Permit #2023050099

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7026-00490-0180
Block: 00490
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 732-421-5880
Location Address: 35 PIERCE LN
Type: DR - DRIVEWAY
Issue Date: 05/18/2023
NOC: Unknown
Applicant name: CLAUDIO MIGUEL SARAIVA
Owner: ALVES ANTONIO & TINA H&W LIFE ESTATE

Address

35 PIERCE LANE

PALM COAST, FL 32164

Lot: 0180
Contracted Stated Job Value: ¤2,450.00
Job Description: 21FT CONCRETE DRIVEWAY
Type: CN

Contractor

CMS CONSTRUCTION LLC
Status Location Address Phone
INACTIVE

19 BRADDOCK LN

PALM COAST, FL 32137

732-421-5880

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 06/27/2023 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 06/26/2023 APPROVED FSLADISH
Note: 06/26/23 PIPE ELAVATION IS GOOD. CULVERT CLEAR. LOOKED GOOD AT TIME OF INSPECTION. ______________________________________________________________________________________________________________________ nspector Notes from Inspection 9270 05/25/23 CORRECTIONS MADE. 5" MINIMUM OVER BOTH PIPE ENDS. NEED TO DIG OUT RIGHT SIDE MITER FOOTER ABOUT 1" TO HAVE THE REQUIRED 6" X 6" MINIMUM FOOTER REQUIREMENT. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 5/19/2023 - PREVIOUS INSPECTION NOTES 05/19/23= The culvert cannot be sloped against the drainage flow I NEED 5 INCH THE CONCRETE MINIMUM ON TOP OF THE CULVERT PIPE AND 2 INCH MINIMUM ON THE MITER ENDS
ROW - FINAL INSPECTION 06/26/2023 APPROVED FSLADISH
Note: 06/26/23 EVERYTHING LOOKED GOOD AT TIME OF INSPECTION. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 05/25/23 CORRECTIONS MADE. 5" MINIMUM OVER BOTH PIPE ENDS. NEED TO DIG OUT RIGHT SIDE MITER FOOTER ABOUT 1" TO HAVE THE REQUIRED 6" X 6" MINIMUM FOOTER REQUIREMENT. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 5/19/2023 - PREVIOUS INSPECTION NOTES 05/19/23= The culvert cannot be sloped against the drainage flow I NEED 5 INCH THE CONCRETE MINIMUM ON TOP OF THE CULVERT PIPE AND 2 INCH MINIMUM ON THE MITER ENDS
ROW- PRE-APRON (PRE-POUR) 05/25/2023 APPROVED - AS NOTED FSLADISH
Note: 05/25/23 CORRECTIONS MADE. 5" MINIMUM OVER BOTH PIPE ENDS. NEED TO DIG OUT RIGHT SIDE MITER FOOTER ABOUT 1" TO HAVE THE REQUIRED 6" X 6" MINIMUM FOOTER REQUIREMENT. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 5/19/2023 - PREVIOUS INSPECTION NOTES 05/19/23= The culvert cannot be sloped against the drainage flow I NEED 5 INCH THE CONCRETE MINIMUM ON TOP OF THE CULVERT PIPE AND 2 INCH MINIMUM ON THE MITER ENDS
ROW- PRE-APRON (PRE-POUR) 05/19/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 05/19/23= The culvert cannot be sloped against the drainage flow I NEED 5 INCH THE CONCRETE MINIMUM ON TOP OF THE CULVERT PIPE AND 2 INCH MINIMUM ON THE MITER ENDS

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/02/2023 05/04/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 05/02/2023 05/08/2023
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 05/02/2023 05/02/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 06/26/2023
SW ENG RES REVIEW 200 ¤200.00 05/18/2023
SITE PLAN 15 ¤15.00 05/18/2023
ADJUSTMENT 50% (¤15.00) 05/18/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/18/2023
SW ENG INSPECTION 40 ¤40.00 05/18/2023
SW ENG PRE APRON ¤30.00 05/18/2023
Fees Total Due: ¤0.00 Total Paid: ¤330.00