I want to search for...
Permit #2023050034
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00370-0170 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00370 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 832-726-2202 |
| Location Address: 26 WHITE HALL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/05/2023 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN INVESTMENTS 1 LLC |
|
Address 1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ALEKSANDRA LUSHI
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
9360 CRAVEN RD JACKSONVILLE, FL 32257 |
APT 401 JACKSONVILLE, FL 32257 |
CAC1820975 (Exp: 08/31/2026) | 904-338-8522 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/10/2024 | FINAL APPROVED | AGAETANO |
| Note: 4/9/2024 - PREVIOUS INSPECTION NOTES 4/8/2024 - PREVIOUS INSPECTION NOTES 4/8/24: House is still locked up tight. Not Ready! Examples Only at Exterior: ODU not 3" clearance above finished grade on all sides & forms still in place / Condensate drain too close to ground (6" min) / Bathroom exhaust pipe crushed or not connected properly at soffit vent. *** Please be ready for Inspection so that resources are not wasted. 4/4/2024 - PREVIOUS INSPECTION NOTES 1. Door locked need access for inspection 2. Form boards need to be removed around ODU Checked only outside items 04-09-2024 Please seal AHU closet duct with proper sealant. | |||
| BLD - BUILDING FINAL | 04/09/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 4/8/2024 - PREVIOUS INSPECTION NOTES 4/8/24: House is still locked up tight. Not Ready! Examples Only at Exterior: ODU not 3" clearance above finished grade on all sides & forms still in place / Condensate drain too close to ground (6" min) / Bathroom exhaust pipe crushed or not connected properly at soffit vent. *** Please be ready for Inspection so that resources are not wasted. 4/4/2024 - PREVIOUS INSPECTION NOTES 1. Door locked need access for inspection 2. Form boards need to be removed around ODU Checked only outside items 04-09-2024 Please seal AHU closet duct with proper sealant. | |||
| BLD - BUILDING FINAL | 04/08/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/8/24: House is still locked up tight. Not Ready! Examples Only at Exterior: ODU not 3" clearance above finished grade on all sides & forms still in place / Condensate drain too close to ground (6" min) / Bathroom exhaust pipe crushed or not connected properly at soffit vent. *** Please be ready for Inspection so that resources are not wasted. 4/4/2024 - PREVIOUS INSPECTION NOTES 1. Door locked need access for inspection 2. Form boards need to be removed around ODU Checked only outside items | |||
| BLD - BUILDING FINAL | 04/04/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Door locked need access for inspection 2. Form boards need to be removed around ODU Checked only outside items | |||
| U -UTILITY RESIDENTIAL FINAL | 04/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 lower sewer C/O no irrigation-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/03/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/03/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/03/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/03/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U-CROSS CONNECTION | 03/22/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 02/08/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 02/02/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:30am | |||
| GRAVITY SEWER TEST | 01/17/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 01/17/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 12/19/2023 | APPROVED | BVITALE |
| INSULATION | 11/13/2023 | APPROVED | FWILLIS |
| Note: 11/7/2023 - PREVIOUS INSPECTION NOTES Previous items from all rough not corrected 1. Front double window is missing anchors per anchor layout , 6'' from corners 2. Line set chase not sealed Stopped inspection, do not call in re-inspection before previous items have been corrected | |||
| INSULATION | 11/07/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: Previous items from all rough not corrected 1. Front double window is missing anchors per anchor layout , 6'' from corners 2. Line set chase not sealed Stopped inspection, do not call in re-inspection before previous items have been corrected | |||
| LATH/BRICK/ WATER BARRIER | 10/31/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 10/31/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 10/31/23 1. Chase for line set needs to be sealed 2. Have anchoring layout for front double window Check on insulation 10/27/2023 - PREVIOUS INSPECTION NOTES 10/27/23: Please read & resolve previous notes before calling in for re-inspection. * Item 2 remains unresolved & item 4 has an anchor that is not fully embedded on the left jamb (from inside). 10/26/2023 - PREVIOUS INSPECTION NOTES 10/26/23 Repair all previous items before calling in re-inspection. Items 2 and 4 not repaired 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Duct layout does not match what is installed 2. All exhaust fan ducts must be supported every 4' 3. Failed 5' head pressure test 4. Mullbar bracket missing, anchors missing in front bedroom double window (left of front door) | |||
| ALL ROUGH | 10/27/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/27/23: Please read & resolve previous notes before calling in for re-inspection. * Item 2 remains unresolved & item 4 has an anchor that is not fully embedded on the left jamb (from inside). 10/26/2023 - PREVIOUS INSPECTION NOTES 10/26/23 Repair all previous items before calling in re-inspection. Items 2 and 4 not repaired 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Duct layout does not match what is installed 2. All exhaust fan ducts must be supported every 4' 3. Failed 5' head pressure test 4. Mullbar bracket missing, anchors missing in front bedroom double window (left of front door) | |||
| ALL ROUGH | 10/26/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 10/26/23 Repair all previous items before calling in re-inspection. Items 2 and 4 not repaired 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Duct layout does not match what is installed 2. All exhaust fan ducts must be supported every 4' 3. Failed 5' head pressure test 4. Mullbar bracket missing, anchors missing in front bedroom double window (left of front door) | |||
| ALL ROUGH | 10/20/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Duct layout does not match what is installed 2. All exhaust fan ducts must be supported every 4' 3. Failed 5' head pressure test 4. Mullbar bracket missing in front bedroom double window (left of front door) | |||
| ROW - DRAINAGE | 10/18/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: CORRECTIONS MADE AT THIS TIME IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK EVERY SITE EVERY 7DAYS OR EVERY 1/2" OF RAIN TO MAKE SURE ALL SWEEP DEVICES ARE WORKING CORRECT THE ENTIRE CONSTRUCTION PROJECT ---------------------------------------------------------------------------------- 10/17/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT --------------------------------------------------------------------------- 10/16/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT --------------------------------------------------------------------------------- 10/13/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT THERE IS NOW A INSPECTION HOLD ON THIS JOB SITE YOU HAVE HAD PLENTY OF TIME TO CORRECT ALL AREAS STATED NEXT INSPECTION 10/16/23 ---------------------------------------------------------------------- 10/6/2023 - PREVIOUS INSPECTION NOTES the builder requested to have this inpection on the10/13/23 10/2/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT 2) NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 3) NEED TO PUT SILT FENCE AROUND LOT TO KEEP SEDIMENT FROM WASHING IN TO ADJACENT LOTS NEXT INSPECTION 10/9/23 | |||
| ROW - DRAINAGE | 10/17/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT --------------------------------------------------------------------------- 10/16/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT --------------------------------------------------------------------------------- 10/13/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT THERE IS NOW A INSPECTION HOLD ON THIS JOB SITE YOU HAVE HAD PLENTY OF TIME TO CORRECT ALL AREAS STATED NEXT INSPECTION 10/16/23 ---------------------------------------------------------------------- 10/6/2023 - PREVIOUS INSPECTION NOTES the builder requested to have this inpection on the10/13/23 10/2/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT 2) NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 3) NEED TO PUT SILT FENCE AROUND LOT TO KEEP SEDIMENT FROM WASHING IN TO ADJACENT LOTS NEXT INSPECTION 10/9/23 | |||
| ROW - DRAINAGE | 10/16/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT --------------------------------------------------------------------------------- 10/13/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT THERE IS NOW A INSPECTION HOLD ON THIS JOB SITE YOU HAVE HAD PLENTY OF TIME TO CORRECT ALL AREAS STATED NEXT INSPECTION 10/16/23 ---------------------------------------------------------------------- 10/6/2023 - PREVIOUS INSPECTION NOTES the builder requested to have this inpection on the10/13/23 10/2/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT 2) NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 3) NEED TO PUT SILT FENCE AROUND LOT TO KEEP SEDIMENT FROM WASHING IN TO ADJACENT LOTS NEXT INSPECTION 10/9/23 | |||
| ROW - DRAINAGE | 10/13/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 2) STILL NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT THERE IS NOW A INSPECTION HOLD ON THIS JOB SITE YOU HAVE HAD PLENTY OF TIME TO CORRECT ALL AREAS STATED NEXT INSPECTION 10/16/23 ---------------------------------------------------------------------- 10/6/2023 - PREVIOUS INSPECTION NOTES the builder requested to have this inpection on the10/13/23 10/2/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT 2) NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 3) NEED TO PUT SILT FENCE AROUND LOT TO KEEP SEDIMENT FROM WASHING IN TO ADJACENT LOTS NEXT INSPECTION 10/9/23 | |||
| ROW - DRAINAGE | 10/09/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: the builder requested to have this inpection on the10/13/23 10/2/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT 2) NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 3) NEED TO PUT SILT FENCE AROUND LOT TO KEEP SEDIMENT FROM WASHING IN TO ADJACENT LOTS NEXT INSPECTION 10/9/23 | |||
| ROW - DRAINAGE | 10/02/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO KEEP SWALE OPEN DURING THE ENTIRE CONSTRUCTION PROJECT 2) NEED TO REMOVE PORTER JOHN OUT OF THE RIGHT OF WAY 3) NEED TO PUT SILT FENCE AROUND LOT TO KEEP SEDIMENT FROM WASHING IN TO ADJACENT LOTS NEXT INSPECTION 10/9/23 | |||
| ROOF VALLEY & METAL | 09/29/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/28/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 9/28/23: Previously listed items 1 and 3 remain unresolved. 9/26/2023 - PREVIOUS INSPECTION NOTES 9/26/23: 1). Truss T19 is missing strap. (strap is only attached to Truss T15) 2). Fitch plate at garage ledger board is incomplete. 3). Truss T25 has a web that is not repaired per MiTek requirements and is missing bracing on the same web. 9/19/2023 - PREVIOUS INSPECTION NOTES 9/19/23 1. No revision submitted and approved by Building Dept. 2. Over framing missing H2.5 clips per detai 9/15/2023 - PREVIOUS INSPECTION NOTES 9/15/23 MiTek plans address does not match house Stopped inspection 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23: Inspection stopped. Incomplete Inspection. Incomplete plans. Please walk your site before re-scheduling inspection. Examples: 1). Missing T1 - Truss page (although there are (3) A5 pages) 2). MiTek truss layout provided does not match house orientation. 3). Missing 2nd King stud (on left side of header) at garage load bearing wall as required on plan A5. 4). Need revision submitted to & approved by the City for the missing bucket on Truss T19 at 2ply truss T15. 5). Scab at Truss T05 is not secured to Truss as required at Simpson LGT2 bracket. 6). Roof sheathing needs shiners removed & nails sticking out of plywood fully nailed in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/28/2023 | APPROVED | RSIMS |
| Note: 9/28/23: Return visit to walk with Superintendent. Deficiencies resolved. 9/28/2023 - PREVIOUS INSPECTION NOTES 9/28/23: Previously listed items 1 and 3 remain unresolved. 9/26/2023 - PREVIOUS INSPECTION NOTES 9/26/23: 1). Truss T19 is missing strap. (strap is only attached to Truss T15) 2). Fitch plate at garage ledger board is incomplete. 3). Truss T25 has a web that is not repaired per MiTek requirements and is missing bracing on the same web. 9/19/2023 - PREVIOUS INSPECTION NOTES 9/19/23 1. No revision submitted and approved by Building Dept. 2. Over framing missing H2.5 clips per detai 9/15/2023 - PREVIOUS INSPECTION NOTES 9/15/23 MiTek plans address does not match house Stopped inspection 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23: Inspection stopped. Incomplete Inspection. Incomplete plans. Please walk your site before re-scheduling inspection. Examples: 1). Missing T1 - Truss page (although there are (3) A5 pages) 2). MiTek truss layout provided does not match house orientation. 3). Missing 2nd King stud (on left side of header) at garage load bearing wall as required on plan A5. 4). Need revision submitted to & approved by the City for the missing bucket on Truss T19 at 2ply truss T15. 5). Scab at Truss T05 is not secured to Truss as required at Simpson LGT2 bracket. 6). Roof sheathing needs shiners removed & nails sticking out of plywood fully nailed in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/26/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 9/26/23: 1). Truss T19 is missing strap. (strap is only attached to Truss T15) 2). Fitch plate at garage ledger board is incomplete. 3). Truss T25 has a web that is not repaired per MiTek requirements and is missing bracing on the same web. 9/19/2023 - PREVIOUS INSPECTION NOTES 9/19/23 1. No revision submitted and approved by Building Dept. 2. Over framing missing H2.5 clips per detai 9/15/2023 - PREVIOUS INSPECTION NOTES 9/15/23 MiTek plans address does not match house Stopped inspection 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23: Inspection stopped. Incomplete Inspection. Incomplete plans. Please walk your site before re-scheduling inspection. Examples: 1). Missing T1 - Truss page (although there are (3) A5 pages) 2). MiTek truss layout provided does not match house orientation. 3). Missing 2nd King stud (on left side of header) at garage load bearing wall as required on plan A5. 4). Need revision submitted to & approved by the City for the missing bucket on Truss T19 at 2ply truss T15. 5). Scab at Truss T05 is not secured to Truss as required at Simpson LGT2 bracket. 6). Roof sheathing needs shiners removed & nails sticking out of plywood fully nailed in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/19/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 9/19/23 1. No revision submitted and approved by Building Dept. 2. Over framing missing H2.5 clips per detai 9/15/2023 - PREVIOUS INSPECTION NOTES 9/15/23 MiTek plans address does not match house Stopped inspection 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23: Inspection stopped. Incomplete Inspection. Incomplete plans. Please walk your site before re-scheduling inspection. Examples: 1). Missing T1 - Truss page (although there are (3) A5 pages) 2). MiTek truss layout provided does not match house orientation. 3). Missing 2nd King stud (on left side of header) at garage load bearing wall as required on plan A5. 4). Need revision submitted to & approved by the City for the missing bucket on Truss T19 at 2ply truss T15. 5). Scab at Truss T05 is not secured to Truss as required at Simpson LGT2 bracket. 6). Roof sheathing needs shiners removed & nails sticking out of plywood fully nailed in. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/15/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 9/15/23 MiTek plans address does not match house Stopped inspection 9/6/2023 - PREVIOUS INSPECTION NOTES 9/6/23: Inspection stopped. Incomplete Inspection. Incomplete plans. Please walk your site before re-scheduling inspection. Examples: 1). Missing T1 - Truss page (although there are (3) A5 pages) 2). MiTek truss layout provided does not match house orientation. 3). Missing 2nd King stud (on left side of header) at garage load bearing wall as required on plan A5. 4). Need revision submitted to & approved by the City for the missing bucket on Truss T19 at 2ply truss T15. 5). Scab at Truss T05 is not secured to Truss as required at Simpson LGT2 bracket. 6). Roof sheathing needs shiners removed & nails sticking out of plywood fully nailed in. | |||
| ROOF VALLEY & METAL | 09/15/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Can not approve inspection untill after tie down inspection has been approved. | |||
| WALL SHEATHING | 09/06/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/06/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 9/6/23: Inspection stopped. Incomplete Inspection. Incomplete plans. Please walk your site before re-scheduling inspection. Examples: 1). Missing T1 - Truss page (although there are (3) A5 pages) 2). MiTek truss layout provided does not match house orientation. 3). Missing 2nd King stud (on left side of header) at garage load bearing wall as required on plan A5. 4). Need revision submitted to & approved by the City for the missing bucket on Truss T19 at 2ply truss T15. 5). Scab at Truss T05 is not secured to Truss as required at Simpson LGT2 bracket. 6). Roof sheathing needs shiners removed & nails sticking out of plywood fully nailed in. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/31/2023 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 08/28/2023 | APPROVED | MKRASKI |
| TIE BEAM / LINTEL | 08/22/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Tie beams are cut short and not tied in locations where block heigh changes | |||
| MONOLITHIC SLAB | 08/09/2023 | APPROVED | JWALKER |
| Note: 8/8/2023 - PREVIOUS INSPECTION NOTES 8/8/23: Damaged, dirt filled prints found jumbled up in permit box. Please provide clean & legible prints prior to next inspection. 1). Right side footer has minor dirt cave-in in multiple places. Condition of plans prevented the ability to mark areas so you will need to check all. | |||
| MONOLITHIC SLAB | 08/08/2023 | Disapproved - NO FEE | RSIMS |
| Note: 8/8/23: Damaged, dirt filled prints found jumbled up in permit box. Please provide clean & legible prints prior to next inspection. 1). Right side footer has minor dirt cave-in in multiple places. Condition of plans prevented the ability to mark areas so you will need to check all. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/31/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/06/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/24/2023 | 10/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/29/2023 | 08/31/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/29/2023 | 08/31/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/23/2023 | 05/23/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/23/2023 | 05/31/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/23/2023 | 05/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/23/2023 | 05/24/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/15/2023 | 05/23/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Culvert material and size to be depicted. Typical is 17X13 CMP (L) | |||
| BLD | COMPLETE | 05/15/2023 | 05/17/2023 |
| Note: Released By: JPI | |||
| BLD | COMPLETE | 05/09/2023 | 05/11/2023 |
| Note: Released By: JPI | |||
| BLD | COMPLETE | 05/01/2023 | 05/06/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/01/2023 | 05/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/01/2023 | 05/02/2023 |
| LOCATE | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/01/2023 | 05/08/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SHOW PROPOSED CULVERT PIPE WITH THE CORRECT SIZE | |||
| ZON | COMPLETE | 05/01/2023 | 05/02/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/01/2023 | 05/06/2023 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/01/2023 | 06/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/10/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/05/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/05/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/05/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/05/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/05/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/05/2023 |
| SEWER CREDIT | (¤1,398.45) | 06/05/2023 |
| SEWER INSPECTION | ¤25.00 | 06/05/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/05/2023 |
| WATER CREDIT | (¤964.70) | 06/05/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/05/2023 |
| SITE PLAN 30 | ¤30.00 | 06/05/2023 |
| CONNECTION FEES | ¤1,166.26 | 06/05/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/05/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/05/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/05/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/05/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/05/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/05/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/05/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/05/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/05/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/05/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/05/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/05/2023 |
| SURCHARGE FS 533.721 | ¤3.66 | 06/05/2023 |
| SURCHARGE - FS 468.631 | ¤5.49 | 06/05/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/05/2023 |
| WATER- TURN ON | ¤25.00 | 06/05/2023 |
| ADJUSTMENT 50% | (¤366.24) | 06/05/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/05/2023 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 06/05/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 06/05/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,414.36 |