Permit #2023050026

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00250-0140
CONDITIONED SPACE: 1555 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2201 sqft
Block: 00250
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 832-726-2202
Location Address: 34 FARNELL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/05/2023
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: ZZMZ CASPIAN LLC

Address

1802 N. ALAFAYA TRAIL

ORLANDO, FL 32826

Address

#162

ORLANDO, FL 32826

Lot: 0140
Contracted Stated Job Value: ¤131,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

ALEKSANDRA LUSHI
Status Location Address Mailing Address State License Number Phone
INACTIVE

9360 CRAVEN RD

JACKSONVILLE, FL 32257

APT 401

JACKSONVILLE, FL 32257

CAC1820975 (Exp: 08/31/2026) 904-338-8522
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/26/2024 FINAL APPROVED JWALKER
Note: 3/22/2024 - PREVIOUS INSPECTION NOTES 3/22/24- 1. Exterior Garage Lights have temp covers, Please install weather proof covers or Lights. NEC 406.6, 2. Please secure exhaust vents to soffits. 3. Please seal/cap dryer duct (unless dryer is installed). M1502.4.7 Exhaust duct required.....Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates 4. Please install covers at Junction boxes each side of garage door. 5. Please secure power flex conduit to the entry of the Hot water tank. 6. Please install anchors at Garage door Bucks Per plans A5. 7. Please install Lanai Light for exit Illumination for SGD. FBC R3903.3 EXTERIOR DOOR LIGHTS 8. Please remove debri from all Lavatory overflow drains. 3/18/2024 - PREVIOUS INSPECTION NOTES 03-18-2024 1. Bathroom GFCI connected to lanai GFCI outlet. NEC 210.11(C)3 2. Approved drawigs not on site. 3. D.W not working. 4. Garage door does not open. Inspection stopped.
BLD - BUILDING FINAL 03/22/2024 Disapproved -FEE REQUIRED JSTEWART
Note: 3/22/24- 1. Exterior Garage Lights have temp covers, Please install weather proof covers or Lights. NEC 406.6, 2. Please secure exhaust vents to soffits. 3. Please seal/cap dryer duct (unless dryer is installed). M1502.4.7 Exhaust duct required.....Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates 4. Please install covers at Junction boxes each side of garage door. 5. Please secure power flex conduit to the entry of the Hot water tank. 6. Please install anchors at Garage door Bucks Per plans A5. 7. Please install Lanai Light for exit Illumination for SGD. FBC R3903.3 EXTERIOR DOOR LIGHTS 8. Please remove debri from all Lavatory overflow drains. 3/18/2024 - PREVIOUS INSPECTION NOTES 03-18-2024 1. Bathroom GFCI connected to lanai GFCI outlet. NEC 210.11(C)3 2. Approved drawigs not on site. 3. D.W not working. 4. Garage door does not open. Inspection stopped.
BLD - BUILDING FINAL 03/18/2024 Disapproved - NO FEE AGAETANO
Note: 03-18-2024 1. Bathroom GFCI connected to lanai GFCI outlet. NEC 210.11(C)3 2. Approved drawigs not on site. 3. D.W not working. 4. Garage door does not open. Inspection stopped.
ROW - STORMWATER FINAL 03/15/2024 APPROVED - AS NOTED FSLADISH
Note: 3/15/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ____________________________________________________________________________________________________________________________ See not on Final Survey
U -UTILITY RESIDENTIAL FINAL 03/01/2024 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 03/01/2024 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/28/2024 APPROVED GBERTOLA
Note: 2/27/24= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 2/14/2024 - PREVIOUS INSPECTION NOTES THE FINAL DID NOT CAPTURE THE DRAINAGE IN THE BACK CORRECTLY SURVEYOR NEEDS TO CAPTURE THE DRAINAGE CORRECTLY -------------------------------------------------------------------------------- NOTE TO INSPECTOR: Left side grade is graded with a swale 3 ft inside the property line and not on the property line as shown by the Final Survey. Water will have to flow from the existing high lot onto the drainage conveyance inside the new home property line but still in the easement.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/28/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/14/2024 Disapproved - NO FEE PFLANAGAN
Note: THE FINAL DID NOT CAPTURE THE DRAINAGE IN THE BACK CORRECTLY SURVEYOR NEEDS TO CAPTURE THE DRAINAGE CORRECTLY -------------------------------------------------------------------------------- NOTE TO INSPECTOR: Left side grade is graded with a swale 3 ft inside the property line and not on the property line as shown by the Final Survey. Water will have to flow from the existing high lot onto the drainage conveyance inside the new home property line but still in the easement.
ELECTRIC - EARLY POWER 01/26/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 10 am
ROW- PROJECT STATUS 01/17/2024 APPROVED EMADISON
Note: ** 01/17/24 MET WITH CM ON SITE DISCUSSING HIS CONCERNS FOR GRADING PROPERTY
ROW- PRE-APRON (PRE-POUR) 12/01/2023 APPROVED - AS NOTED EMADISON
Note: ** 12/01/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ______________________________________________________________________________________________________________________ 11/30/2023 - PREVIOUS INSPECTION NOTES 11/30/2023 11/28/23 ** TOO MUCH WATER CULVERT AND FOOTER IS FULL OF WATER ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ______________________________________________________________________________ 11/28/2023 - PREVIOUS INSPECTION NOTES ** 11/28/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 11/30/2023 Disapproved -FEE REQUIRED TPOLACEK
Note: 11/30/2023 11/28/23 ** TOO MUCH WATER CULVERT AND FOOTER IS FULL OF WATER ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ______________________________________________________________________________ 11/28/2023 - PREVIOUS INSPECTION NOTES ** 11/28/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 11/28/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/28/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 11/22/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/22/23 BUILDER NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE FOR INSPECTOR TO GET THE BENCH MARK ELEVATION FOR THE CULVERT ELEVATION ** SITE IS TOO SOFT FOOT SINKING UP TO 4-5 INCHES IN THE MUD ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** TOO MUCH WATER IN POUR AREA _________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS
ROW- PRE-APRON (PRE-POUR) 11/15/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/15/23 SITE IS TOO SOFT AND TOO WET TO POUR NOT READY FOR INSPERCTION CULVERT PIPE IS FULL OF WATER ** FOOT SINKS OVER 6 INCHES IN MUD ** SEE ATTACHED PHOTOS
U-CROSS CONNECTION 10/23/2023 APPROVED DHANEY
U - SEWER TIE IN 10/23/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 AT LEFT SIDE OF GARGE FOOTER REMOVE ROOT BY A/C CHACE. WILL CHECK AT SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 10/23/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 AT LEFT SIDE OF GARGE FOOTER REMOVE ROOT BY A/C CHACE. WILL CHECK AT SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION
INSULATION 10/02/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 Mechanical layout and energy calcs not on site. 09-25-2023 Please have the Approved Energy Calcs and mechanical layout on site. . DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. Check at next inspection.
ELECTRIC-TUG 09/26/2023 APPROVED AGAETANO
ALL ROUGH 09/25/2023 APPROVED - AS NOTED AGAETANO
Note: 9/20/2023 - PREVIOUS INSPECTION NOTES 09-20-2023 Mechanical layout and energy calcs not on site. 09-25-2023 Please have the Approved Energy Calcs and mechanical layout on site. . DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL. Check at next inspection.
ALL ROUGH 09/20/2023 Disapproved - NO FEE AGAETANO
Note: 09-20-2023 Mechanical layout and energy calcs not on site.
LATH/BRICK/ WATER BARRIER 09/15/2023 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/13/2023 APPROVED AGAETANO
Note: 9/12/2023 - PREVIOUS INSPECTION NOTES 9/8/2023 - PREVIOUS INSPECTION NOTES 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. 09-08-2023 1. Truss layout is dirty, ripped, and not able to read. 2. Shiners throughtout. Check all. 09-12-2023 Truss layout is too small to read. 8 1/2" x 11" is too small.Please provide a large readable drawing for all inspections to avoid any future fees.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/12/2023 Disapproved - NO FEE AGAETANO
Note: 9/8/2023 - PREVIOUS INSPECTION NOTES 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. 09-08-2023 1. Truss layout is dirty, ripped, and not able to read. 2. Shiners throughtout. Check all. 09-12-2023 Truss layout is too small to read. 8 1/2" x 11" is too small.Please provide a large readable drawing for all inspections to avoid any future fees.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/08/2023 Disapproved - NO FEE AGAETANO
Note: 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center. 09-08-2023 1. Truss layout is dirty, ripped, and not able to read. 2. Shiners throughtout. Check all.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/06/2023 Disapproved - NO FEE FWILLIS
Note: 9/6/23 - WASHERS ON BEARING WALL NOT PER PLAN, PAGE A4. 2X2X1/8" 8/15/2023 - PREVIOUS INSPECTION NOTES 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center.
ROOF VALLEY & METAL 09/06/2023 APPROVED FWILLIS
WALL SHEATHING 08/15/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/15/2023 Disapproved - NO FEE AGAETANO
Note: 08-15-2023 1. Drawings are ripped and dirty. 2. Truss layout is not readable. Please have a clean set of approved drawings on site for all inspections. 3. Ledger board detail at A5 - anchor bolts not per plan. Not 2' on center.
FOUND SURVEY APPROVED (OFFICE) 08/09/2023 APPROVED TDOAK
TIE BEAM / LINTEL 08/01/2023 APPROVED AGAETANO
MONOLITHIC SLAB 07/21/2023 APPROVED AGAETANO
Note: 7/20/2023 - PREVIOUS INSPECTION NOTES 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 Compaction test not on site. Termite bond not posted. Inspection stopped.
MONOLITHIC SLAB 07/20/2023 CANCELLED BY APPLICANT AGAETANO
Note: 7/18/2023 - PREVIOUS INSPECTION NOTES 07-18-2023 Compaction test not on site. Termite bond not posted. Inspection stopped.
MONOLITHIC SLAB 07/18/2023 Disapproved - NO FEE AGAETANO
Note: 07-18-2023 Compaction test not on site. Termite bond not posted. Inspection stopped.
PLUMBING 1ST ROUGH UNDERGROUND 07/17/2023 APPROVED - AS NOTED MGIBSON
Note: AT LEFT SIDE OF GARGE FOOTER REMOVE ROOT BY A/C CHACE. WILL CHECK AT SLAB INSPECTION
WATER METER INSTALLATION REQUEST 07/06/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 10/18/2023 10/19/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 10/12/2023 10/13/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
ENGIN1 COMPLETE 08/09/2023 08/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/09/2023 08/09/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 05/16/2023 05/16/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes only for stormwater
SW1 COMPLETE 05/16/2023 05/23/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
BADMIN INFORMATION 05/16/2023 05/16/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO SITE PLAN.PDF
ENGIN1 COMPLETE 05/16/2023 05/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 05/15/2023 05/15/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM L.Land Development Code Technical Manual, Section 300, Drawing 300.E, Note 5 Culvert material and size to be depicted. Typical is 17X13 CMP
SW1 HOLD 05/10/2023 05/15/2023
Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM need to provide the proposed culvert detail info ( invert ) and what type of culvert
BLD COMPLETE 05/10/2023 05/11/2023
Note: Released By: JPI
ENGIN1 COMPLETE 05/10/2023 05/10/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 05/10/2023 05/10/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM changes made for stormwater
BLD COMPLETE 05/01/2023 05/06/2023
Note: Released By: JPI
CUSVC COMPLETE 05/01/2023 05/03/2023
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/01/2023 05/02/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/01/2023 05/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/01/2023 05/02/2023
LOCATE COMPLETE 05/01/2023 05/02/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/01/2023 05/02/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 05/01/2023 05/09/2023
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Missing the proposed Driveway culvert with size and proposed elevations. All proposed drainage features must be depicted on the site plan.
ZON COMPLETE 05/01/2023 05/01/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 05/01/2023 05/06/2023
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM
PLENV COMPLETE 05/01/2023 05/03/2023
Note: Released By: CAROL MINI - - CJMINI@PALMCOASTGOV.COM CJM 5/3/2023 No Gopher Tortoise burrows were found on property. Staff recommends installing silt fence so no GT's enter the property prior to construction commencing.
SWALE COMPLETE 05/01/2023 06/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/26/2024
REINSPECTION RESIDENTIAL ¤40.00 03/26/2024
SW ENG REINSPECTION 20 ¤20.00 03/26/2024
SW ENG REINSPECTION 30 ¤30.00 03/26/2024
SW ENG REINSPECTION 30 ¤30.00 03/26/2024
SW ENG REINSPECTION 30 ¤30.00 03/26/2024
SW ENG REINSPECTION 30 ¤30.00 03/26/2024
SW ENG - REVIEW 20 ¤20.00 06/05/2023
SW ENG RES REVIEW 200 ¤200.00 06/05/2023
TRANS IMPACT FEE ADMIN ¤54.36 06/05/2023
TRANS IMPACT FEE ADMIN (¤54.36) 06/05/2023
SEWER INSPECTION ¤25.00 06/05/2023
SEWER CAPITAL FACILITY ¤5,344.82 06/05/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 06/05/2023
SITE PLAN 30 ¤30.00 06/05/2023
WATER- TURN ON ¤25.00 06/05/2023
ADJUSTMENT 50% (¤366.24) 06/05/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/05/2023
INSPECTION - RESIDENTIAL ¤547.25 06/05/2023
PLAN REVIEW - RESIDENTIAL ¤155.22 06/05/2023
CONNECTION FEES ¤1,166.26 06/05/2023
FIRE IMPACT FEE ADMIN ¤12.62 06/05/2023
FIRE IMPACT FEE ADMIN (¤12.62) 06/05/2023
FC IMPACT FEE EMS ¤62.00 06/05/2023
IMPACT FEE FIRE ¤420.52 06/05/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/05/2023
FC IMPACT FEE LIBRARY ¤268.00 06/05/2023
IMPACT FEE PARKS ¤1,769.15 06/05/2023
IMPACT FEE SCHOOL ¤5,450.00 06/05/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 06/05/2023
WATER -IRRIGATION INSPECTION ¤25.00 06/05/2023
PARKS IMPACT FEE ADMIN ¤53.07 06/05/2023
PARKS IMPACT FEE ADMIN (¤53.07) 06/05/2023
SURCHARGE FS 533.721 ¤2.47 06/05/2023
SURCHARGE - FS 468.631 ¤3.71 06/05/2023
SW ENG - FOUNDATION SURVEY ¤20.00 06/05/2023
SW ENG INSPECTION 80 ¤80.00 06/05/2023
SW ENG PRE APRON ¤30.00 06/05/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,474.54