IMPACT FEE ADMIN ¤25.23 06/21/2023
FIRE IMPACT FEE ADMIN (¤25.23) 06/21/2023
FC IMPACT FEE EMS ¤124.00 06/21/2023
IMPACT FEE FIRE ¤841.04 06/21/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 06/21/2023
FC IMPACT FEE LIBRARY ¤536.00 06/21/2023
IMPACT FEE PARKS ¤3,538.30 06/21/2023
IMPACT FEE SCHOOL ¤10,900.00 06/21/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 06/21/2023
WATER -IRRIGATION INSPECTION ¤50.00 06/21/2023
PARKS IMPACT FEE ADMIN ¤106.15 06/21/2023
PARKS IMPACT FEE ADMIN (¤106.15) 06/21/2023
SURCHARGE FS 533.721 ¤7.05 06/21/2023
SURCHARGE - FS 468.631 ¤10.58 06/21/2023
SW ENG - FOUNDATION SURVEY ¤20.00 06/21/2023
SW ENG INSPECTION 80 ¤80.00 06/21/2023
SW ENG PRE APRON ¤30.00 06/21/2023
Fees Total Due: ¤0.00 Total Paid: ¤41,171.19