I want to search for...
Permit #2023050252
Permit Details
Status: COED
| Parcel Id: 07-11-31-7011-00010-1630 |
| CONDITIONED SPACE: 2303 sqft |
| GARAGE: 726 sqft |
| SCREEN PORCH (SOLID ROOF) : 665 sqft |
| OPENED PORCH (WITH ROOF) : 59 sqft |
| Total Square Footage: 3753 sqft |
| Block: 00010 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 386-237-8427 |
| Location Address: 188 BEACHWAY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/23/2023 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: CRAWFORD DAVID S & NADEZHDA K H&W |
|
Address 18 WHITTLESEY LN PALM COAST, FL 32164 |
| Lot: 1630 |
| Contracted Stated Job Value: ¤390,913.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/14/2024 | FINAL APPROVED | JSTEWART |
| U-CROSS CONNECTION | 02/29/2024 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 02/29/2024 | APPROVED | TPOLACEK |
| Note: 02/29/24 PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 02/27/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ** INSPECTOR NOTE ROADSIDE SWALE ACROSS THE STREET STILL NEEDS IMPROVEMENTS. THERE ARE LARGE RUTS FROM TIRES THAT NEED TO BE CORRECTED. | |||
| ROW - DRAINAGE | 02/29/2024 | APPROVED | TPOLACEK |
| Note: 02/29/24 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9471 02/29/24 THERE IS STILL WORK BEING DONE AND THERE IS A SMALL AMOUNT OF TRASH AND CONCTRUCTION DEBRIS AROUND PROPERTY THAT NEEDS TO BE CLEANED UP. WILL APPROVE AS NOTED. SWALE ACROSS THE STREET HAS BEEN REPAIRED AND I WILL ALSO CLEAR THE DRAINAGE INSPECTION AS WELL. PLEASE MAKE SURE TO CLEAN UP ALL TRASH. Inspector Notes from Inspection 9465 02/27/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ** INSPECTOR NOTE ROADSIDE SWALE ACROSS THE STREET STILL NEEDS IMPROVEMENTS. THERE ARE LARGE RUTS FROM TIRES THAT NEED TO BE CORRECTED. 11/17/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO DO ALL THE FOLLOWING LISTED IN LAST INSPECTION WE WILL BE BACK ON MONDAY 11/20/23 IF ALL OF THE FOLLOWING IS NOT DONE THERE WILL BE AN INSPECTION HOLD ON THIS CONSTRUCTION SITE THIS IS AN ON GOING ISSUE WITH THIS SITE SINCE JULY 23. -------------------------------------------------------------------------------------------- 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 THE BUILDER WAS INFORMED THAT THEY MUST MAINTAIN THE ROAD SIDE SWALE FOR DRAINAGE AFTER PREVIOUS DRAINAGE INSPECTIONS, AND HAVE FAILED TO COMPLY YOU ARE NEGATIVELY IMPACTING THE ADJACENT PROPERTIES. ** FOLLOW UP INSPECTIONS WILL BE CONDUCTED UNTIL THE BUILDER TAKES CORRECTIVE ACTION ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE RECOMEND THE INSTALLATION OF A TEMPORARY CULVERT TO MIMIMUM OF 12 INCHES IN DIAMETER TO ALLOW FOR THE FLOW OF STORMWATER. ** MUST SET TEMPORARY CULVERT TO MATCH EXISTING GRADE NOT HIGHER THAN. *** TEMPORARY PIPE YOU CURRENTLY HAVE IN PLACE IS NOT APPROPRIATE AS ITS NOT LONG ENOUGH AND CAN NOT BE TAPED TOGETHER *** ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE AROUND ENTIRE JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 11/17/23 __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/07/23 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS ** TEMPORARY CULVERT IS MORE THAN 50% FULL OF SEDIMENT BUILDER NEEDS TO BE AWARE AND CLEAN OUT IF THE FLOW OF STORMWATER IS IMPEDED BY THIS ____________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW THROUGH THE LOT TO OUTFALL OR PUT A TEMPORARY CULVERT SO WATER CAN FLOW NEED TO REMOVE THE PORTA JOHN OUT OF SWALE TRUSSES ARE MOVE AT THIS TIME ------------------------------------------------------------------------------------ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER NEEDS TO REMOVE YOUR TRUSSES FROM THE ROADWAY IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** BUILDER NEEDS TO REMOVE TRUSSES, PORT-A-JOHN AND CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** HUURICANE SEASON IS UPON YOU NEED TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS OR INSTALL A TEMPORARY CULVERT. ** SEE ATTACHED PHOTOS | |||
| ROW - STORMWATER FINAL | 02/29/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 02/29/24 THERE IS STILL WORK BEING DONE AND THERE IS A SMALL AMOUNT OF TRASH AND CONCTRUCTION DEBRIS AROUND PROPERTY THAT NEEDS TO BE CLEANED UP. WILL APPROVE AS NOTED. SWALE ACROSS THE STREET HAS BEEN REPAIRED AND I WILL ALSO CLEAR THE DRAINAGE INSPECTION AS WELL. PLEASE MAKE SURE TO CLEAN UP ALL TRASH. Inspector Notes from Inspection 9465 02/27/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ** INSPECTOR NOTE ROADSIDE SWALE ACROSS THE STREET STILL NEEDS IMPROVEMENTS. THERE ARE LARGE RUTS FROM TIRES THAT NEED TO BE CORRECTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/29/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/27/2024 | APPROVED | TPOLACEK |
| Note: 02/27/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 01/23/24 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. INSPECTOR NOTE: ROADSIDE SWALE ACROSS THE STREET IN FRONT OF THE VACANT WILL NEED TO BE REPAIRED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/27/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 02/27/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ** INSPECTOR NOTE ROADSIDE SWALE ACROSS THE STREET STILL NEEDS IMPROVEMENTS. THERE ARE LARGE RUTS FROM TIRES THAT NEED TO BE CORRECTED. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/23/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 01/23/24 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. INSPECTOR NOTE: ROADSIDE SWALE ACROSS THE STREET IN FRONT OF THE VACANT WILL NEED TO BE REPAIRED | |||
| U - SEWER TIE IN | 12/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THISB WAS A VIRTUAL INSPECTION | |||
| TUB SET | 12/05/2023 | APPROVED | JSTEWART |
| ELECTRIC - EARLY POWER | 11/30/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 11/30/23- Authorize release of email to FPL @ 10:37a. | |||
| ROW - DRAINAGE | 11/17/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO DO ALL THE FOLLOWING LISTED IN LAST INSPECTION WE WILL BE BACK ON MONDAY 11/20/23 IF ALL OF THE FOLLOWING IS NOT DONE THERE WILL BE AN INSPECTION HOLD ON THIS CONSTRUCTION SITE THIS IS AN ON GOING ISSUE WITH THIS SITE SINCE JULY 23. -------------------------------------------------------------------------------------------- 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 THE BUILDER WAS INFORMED THAT THEY MUST MAINTAIN THE ROAD SIDE SWALE FOR DRAINAGE AFTER PREVIOUS DRAINAGE INSPECTIONS, AND HAVE FAILED TO COMPLY YOU ARE NEGATIVELY IMPACTING THE ADJACENT PROPERTIES. ** FOLLOW UP INSPECTIONS WILL BE CONDUCTED UNTIL THE BUILDER TAKES CORRECTIVE ACTION ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE RECOMEND THE INSTALLATION OF A TEMPORARY CULVERT TO MIMIMUM OF 12 INCHES IN DIAMETER TO ALLOW FOR THE FLOW OF STORMWATER. ** MUST SET TEMPORARY CULVERT TO MATCH EXISTING GRADE NOT HIGHER THAN. *** TEMPORARY PIPE YOU CURRENTLY HAVE IN PLACE IS NOT APPROPRIATE AS ITS NOT LONG ENOUGH AND CAN NOT BE TAPED TOGETHER *** ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE AROUND ENTIRE JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 11/17/23 __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/07/23 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS ** TEMPORARY CULVERT IS MORE THAN 50% FULL OF SEDIMENT BUILDER NEEDS TO BE AWARE AND CLEAN OUT IF THE FLOW OF STORMWATER IS IMPEDED BY THIS ____________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW THROUGH THE LOT TO OUTFALL OR PUT A TEMPORARY CULVERT SO WATER CAN FLOW NEED TO REMOVE THE PORTA JOHN OUT OF SWALE TRUSSES ARE MOVE AT THIS TIME ------------------------------------------------------------------------------------ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER NEEDS TO REMOVE YOUR TRUSSES FROM THE ROADWAY IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** BUILDER NEEDS TO REMOVE TRUSSES, PORT-A-JOHN AND CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** HUURICANE SEASON IS UPON YOU NEED TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS OR INSTALL A TEMPORARY CULVERT. ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 11/15/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/15/23 THE BUILDER WAS INFORMED THAT THEY MUST MAINTAIN THE ROAD SIDE SWALE FOR DRAINAGE AFTER PREVIOUS DRAINAGE INSPECTIONS, AND HAVE FAILED TO COMPLY YOU ARE NEGATIVELY IMPACTING THE ADJACENT PROPERTIES. ** FOLLOW UP INSPECTIONS WILL BE CONDUCTED UNTIL THE BUILDER TAKES CORRECTIVE ACTION ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE RECOMEND THE INSTALLATION OF A TEMPORARY CULVERT TO MIMIMUM OF 12 INCHES IN DIAMETER TO ALLOW FOR THE FLOW OF STORMWATER. ** MUST SET TEMPORARY CULVERT TO MATCH EXISTING GRADE NOT HIGHER THAN. *** TEMPORARY PIPE YOU CURRENTLY HAVE IN PLACE IS NOT APPROPRIATE AS ITS NOT LONG ENOUGH AND CAN NOT BE TAPED TOGETHER *** ** BUILDER NEEDS TO RE-ESTABLISH SILT FENCE AROUND ENTIRE JOB SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 11/17/23 __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/07/23 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS ** TEMPORARY CULVERT IS MORE THAN 50% FULL OF SEDIMENT BUILDER NEEDS TO BE AWARE AND CLEAN OUT IF THE FLOW OF STORMWATER IS IMPEDED BY THIS ____________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW THROUGH THE LOT TO OUTFALL OR PUT A TEMPORARY CULVERT SO WATER CAN FLOW NEED TO REMOVE THE PORTA JOHN OUT OF SWALE TRUSSES ARE MOVE AT THIS TIME ------------------------------------------------------------------------------------ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER NEEDS TO REMOVE YOUR TRUSSES FROM THE ROADWAY IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** BUILDER NEEDS TO REMOVE TRUSSES, PORT-A-JOHN AND CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** HUURICANE SEASON IS UPON YOU NEED TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS OR INSTALL A TEMPORARY CULVERT. ** SEE ATTACHED PHOTOS | |||
| LATH/BRICK/ WATER BARRIER | 10/06/2023 | APPROVED | FWILLIS |
| INSULATION | 10/04/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 9/29/23- Previous note...#5.......the rear bath metal outlet box.( Vanity Light) Ground wire has not been bonded to the outlet. WILL CHECK AT INSULATION. 9/27/2023 - PREVIOUS INSPECTION NOTES 1. 5' head test is not holding water 2. The electrical rise installed does not match the riser drawing on page A3 of the approved plans. Please have the engineer submit a revision to the building department showing the as built riser. 3. Install nail plates, Rear bath 14-2 wire top chord. Master shower water supply lines, top plate. Master sink 12-2 wire, top plate. Garage wall door, Switch 14-2 wire top plate. 4. Plumbing vent above the master bathroom area needs to slope downward towards the drain. 5. The rear ceiling metal outlet box and the rear bath metal outlet box. Ground wire has not been bonded to the outlet. 6. A tub set inspection needs to be added. | |||
| ALL ROUGH | 09/29/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 9/29/23- Previous note...#5.......the rear bath metal outlet box.( Vanity Light) Ground wire has not been bonded to the outlet. WILL CHECK AT INSULATION. 9/27/2023 - PREVIOUS INSPECTION NOTES 1. 5' head test is not holding water 2. The electrical rise installed does not match the riser drawing on page A3 of the approved plans. Please have the engineer submit a revision to the building department showing the as built riser. 3. Install nail plates, Rear bath 14-2 wire top chord. Master shower water supply lines, top plate. Master sink 12-2 wire, top plate. Garage wall door, Switch 14-2 wire top plate. 4. Plumbing vent above the master bathroom area needs to slope downward towards the drain. 5. The rear ceiling metal outlet box and the rear bath metal outlet box. Ground wire has not been bonded to the outlet. 6. A tub set inspection needs to be added. | |||
| ALL ROUGH | 09/27/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. 5' head test is not holding water 2. The electrical riser installed does not match the riser drawing on page A3 of the approved plans. Please have the engineer submit a revision to the building department showing the as built riser. 3. Install nail plates, Rear bath 14-2 wire top chord. Master shower water supply lines, top plate. Master sink 12-2 wire, top plate. Garage wall door, Switch 14-2 wire top plate. 4. Plumbing vent above the master bathroom area needs to slope downward towards the drain. 5. The rear ceiling metal outlet box and the rear bath metal outlet box. Ground wire has not been bonded to the outlet. 6. A tub set inspection needs to be added. | |||
| ROOF VALLEY & METAL | 09/19/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2460 9/18/23- Please install anchors at garage door bucks per Plan, before next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/18/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 9/18/23- Please install anchors at garage door bucks per Plan, before next inspection. | |||
| ELECTRIC TEMP POLE | 09/07/2023 | APPROVED | LMILLER |
| ROOF VALLEY & METAL | 08/29/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 8/29/23- Roof sheathing/braces/ties/down cells needs aproval prior to Roof valley metal | |||
| WALL SHEATHING | 08/29/2023 | APPROVED | JSTEWART |
| ROW - DRAINAGE | 08/07/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/07/23 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS ** TEMPORARY CULVERT IS MORE THAN 50% FULL OF SEDIMENT BUILDER NEEDS TO BE AWARE AND CLEAN OUT IF THE FLOW OF STORMWATER IS IMPEDED BY THIS ____________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO CLEAR SWALE SO WATER CAN FLOW THROUGH THE LOT TO OUTFALL OR PUT A TEMPORARY CULVERT SO WATER CAN FLOW NEED TO REMOVE THE PORTA JOHN OUT OF SWALE TRUSSES ARE MOVE AT THIS TIME ------------------------------------------------------------------------------------ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER NEEDS TO REMOVE YOUR TRUSSES FROM THE ROADWAY IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** BUILDER NEEDS TO REMOVE TRUSSES, PORT-A-JOHN AND CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** HUURICANE SEASON IS UPON YOU NEED TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS OR INSTALL A TEMPORARY CULVERT. ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 08/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO CLEAR SWALE SO WATER CAN FLOW THROUGH THE LOT TO OUTFALL OR PUT A TEMPORARY CULVERT SO WATER CAN FLOW NEED TO REMOVE THE PORTA JOHN OUT OF SWALE TRUSSES ARE MOVE AT THIS TIME ------------------------------------------------------------------------------------ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER NEEDS TO REMOVE YOUR TRUSSES FROM THE ROADWAY IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** BUILDER NEEDS TO REMOVE TRUSSES, PORT-A-JOHN AND CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** HUURICANE SEASON IS UPON YOU NEED TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS OR INSTALL A TEMPORARY CULVERT. ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 07/31/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/31/23 BUILDER NEEDS TO REMOVE YOUR TRUSSES FROM THE ROADWAY IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** BUILDER NEEDS TO REMOVE TRUSSES, PORT-A-JOHN AND CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE IMMEDIATELY YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** HUURICANE SEASON IS UPON YOU NEED TO MAINTAIN THE ROAD SIDE SWALE ON A DAILY BASIS OR INSTALL A TEMPORARY CULVERT. ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION 08/01/23 | |||
| TIE BEAM / LINTEL | 07/14/2023 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2250 6/28/23--Please have Address Posted onsite by next inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/11/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/28/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 6/28/23--Please have Address Posted onsite by next inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/16/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/16/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/02/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 10/03/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/28/2023 | 10/03/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 09/28/2023 | 10/03/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to show wire size for 300 amp service. NEC 2017 310.15 (B) (16) | |||
| BLD | COMPLETE | 09/12/2023 | 09/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/21/2023 | 08/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/21/2023 | 08/21/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please upload this under the truss document type (not supporting document) | |||
| BLD | COMPLETE | 08/21/2023 | 08/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/16/2023 | 08/21/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need upload the rest of the truss packet and show wich truss is being repaired. | |||
| BLD | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/11/2023 | 07/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/11/2023 | 07/11/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/02/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/02/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/15/2023 | 05/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/15/2023 | 05/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/15/2023 | 05/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/15/2023 | 05/15/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM changes made for calcs not zoning | |||
| BLD | COMPLETE | 05/05/2023 | 05/06/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/05/2023 | 05/08/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 05/05/2023 | 05/08/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52. Bed 4 behind door. | |||
| ENGIN1 | COMPLETE | 05/05/2023 | 05/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/05/2023 | 05/05/2023 |
| LOCATE | COMPLETE | 05/05/2023 | 05/09/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/05/2023 | 05/05/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| SW1 | COMPLETE | 05/05/2023 | 05/12/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/05/2023 | 05/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/05/2023 | 05/08/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/05/2023 | 06/22/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/14/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/14/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/14/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/13/2023 |
| CONNECTION FEES | ¤1,166.26 | 05/23/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 05/23/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 05/23/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 05/23/2023 |
| IMPACT FEE FIRE | ¤420.52 | 05/23/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/23/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/23/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 05/23/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/23/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 05/23/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/23/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 05/23/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 05/23/2023 |
| SURCHARGE FS 533.721 | ¤4.41 | 05/23/2023 |
| SURCHARGE - FS 468.631 | ¤6.62 | 05/23/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/23/2023 |
| WATER- TURN ON | ¤25.00 | 05/23/2023 |
| ADJUSTMENT 50% | (¤705.12) | 05/23/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/23/2023 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 05/23/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 05/23/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/23/2023 |
| SW ENG PRE APRON | ¤30.00 | 05/23/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/23/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/23/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 05/23/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 05/23/2023 |
| SEWER CREDIT | (¤1,147.00) | 05/23/2023 |
| SEWER INSPECTION | ¤25.00 | 05/23/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 05/23/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 05/23/2023 |
| SITE PLAN 30 | ¤30.00 | 05/23/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,611.27 |