Permit #2023040767

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7059-00990-0090
Block: 00990
Subdivision: 2211 - SECTION 59-SEMINOLE PARK
Job Phone: 386-212-2958
Location Address: 10 SEA BROOK PL
Type: PO - POOL
Issue Date: 08/03/2023
NOC: RECORDED
Applicant name: COBY KYLE MOORE
Owner: DAVIS JOSHUA & LESLEY H&W

Address

10 SEA BROOK PLACE

PALM COAST, FL 32164

Lot: 0090
Contracted Stated Job Value: ¤70,000.00
Job Description: Swimming pool with deck- screen by others
Type: CN

Contractor

CM DESIGNS INC.
Status Location Address State License Number Phone Fax
ACTIVE

1050 ROBERTS STREET

ORMOND BEACH, FL 32174

CPC1456991 (Exp: 08/31/2026) (386)615-7425 386-676-2963

Sub Contractors

GREGORY ALAN WARD
Status Location Address State License Number Phone
INACTIVE

P.O. BOX 731453

ORMOND BEACH, FL 32174

EC13005000 (Exp: 08/31/2026) 386-566-7248

Inspection History

Type Request Date Result Inspector
POOL FINAL 10/04/2024 FINAL APPROVED BTAYLOR
Note: 9/23/2024 - PREVIOUS INSPECTION NOTES 9-23-24 1. No alarm in pool.
POOL FINAL 09/23/2024 Disapproved - NO FEE BTAYLOR
Note: 9-23-24 1. No alarm in pool.
U -UTILITY RESIDENTIAL FINAL 09/20/2024 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/19/2024 APPROVED - AS NOTED FSLADISH
Note: 9/19/24 SURVEY ELEVATIONS PROVIDED DRAINAGE WILL WORK. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 8/29/2024 - PREVIOUS INSPECTION NOTES 8/29/24 *****INSPECTORS NOTE****SPOKE WITH STEVE CM TODAY AND REITERATED WHAT I HAD SAID TO JANE ON THE PHONE ON 8/20/24 THAT THE DRAINAGE FIX WAS ACCEPTABLE BUT THEY WOULD NEED TO SOD THE AREA WORKED ON, RESHOOT IT, AND SUBMIT A NEW SURVEY SHOWING THE ELEVATIONS BEFORE I WOULD PASS IT. STEVE INDICATED HE UNDERSTOOD AND WAS GOING TO GET THE REQUIRED STEPS TAKEN CARE OF BEFORE RESUBMITTING HIS NEW FINAL SURVEY. Inspector Notes from Inspection 9200 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS.
ROW FIELD SURVEY /GRADING CERTIFICATION 09/19/2024 APPROVED FSLADISH
Note: 9/19/24 At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. Inspector Notes from Inspection 9463 9/19/24 SURVEY ELEVATIONS PROVIDED DRAINAGE WILL WORK. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 8/29/2024 - PREVIOUS INSPECTION NOTES 8/29/24 *****INSPECTORS NOTE****SPOKE WITH STEVE CM TODAY AND REITERATED WHAT I HAD SAID TO JANE ON THE PHONE ON 8/20/24 THAT THE DRAINAGE FIX WAS ACCEPTABLE BUT THEY WOULD NEED TO SOD THE AREA WORKED ON, RESHOOT IT, AND SUBMIT A NEW SURVEY SHOWING THE ELEVATIONS BEFORE I WOULD PASS IT. STEVE INDICATED HE UNDERSTOOD AND WAS GOING TO GET THE REQUIRED STEPS TAKEN CARE OF BEFORE RESUBMITTING HIS NEW FINAL SURVEY. Inspector Notes from Inspection 9200 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS.
ROW - FINAL INSPECTION 09/19/2024 APPROVED FSLADISH
Note: 9/19/24 At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. __________________________________________________________________________________________________________________________ 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/29/2024 Disapproved - NO FEE FSLADISH
Note: 8/29/24 *****INSPECTORS NOTE****SPOKE WITH STEVE CM TODAY AND REITERATED WHAT I HAD SAID TO JANE ON THE PHONE ON 8/20/24 THAT THE DRAINAGE FIX WAS ACCEPTABLE BUT THEY WOULD NEED TO SOD THE AREA WORKED ON, RESHOOT IT, AND SUBMIT A NEW SURVEY SHOWING THE ELEVATIONS BEFORE I WOULD PASS IT. STEVE INDICATED HE UNDERSTOOD AND WAS GOING TO GET THE REQUIRED STEPS TAKEN CARE OF BEFORE RESUBMITTING HIS NEW FINAL SURVEY. Inspector Notes from Inspection 9200 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS.
ROW- PROJECT STATUS 08/09/2024 APPROVED - AS NOTED FSLADISH
Note: 8/8/24 SPOKE WITH STEVE FROM CM CUSTOM POOLS AND DICUSSED OPTIONS TO MOVE FORWARD. ONE OF THE OPTIONS WAS TO SHED WATER IN THE REAR OFF OF POOL TO THE RIGHT SIDE REAR JUST OFF THE STRUCTURE AND PLACE A DRAINAGE BOX IN THE LOWEST SPOT AND MUVE IT FORWARD TO AN AREA TO DISPERSE IT THRU A POP UP THAT WILL ALLOW POSITIVE DRAINAGE FLOW TO THE FRONT SWALE. LET HIM KNOW WE WOULD BE HAPPY TO COME OUT AND TAKE A LOOK AT HIS CORRECTION BEFORE IT IS FINISHED TO DETERMINE IF IT WILL WORK AND MEET COPC DRAINAGE STANDARDS.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/13/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 6/13/24 PLEASE READ ALL PREVIOUS NOTES. YOUR FINAL SURVEY STILL SHOWS DRAINAGE COMING OFF THE POOL DECK AND CONTINUING TO THE REAR AND ONTO THE ADJOINING PROPERTY. ADVERSE DRAINAGE ONTO EXISTING ADJACENT PROPERTIES IS NOT ALLOWED. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 4/3/2024 - PREVIOUS INSPECTION NOTES 04/03/24 THE LTEST SURVEY STILL SHOWS FLOW WITH ARROWS AND ELEVATIONS THAT CONTRADICT THE SITE PLAN. THIS DRAINAGE DOES NOT FOLLOW THE MINIMUM STANDARDS SET BY THE CITY. SEE PREVIOUS NOTE WITH TECH CODE ATTACHED. --------------------------------------------------------------------------------------------------------------------------- 3/5/2024 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY DOESN'T CAPTURE THE DRAINAGE PATTERN BEHIND THE POOL SUREYOR NEEDS TO CAPTURE ALL DRAINAGE PROPERLY. Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. ----------------------------------------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/03/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 04/03/24 THE LTEST SURVEY STILL SHOWS FLOW WITH ARROWS AND ELEVATIONS THAT CONTRADICT THE SITE PLAN. THIS DRAINAGE DOES NOT FOLLOW THE MINIMUM STANDARDS SET BY THE CITY. SEE PREVIOUS NOTE WITH TECH CODE ATTACHED. --------------------------------------------------------------------------------------------------------------------------- 3/5/2024 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY DOESN'T CAPTURE THE DRAINAGE PATTERN BEHIND THE POOL SUREYOR NEEDS TO CAPTURE ALL DRAINAGE PROPERLY. Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. ----------------------------------------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/05/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE FINAL SURVEY DOESN'T CAPTURE THE DRAINAGE PATTERN BEHIND THE POOL SUREYOR NEEDS TO CAPTURE ALL DRAINAGE PROPERLY. Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. ----------------------------------------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/23/2024 Disapproved - NO FEE FSLADISH
Note: 2/23/24 YOUR SITE PLAN SHOWS THE WATER SHEDDING OFF THE POOL IN THE REAR LEFT AND RIGHT MOVING AROUND THE CORNER FROM REAR TO FRONT AS REQUIRED. YOUR ELEVATION NUMBERS SHOW THE WATER FLOWING TO THE REAR AND THEN AS THE NUMBERS AND YOUR ARROWS ON THE SURVEY SHOW THE LEFT AND RIGHT SIDE AT THE CORNER FLOW TO THE REAR NOT FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SITE PLAN. AS A COURTESY I AM NOT GOING TO FEE YOU TODAY BUT YOU WILL NEED TO MATCH YOUR SITE PLAN DRAINAGE WITH FIELD ELEVATIONS THAT SHOW POSITIVE FLOW FROM REAR TO FRONT. 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/23/2024 Disapproved - NO FEE FSLADISH
Note: 1/23/24 survey shows all drainage in the rear flowing to the back. Drainage must flow from rear to front as required by the COPC drainage specifications
ELECTRIC AND ALARM 12/05/2023 APPROVED - AS NOTED RMARTIN
Note: test alarm on final
POOL DECK 10/18/2023 APPROVED BTAYLOR
POOL DECK 10/17/2023 CANCELLED BY APPLICANT WEB
STEEL AND GROUND 08/28/2023 APPROVED BTAYLOR

Review History

Department Status Date In Date Out
BADMIN INFORMATION 04/01/2024 04/01/2024
Note: Marked INFORMATION By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM We can't accept the Final Survey because the NOC is expired. Please submit a new or re-recorded NOC.
ZON COMPLETE 07/26/2023 07/26/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 07/11/2023 07/11/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Screen plans still do not match pool and all of its plans there for the permit may not be released.
ZON HOLD 06/28/2023 06/28/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Pool permit will not be released until pool enclosure corrections are met. Please make sure the dimension of the pool deck match wtih the screen enclosure plans and the site plan as well.
SW1 COMPLETE 06/28/2023 07/10/2023
Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM
ZON HOLD 06/22/2023 06/23/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Pool permit will not be released until pool enclosure corrections are met. Please make sure the dimension of the pool deck match wtih the screen enclosure plans and the site plan as well.
SW1 HOLD 06/22/2023 06/26/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROWS TO SHOW DRAINAGE OF LOT
BLD COMPLETE 06/22/2023 06/26/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 06/11/2023 06/12/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM There is an original final survey on file and according to the 23.33" in the rear setback your proposed deck does not meet the 6.5' setback you are giving me on the site plan. Please make your deck smaller to fit the setbacks .
SW1 HOLD 06/11/2023 06/14/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROWS
ZON HOLD 05/15/2023 05/16/2023
Note: Held By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM 1. Provide ALL deck dimensions on the site plan to match pool plan. Repeat Comment: 2. Pool permit approval pending screen enclosure permit.
SW1 COMPLETE 05/15/2023 05/23/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
BLD COMPLETE 05/15/2023 05/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/14/2023 04/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 04/14/2023 04/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 04/14/2023 04/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/14/2023 04/20/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED FLOW ARROW TO SHOW DRAINAGE
ZON HOLD 04/14/2023 04/18/2023
Note: Held By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM 1. Pool permit approval pending screen enclosure permit. 2. Minimum rear setback is 6.5'

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 08/15/2024
EXTENSION ¤40.00 07/24/2024
INSPECTION- POOL ¤160.00 08/03/2023
PLAN REVIEW - RESIDENTIAL ¤65.00 08/03/2023
SURCHARGE FS 533.721 ¤2.00 08/03/2023
SURCHARGE - FS 468.631 ¤2.00 08/03/2023
SW ENG INSPECTION 40 ¤40.00 08/03/2023
SW ENG - REVIEW 20 ¤20.00 08/03/2023
SITE PLAN 30 ¤30.00 08/03/2023
ADJUSTMENT 50% (¤127.50) 08/03/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/03/2023
Fees Total Due: ¤0.00 Total Paid: ¤281.50