I want to search for...
Permit #2023050146
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00360-0010 |
| Block: 00360 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 904-535-1680 |
| Location Address: 21 ROSE DR |
| Type: RF - REROOF |
| Issue Date: 05/05/2023 |
| NOC: RECORDED |
| Applicant name: DANA SUE COOLEY |
| Owner: WILLIAMSON LARRY DENNIS & DIANNE A WILLIAMSON H&W |
|
Address 21 ROSE DRIVE PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤6,350.00 |
| Job Description: Reroof |
| Type: CN |
Contractor
FIVE STAR ROOFING OF NORTHEAST FLORIDA INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 08/07/2023 | FINAL APPROVED | JWALKER |
| Note: 8/4/2023 - PREVIOUS INSPECTION NOTES The off ridge vents are missing required fasteners at the front flange. See manufacture's specs. Lead flashing at the 1 1/2 PVC plumbing vent pipe has not been folded into the pipe. | |||
| ROOF FINAL | 08/04/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: The off ridge vents are missing required fasteners at the front flange. See manufacture's specs. Lead flashing at the 1 1/2 PVC plumbing vent pipe has not been folded into the pipe. | |||
| ROOF AFFIDAVIT | 08/02/2023 | APPROVED | MRAMOS |
| ROOF IN PROGRESS- MIDROOF | 08/02/2023 | APPROVED | JWALKER |
| Note: 8/1/2023 - PREVIOUS INSPECTION NOTES 8/1/23 Permit not onsite as listed below. 7/31/2023 - PREVIOUS INSPECTION NOTES Contractor may finish shingling roof. roofing materials match worksheet. However the Permit needs to be onsite for inspections. Please ensure the permit is onsite for midroof reinspection. | |||
| ROOF IN PROGRESS- MIDROOF | 08/01/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 8/1/23 Permit not onsite as listed below. 7/31/2023 - PREVIOUS INSPECTION NOTES Contractor may finish shingling roof. roofing materials match worksheet. However the Permit needs to be onsite for inspections. Please ensure the permit is onsite for midroof reinspection. | |||
| ROOF IN PROGRESS- MIDROOF | 07/31/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF IN PROGRESS- MIDROOF | 07/31/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Contractor may finish shingling roof. roofing materials match worksheet. However the Permit needs to be onsite for inspections. Please ensure the permit is onsite for midroof reinspection. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/04/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/01/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/31/2023 |
| ADJUSTMENT 50% | (¤45.00) | 05/05/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/05/2023 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 05/05/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/05/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/05/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤169.00 |