I want to search for...
Permit #2023041002
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7029-00490-0010 |
| Block: 00490 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: (386)527-6203 |
| Location Address: 28 RYKILL WAY |
| Type: PO - POOL |
| Issue Date: 05/09/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN ROBERT LENOIS |
| Owner: COREY SHELDON & DENISE H&W |
|
Address 28 RYKILL WAY PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤58,867.00 |
| Job Description: POOL W/SCREEN ENCLOSURE |
| Type: CN |
Contractor
ARTESIAN POOLS OF EAST FLORIDA, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
762 S NOVA ROAD DAYTONA BEACH , FL 32114 |
CPC1456573 (Exp: 08/31/2026) | (386)586-5569 | (386)258-3702 |
Sub Contractors
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
BRIAN THOMAS KULL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
18 STRAFORD PLACE PORT ORANGE, FL 32128 |
CGC1504924 (Exp: 08/31/2026) | 386-682-9554 | (386)258-8042 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 02/21/2024 | FINAL APPROVED | FWILLIS |
| Note: 11/7/23 The pentair electrical panel has not been bonded as listed below. Check for correction at final | |||
| U -UTILITY RESIDENTIAL FINAL | 02/21/2024 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 02/20/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/16/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/16/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 02/16/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC AND ALARM | 11/07/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 11/7/23 The pentair electrical panel has not been bonded as listed below. Check for correction at final. 10/25/2023 - PREVIOUS INSPECTION NOTES 10/25/23 The pool pump the electrical panel box, and the screen lania all need to be bonded to the 8 awg cu. coming from the steel and ground. Unable to locate the any bonding wire. | |||
| ELECTRIC AND ALARM | 10/25/2023 | Disapproved - NO FEE | JWALKER |
| Note: 10/25/23 The pool pump the electrical panel box, and the screen lania all need to be bonded to the 8 awg cu. coming from the steel and ground. Unable to locate the any bonding wire. | |||
| POOL DECK | 07/19/2023 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2600 5/18/23 met the contractor on site on 5/17/23 on to pour 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/23 : 1). Plans call for concrete steps which require the rebar re-inforcement to meet the stair pattern & be built into the stairs with the 3" minimum clearance on top and bottom. Angled rebar is not an approved application. 2). Swim out area was required to have undisturbed soil per the plans. Since the soil has been removed, you will need to seal (or overlap) wire encased backer boards at seams & openings to contain cement during pour. | |||
| POOL DECK | 07/19/2023 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2600 5/18/23 met the contractor on site on 5/17/23 on to pour 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/23 : 1). Plans call for concrete steps which require the rebar re-inforcement to meet the stair pattern & be built into the stairs with the 3" minimum clearance on top and bottom. Angled rebar is not an approved application. 2). Swim out area was required to have undisturbed soil per the plans. Since the soil has been removed, you will need to seal (or overlap) wire encased backer boards at seams & openings to contain cement during pour. | |||
| POOL DECK | 07/19/2023 | APPROVED | JWALKER |
| Note: New inspection due to canceled inspection New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 2600 5/18/23 met the contractor on site on 5/17/23 on to pour 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/23 : 1). Plans call for concrete steps which require the rebar re-inforcement to meet the stair pattern & be built into the stairs with the 3" minimum clearance on top and bottom. Angled rebar is not an approved application. 2). Swim out area was required to have undisturbed soil per the plans. Since the soil has been removed, you will need to seal (or overlap) wire encased backer boards at seams & openings to contain cement during pour. | |||
| POOL DECK | 06/27/2023 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2600 5/18/23 met the contractor on site on 5/17/23 on to pour 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/23 : 1). Plans call for concrete steps which require the rebar re-inforcement to meet the stair pattern & be built into the stairs with the 3" minimum clearance on top and bottom. Angled rebar is not an approved application. 2). Swim out area was required to have undisturbed soil per the plans. Since the soil has been removed, you will need to seal (or overlap) wire encased backer boards at seams & openings to contain cement during pour. | |||
| STEEL AND GROUND | 05/18/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: 5/18/23 met the contractor on site on 5/17/23 on to pour 5/15/2023 - PREVIOUS INSPECTION NOTES 5/15/23 : 1). Plans call for concrete steps which require the rebar re-inforcement to meet the stair pattern & be built into the stairs with the 3" minimum clearance on top and bottom. Angled rebar is not an approved application. 2). Swim out area was required to have undisturbed soil per the plans. Since the soil has been removed, you will need to seal (or overlap) wire encased backer boards at seams & openings to contain cement during pour. | |||
| STEEL AND GROUND | 05/15/2023 | Disapproved - NO FEE | RSIMS |
| Note: 5/15/23 : 1). Plans call for concrete steps which require the rebar re-inforcement to meet the stair pattern & be built into the stairs with the 3" minimum clearance on top and bottom. Angled rebar is not an approved application. 2). Swim out area was required to have undisturbed soil per the plans. Since the soil has been removed, you will need to seal (or overlap) wire encased backer boards at seams & openings to contain cement during pour. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/02/2023 | 05/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/02/2023 | 05/09/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Flow arrows added. Elevations should also be included to show the drainage pattern. Final survey must have the elevation shots every 20 ft showing that storm water drainage after the pool is completed will drain since the original drainage pattern has been altered. | |||
| BLD | HOLD | 04/19/2023 | 04/20/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Provide note on plan that any glazing 60 inches or less from water’s edge measured in a straight line and with bottom exposed edge of glazing less than 60 inches vertically above any standing or walking surface will be tempered glass before pool final inspection per R308.4.5. | |||
| ELEC | COMPLETE | 04/19/2023 | 04/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/19/2023 | 04/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/19/2023 | 04/25/2023 |
| Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM Lot drainage features and patterns must be clearly depicted and include flow arrows. | |||
| ZON | COMPLETE | 04/19/2023 | 04/20/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤127.50) | 05/09/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/09/2023 |
| INSPECTION- POOL | ¤160.00 | 05/09/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 05/09/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/09/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/09/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 05/09/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/09/2023 |
| SITE PLAN 30 | ¤30.00 | 05/09/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤221.50 |