Permit #2023040767
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7059-00990-0090 |
| Block: 00990 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 386-212-2958 |
| Location Address: 10 SEA BROOK PL |
| Type: PO - POOL |
| Issue Date: 08/03/2023 |
| NOC: RECORDED |
| Applicant name: COBY KYLE MOORE |
| Owner: DAVIS JOSHUA & LESLEY H&W |
|
Address 10 SEA BROOK PLACE PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤70,000.00 |
| Job Description: Swimming pool with deck- screen by others |
| Type: CN |
Contractor
CM DESIGNS INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1050 ROBERTS STREET ORMOND BEACH, FL 32174 |
CPC1456991 (Exp: 08/31/2026) | (386)615-7425 | 386-676-2963 |
Sub Contractors
GREGORY ALAN WARD
| Status | Location Address | State License Number | Phone |
| INACTIVE |
P.O. BOX 731453 ORMOND BEACH, FL 32174 |
EC13005000 (Exp: 08/31/2026) | 386-566-7248 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 10/04/2024 | FINAL APPROVED | BTAYLOR |
| Note: 9/23/2024 - PREVIOUS INSPECTION NOTES 9-23-24 1. No alarm in pool. | |||
| POOL FINAL | 09/23/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 9-23-24 1. No alarm in pool. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/20/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/19/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/19/24 SURVEY ELEVATIONS PROVIDED DRAINAGE WILL WORK. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 8/29/2024 - PREVIOUS INSPECTION NOTES 8/29/24 *****INSPECTORS NOTE****SPOKE WITH STEVE CM TODAY AND REITERATED WHAT I HAD SAID TO JANE ON THE PHONE ON 8/20/24 THAT THE DRAINAGE FIX WAS ACCEPTABLE BUT THEY WOULD NEED TO SOD THE AREA WORKED ON, RESHOOT IT, AND SUBMIT A NEW SURVEY SHOWING THE ELEVATIONS BEFORE I WOULD PASS IT. STEVE INDICATED HE UNDERSTOOD AND WAS GOING TO GET THE REQUIRED STEPS TAKEN CARE OF BEFORE RESUBMITTING HIS NEW FINAL SURVEY. Inspector Notes from Inspection 9200 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/19/24 At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. Inspector Notes from Inspection 9463 9/19/24 SURVEY ELEVATIONS PROVIDED DRAINAGE WILL WORK. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 8/29/2024 - PREVIOUS INSPECTION NOTES 8/29/24 *****INSPECTORS NOTE****SPOKE WITH STEVE CM TODAY AND REITERATED WHAT I HAD SAID TO JANE ON THE PHONE ON 8/20/24 THAT THE DRAINAGE FIX WAS ACCEPTABLE BUT THEY WOULD NEED TO SOD THE AREA WORKED ON, RESHOOT IT, AND SUBMIT A NEW SURVEY SHOWING THE ELEVATIONS BEFORE I WOULD PASS IT. STEVE INDICATED HE UNDERSTOOD AND WAS GOING TO GET THE REQUIRED STEPS TAKEN CARE OF BEFORE RESUBMITTING HIS NEW FINAL SURVEY. Inspector Notes from Inspection 9200 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS. | |||
| ROW - FINAL INSPECTION | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/19/24 At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. __________________________________________________________________________________________________________________________ 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/29/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 8/29/24 *****INSPECTORS NOTE****SPOKE WITH STEVE CM TODAY AND REITERATED WHAT I HAD SAID TO JANE ON THE PHONE ON 8/20/24 THAT THE DRAINAGE FIX WAS ACCEPTABLE BUT THEY WOULD NEED TO SOD THE AREA WORKED ON, RESHOOT IT, AND SUBMIT A NEW SURVEY SHOWING THE ELEVATIONS BEFORE I WOULD PASS IT. STEVE INDICATED HE UNDERSTOOD AND WAS GOING TO GET THE REQUIRED STEPS TAKEN CARE OF BEFORE RESUBMITTING HIS NEW FINAL SURVEY. Inspector Notes from Inspection 9200 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS. | |||
| ROW- PROJECT STATUS | 08/09/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/13/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 6/13/24 PLEASE READ ALL PREVIOUS NOTES. YOUR FINAL SURVEY STILL SHOWS DRAINAGE COMING OFF THE POOL DECK AND CONTINUING TO THE REAR AND ONTO THE ADJOINING PROPERTY. ADVERSE DRAINAGE ONTO EXISTING ADJACENT PROPERTIES IS NOT ALLOWED. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 4/3/2024 - PREVIOUS INSPECTION NOTES 04/03/24 THE LTEST SURVEY STILL SHOWS FLOW WITH ARROWS AND ELEVATIONS THAT CONTRADICT THE SITE PLAN. THIS DRAINAGE DOES NOT FOLLOW THE MINIMUM STANDARDS SET BY THE CITY. SEE PREVIOUS NOTE WITH TECH CODE ATTACHED. --------------------------------------------------------------------------------------------------------------------------- 3/5/2024 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY DOESN'T CAPTURE THE DRAINAGE PATTERN BEHIND THE POOL SUREYOR NEEDS TO CAPTURE ALL DRAINAGE PROPERLY. Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. ----------------------------------------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/03/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 04/03/24 THE LTEST SURVEY STILL SHOWS FLOW WITH ARROWS AND ELEVATIONS THAT CONTRADICT THE SITE PLAN. THIS DRAINAGE DOES NOT FOLLOW THE MINIMUM STANDARDS SET BY THE CITY. SEE PREVIOUS NOTE WITH TECH CODE ATTACHED. --------------------------------------------------------------------------------------------------------------------------- 3/5/2024 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY DOESN'T CAPTURE THE DRAINAGE PATTERN BEHIND THE POOL SUREYOR NEEDS TO CAPTURE ALL DRAINAGE PROPERLY. Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. ----------------------------------------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/05/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE FINAL SURVEY DOESN'T CAPTURE THE DRAINAGE PATTERN BEHIND THE POOL SUREYOR NEEDS TO CAPTURE ALL DRAINAGE PROPERLY. Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. ----------------------------------------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/23/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/23/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications | |||
| ELECTRIC AND ALARM | 12/05/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: test alarm on final | |||
| POOL DECK | 10/18/2023 | APPROVED | BTAYLOR |
| POOL DECK | 10/17/2023 | CANCELLED BY APPLICANT | WEB |
| STEEL AND GROUND | 08/28/2023 | APPROVED | BTAYLOR |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/01/2024 | 04/01/2024 |
| Note: Marked INFORMATION By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM We can't accept the Final Survey because the NOC is expired. Please submit a new or re-recorded NOC. | |||
| ZON | COMPLETE | 07/26/2023 | 07/26/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/11/2023 | 07/11/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Screen plans still do not match pool and all of its plans there for the permit may not be released. | |||
| ZON | HOLD | 06/28/2023 | 06/28/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Pool permit will not be released until pool enclosure corrections are met. Please make sure the dimension of the pool deck match wtih the screen enclosure plans and the site plan as well. | |||
| SW1 | COMPLETE | 06/28/2023 | 07/10/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/22/2023 | 06/23/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Pool permit will not be released until pool enclosure corrections are met. Please make sure the dimension of the pool deck match wtih the screen enclosure plans and the site plan as well. | |||
| SW1 | HOLD | 06/22/2023 | 06/26/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROWS TO SHOW DRAINAGE OF LOT | |||
| BLD | COMPLETE | 06/22/2023 | 06/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/11/2023 | 06/12/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM There is an original final survey on file and according to the 23.33" in the rear setback your proposed deck does not meet the 6.5' setback you are giving me on the site plan. Please make your deck smaller to fit the setbacks . | |||
| SW1 | HOLD | 06/11/2023 | 06/14/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROWS | |||
| ZON | HOLD | 05/15/2023 | 05/16/2023 |
| Note: Held By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM 1. Provide ALL deck dimensions on the site plan to match pool plan. Repeat Comment: 2. Pool permit approval pending screen enclosure permit. | |||
| SW1 | COMPLETE | 05/15/2023 | 05/23/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/15/2023 | 05/15/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/14/2023 | 04/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/14/2023 | 04/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/14/2023 | 04/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/14/2023 | 04/20/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED FLOW ARROW TO SHOW DRAINAGE | |||
| ZON | HOLD | 04/14/2023 | 04/18/2023 |
| Note: Held By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM 1. Pool permit approval pending screen enclosure permit. 2. Minimum rear setback is 6.5' |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/15/2024 |
| EXTENSION | ¤40.00 | 07/24/2024 |
| INSPECTION- POOL | ¤160.00 | 08/03/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 08/03/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/03/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/03/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 08/03/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/03/2023 |
| SITE PLAN 30 | ¤30.00 | 08/03/2023 |
| ADJUSTMENT 50% | (¤127.50) | 08/03/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/03/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤281.50 |