I want to search for...
Permit #2023050026
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00250-0140 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00250 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 832-726-2202 |
| Location Address: 34 FARNELL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/05/2023 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: ZZMZ CASPIAN LLC |
|
Address 1802 N. ALAFAYA TRAIL ORLANDO, FL 32826 |
|
Address #162 ORLANDO, FL 32826 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
ALEKSANDRA LUSHI
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
9360 CRAVEN RD JACKSONVILLE, FL 32257 |
APT 401 JACKSONVILLE, FL 32257 |
CAC1820975 (Exp: 08/31/2026) | 904-338-8522 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/26/2024 | FINAL APPROVED | JWALKER |
| Note: 3/22/2024 - PREVIOUS INSPECTION NOTES 3/22/24- 1. Exterior Garage Lights have temp covers, Please install weather proof covers or Lights. NEC 406.6, 2. Please secure exhaust vents to soffits. 3. Please seal/cap dryer duct (unless dryer is installed). M1502.4.7 Exhaust duct required.....Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates 4. Please install covers at Junction boxes each side of garage door. 5. Please secure power flex conduit to the entry of the Hot water tank. 6. Please install anchors at Garage door Bucks Per plans A5. 7. Please install Lanai Light for exit Illumination for SGD. FBC R3903.3 EXTERIOR DOOR LIGHTS 8. Please remove debri from all Lavatory overflow drains. 3/18/2024 - PREVIOUS INSPECTION NOTES 03-18-2024 1. Bathroom GFCI connected to lanai GFCI outlet. NEC 210.11(C)3 2. Approved drawigs not on site. 3. D.W not working. 4. Garage door does not open. Inspection stopped. | |||
| BLD - BUILDING FINAL | 03/22/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 3/22/24- 1. Exterior Garage Lights have temp covers, Please install weather proof covers or Lights. NEC 406.6, 2. Please secure exhaust vents to soffits. 3. Please seal/cap dryer duct (unless dryer is installed). M1502.4.7 Exhaust duct required.....Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates 4. Please install covers at Junction boxes each side of garage door. 5. Please secure power flex conduit to the entry of the Hot water tank. 6. Please install anchors at Garage door Bucks Per plans A5. 7. Please install Lanai Light for exit Illumination for SGD. FBC R3903.3 EXTERIOR DOOR LIGHTS 8. Please remove debri from all Lavatory overflow drains. 3/18/2024 - PREVIOUS INSPECTION NOTES 03-18-2024 1. Bathroom GFCI connected to lanai GFCI outlet. NEC 210.11(C)3 2. Approved drawigs not on site. 3. D.W not working. 4. Garage door does not open. Inspection stopped. | |||
| BLD - BUILDING FINAL | 03/18/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 03-18-2024 1. Bathroom GFCI connected to lanai GFCI outlet. NEC 210.11(C)3 2. Approved drawigs not on site. 3. D.W not working. 4. Garage door does not open. Inspection stopped. | |||
| ROW - STORMWATER FINAL | 03/15/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/15/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ____________________________________________________________________________________________________________________________ See not on Final Survey | |||
| U -UTILITY RESIDENTIAL FINAL | 03/01/2024 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 03/01/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/28/2024 | APPROVED | GBERTOLA |
| Note: 2/27/24= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 2/14/2024 - PREVIOUS INSPECTION NOTES THE FINAL DID NOT CAPTURE THE DRAINAGE IN THE BACK CORRECTLY SURVEYOR NEEDS TO CAPTURE THE DRAINAGE CORRECTLY -------------------------------------------------------------------------------- NOTE TO INSPECTOR: Left side grade is graded with a swale 3 ft inside the property line and not on the property line as shown by the Final Survey. Water will have to flow from the existing high lot onto the drainage conveyance inside the new home property line but still in the easement. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/28/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/14/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FINAL DID NOT CAPTURE THE DRAINAGE IN THE BACK CORRECTLY SURVEYOR NEEDS TO CAPTURE THE DRAINAGE CORRECTLY -------------------------------------------------------------------------------- NOTE TO INSPECTOR: Left side grade is graded with a swale 3 ft inside the property line and not on the property line as shown by the Final Survey. Water will have to flow from the existing high lot onto the drainage conveyance inside the new home property line but still in the easement. | |||
| ELECTRIC - EARLY POWER | 01/26/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 10 am | |||
| ROW- PROJECT STATUS | 01/17/2024 | APPROVED | EMADISON |
| Note: ** 01/17/24 MET WITH CM ON SITE DISCUSSING HIS CONCERNS FOR GRADING PROPERTY | |||
| ROW- PRE-APRON (PRE-POUR) | 12/01/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/01/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ______________________________________________________________________________________________________________________ 11/30/2023 - PREVIOUS INSPECTION NOTES 11/30/2023 11/28/23 ** TOO MUCH WATER CULVERT AND FOOTER IS FULL OF WATER ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ______________________________________________________________________________ 11/28/2023 - PREVIOUS INSPECTION NOTES ** 11/28/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/30/2023 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11/30/2023 11/28/23 ** TOO MUCH WATER CULVERT AND FOOTER IS FULL OF WATER ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ______________________________________________________________________________ 11/28/2023 - PREVIOUS INSPECTION NOTES ** 11/28/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/28/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/28/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/22/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 11/15/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS | |||
| U-CROSS CONNECTION | 10/23/2023 | APPROVED | DHANEY |
| U - SEWER TIE IN | 10/23/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 AT LEFT SIDE OF GARGE FOOTER REMOVE ROOT BY A/C CHACE. WILL CHECK AT SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 10/23/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 AT LEFT SIDE OF GARGE FOOTER REMOVE ROOT BY A/C CHACE. WILL CHECK AT SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 10/02/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 Mechanical layout and energy calcs not on site. 09-25-2023 Please have the Approved Energy Calcs and mechanical layout on site. . DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. Check at next inspection. | |||
| ELECTRIC-TUG | 09/26/2023 | APPROVED | AGAETANO |
| ALL ROUGH | 09/25/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 Mechanical layout and energy calcs not on site. 09-25-2023 Please have the Approved Energy Calcs and mechanical layout on site. . DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. Check at next inspection. | |||
| ALL ROUGH | 09/20/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 09-20-2023 Mechanical layout and energy calcs not on site. | |||
| LATH/BRICK/ WATER BARRIER | 09/15/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/13/2023 | APPROVED | AGAETANO |
| Note: 9/12/2023 - PREVIOUS INSPECTION NOTES 9/8/2023 - PREVIOUS INSPECTION NOTES 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. 09-08-2023 1. Truss layout is dirty, ripped, and not able to read. 2. Shiners throughtout. Check all. 09-12-2023 Truss layout is too small to read. 8 1/2" x 11" is too small.Please provide a large readable drawing for all inspections to avoid any future fees. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/12/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 9/8/2023 - PREVIOUS INSPECTION NOTES 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. 09-08-2023 1. Truss layout is dirty, ripped, and not able to read. 2. Shiners throughtout. Check all. 09-12-2023 Truss layout is too small to read. 8 1/2" x 11" is too small.Please provide a large readable drawing for all inspections to avoid any future fees. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/08/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. 09-08-2023 1. Truss layout is dirty, ripped, and not able to read. 2. Shiners throughtout. Check all. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/06/2023 | Disapproved - NO FEE | FWILLIS |
| Note: 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. | |||
| ROOF VALLEY & METAL | 09/06/2023 | APPROVED | FWILLIS |
| WALL SHEATHING | 08/15/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/15/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/09/2023 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 08/01/2023 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 07/21/2023 | APPROVED | AGAETANO |
| Note: 7/20/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 Compaction test not on site. Termite bond not posted. Inspection stopped. | |||
| MONOLITHIC SLAB | 07/20/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 Compaction test not on site. Termite bond not posted. Inspection stopped. | |||
| MONOLITHIC SLAB | 07/18/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 07-18-2023 Compaction test not on site. Termite bond not posted. Inspection stopped. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/17/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: AT LEFT SIDE OF GARGE FOOTER REMOVE ROOT BY A/C CHACE. WILL CHECK AT SLAB INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 07/06/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/18/2023 | 10/19/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/12/2023 | 10/13/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| ENGIN1 | COMPLETE | 08/09/2023 | 08/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/09/2023 | 08/09/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/16/2023 | 05/16/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes only for stormwater | |||
| SW1 | COMPLETE | 05/16/2023 | 05/23/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/16/2023 | 05/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO SITE PLAN.PDF | |||
| ENGIN1 | COMPLETE | 05/16/2023 | 05/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/15/2023 | 05/15/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM L.Land Development Code Technical Manual, Section 300, Drawing 300.E, Note 5 Culvert material and size to be depicted. Typical is 17X13 CMP | |||
| SW1 | HOLD | 05/10/2023 | 05/15/2023 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM need to provide the proposed culvert detail info ( invert ) and what type of culvert | |||
| BLD | COMPLETE | 05/10/2023 | 05/11/2023 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 05/10/2023 | 05/10/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/10/2023 | 05/10/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM changes made for stormwater | |||
| BLD | COMPLETE | 05/01/2023 | 05/06/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/01/2023 | 05/03/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/01/2023 | 05/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/01/2023 | 05/02/2023 |
| LOCATE | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/01/2023 | 05/09/2023 |
| Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Missing the proposed Driveway culvert with size and proposed elevations. All proposed drainage features must be depicted on the site plan. | |||
| ZON | COMPLETE | 05/01/2023 | 05/01/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/01/2023 | 05/06/2023 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 05/01/2023 | 05/03/2023 |
| Note: Released By: CAROL MINI - - CJMINI@PALMCOASTGOV.COM CJM 5/3/2023 No Gopher Tortoise burrows were found on property. Staff recommends installing silt fence so no GT's enter the property prior to construction commencing. | |||
| SWALE | COMPLETE | 05/01/2023 | 06/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/26/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/26/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/26/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/26/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/26/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/26/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/26/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/05/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/05/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/05/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/05/2023 |
| SEWER INSPECTION | ¤25.00 | 06/05/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/05/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/05/2023 |
| SITE PLAN 30 | ¤30.00 | 06/05/2023 |
| WATER- TURN ON | ¤25.00 | 06/05/2023 |
| ADJUSTMENT 50% | (¤366.24) | 06/05/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/05/2023 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 06/05/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 06/05/2023 |
| CONNECTION FEES | ¤1,166.26 | 06/05/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/05/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/05/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/05/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/05/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/05/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/05/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/05/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/05/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/05/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/05/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/05/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/05/2023 |
| SURCHARGE FS 533.721 | ¤2.47 | 06/05/2023 |
| SURCHARGE - FS 468.631 | ¤3.71 | 06/05/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/05/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/05/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/05/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,474.54 |