Permit #2023041078
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7037-00630-0070 |
| Block: 00630 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-236-9610 |
| Location Address: 42 LINDSAY DR |
| Type: PO - POOL |
| Issue Date: 05/23/2023 |
| NOC: RECORDED |
| Applicant name: SAMANTHA JESSICA ALEXANDER |
| Owner: LORSHBAUGH ROY LEE & YAJAYRA GESENIA H&W |
|
Address 42 LINDSAY DRIVE PALM COAST, FL 32137 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤93,000.00 |
| Job Description: swimming pool & enclosure |
| Type: CN |
Contractor
AGUA POOLS AND SPA INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3438 LONGLEAF ROAD , |
CPC1459907 (Exp: 08/31/2026) | 386-492-6910 |
Sub Contractors
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1410 RIDGEWOOD AVE HOLLY HILL, FL 32117 |
EC13011552 (Exp: 08/31/2026) | 386-236-9610 |
CHRISTOPHER DEAN BAZZLE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
400 B 8TH ST , 0 |
CRC1333793 (Exp: 08/31/2026) | 386-492-6910 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 09/28/2023 | FINAL APPROVED | JSTEWART |
| U -UTILITY RESIDENTIAL FINAL | 09/27/2023 | FINAL APPROVED | DHANEY |
| ROW - DRAINAGE | 09/26/2023 | APPROVED | RGROSS |
| Note: 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER NEED TO ADD A SILT FENCE IN THE BOTTON OF THE SWALE TO PREVENT SEDIMENT TRAVEL TO THE CITY DITCH LINE .INSPECTOR BE BACK ON 7/26/23 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER ** BUILDER ALSO NEEDS TO UTILIZE AN EROSION CONTROL DEVICE SILT FENCE OR SOD IN THE ROW TO PREVENT FURTHER EROSION OF MATERIAL INTO THE ROADSIDE SWALE ** FOLLOW UP INSPECTION ON 07/25/23 ______________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER ** FOLLOW UP INSPECTION ON 07/24/23 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/17/23=Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 7/21/23 | |||
| ROW - FINAL INSPECTION | 09/26/2023 | APPROVED | RGROSS |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/26/2023 | APPROVED | RGROSS |
| Note: 9/19/2023 - PREVIOUS INSPECTION NOTES ** 09/19/23 NEED TO SUBMIT A COMPLETE FINAL SURVEY YOUR IS CUT OFF ON THE RIGHT SIDE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/19/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/19/23 NEED TO SUBMIT A COMPLETE FINAL SURVEY YOUR IS CUT OFF ON THE RIGHT SIDE | |||
| ELECTRIC AND ALARM | 08/02/2023 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC AND ALARM | 08/02/2023 | APPROVED | JSTEWART |
| ROW - DRAINAGE | 07/25/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 7/25/23= BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER NEED TO ADD A SILT FENCE IN THE BOTTON OF THE SWALE TO PREVENT SEDIMENT TRAVEL TO THE CITY DITCH LINE .INSPECTOR BE BACK ON 7/26/23 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER ** BUILDER ALSO NEEDS TO UTILIZE AN EROSION CONTROL DEVICE SILT FENCE OR SOD IN THE ROW TO PREVENT FURTHER EROSION OF MATERIAL INTO THE ROADSIDE SWALE ** FOLLOW UP INSPECTION ON 07/25/23 ______________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER ** FOLLOW UP INSPECTION ON 07/24/23 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/17/23=Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 7/21/23 | |||
| ROW - DRAINAGE | 07/24/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/24/23 BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER ** BUILDER ALSO NEEDS TO UTILIZE AN EROSION CONTROL DEVICE SILT FENCE OR SOD IN THE ROW TO PREVENT FURTHER EROSION OF MATERIAL INTO THE ROADSIDE SWALE ** FOLLOW UP INSPECTION ON 07/25/23 _______________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER ** FOLLOW UP INSPECTION ON 07/24/23 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/17/23=Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 7/21/23 | |||
| ROW - DRAINAGE | 07/21/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/21/23 BUILDER NEEDS TO REMOVE DIRT AND SEDIMENT THAT HAS WASHED INTO THE CULVERT WHICH IS RESTRICTING THE FLOW OF STORMWATER ** FOLLOW UP INSPECTION ON 07/24/23 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/17/23=Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 7/21/23 | |||
| ROW - DRAINAGE | 07/17/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 7/17/23=Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every day or installing a temporary pipe and maintaining it to allow for drainage. Next inspection 7/21/23 | |||
| POOL DECK | 06/30/2023 | APPROVED | FWILLIS |
| STEEL AND GROUND | 06/07/2023 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 05/17/2023 | 05/17/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/17/2023 | 05/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/10/2023 | 05/11/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Pool enclosure Plans Screen plans need to be corrected as they still read 22' 8 ". Please correct to mach the new plans | |||
| MECH | COMPLETE | 05/10/2023 | 05/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/10/2023 | 05/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/10/2023 | 05/15/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/10/2023 | 05/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/10/2023 | 05/10/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For future submittals please be sure to name your files correctly (we corrected these) | |||
| ZON | HOLD | 05/02/2023 | 05/02/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM 2. The final survey on file shows that the actual rear setback from the house is 29.1' therefore your pool deck and screen enclosure must be reduced in size in order to meet the minimum required 6.5' rear setback. What you are proposing is a 6.3' rear setback which does not meet the rquired minimum | |||
| MECH | HOLD | 05/02/2023 | 05/02/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Upload new manufacturers specs without pool heater | |||
| SW1 | COMPLETE | 05/02/2023 | 05/09/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/02/2023 | 05/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/20/2023 | 04/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/20/2023 | 04/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/20/2023 | 04/24/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Specs submited show a gas heater. Pool plan says prewire only. Clarify what is being done. Provide gas riser diagram and list gas subcontractor or put note on plans "Gas By Others" | |||
| SW1 | HOLD | 04/20/2023 | 04/27/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLOW ARROWS FOR NEW DRAINAGE PATTERN | |||
| ZON | HOLD | 04/20/2023 | 04/21/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. There is a final survey available for this house. You must use this survey as your site plan for the proposed pool. If you require a copy, please contact zoning at 986-3751. Otherwise, you will find it on the building portal in the permit for the house. 2. The final survey on file shows that the actual rear setback from the house is 29.1' therefore your pool deck and screen enclosure must be reduced in size in order to meet the minimum required 6.5' rear setback. What you are proposing is a 6.1' rear setback which does not meet the rquired minimum. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/27/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 05/23/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/23/2023 |
| SITE PLAN 30 | ¤30.00 | 05/23/2023 |
| ADJUSTMENT 50% | (¤131.27) | 05/23/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/23/2023 |
| INSPECTION- POOL | ¤160.00 | 05/23/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤72.54 | 05/23/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/23/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/23/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤325.27 |