Permit #2023050698
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7006-00040-0010 |
| Block: 00040 |
| Subdivision: 2213 - SECTION 6-FLORIDA PARK |
| Job Phone: 386-931-1167 |
| Location Address: 2 FLINTSTONE CT |
| Type: DR - DRIVEWAY |
| Issue Date: 06/15/2023 |
| NOC: RECORDED |
| Applicant name: RONNIE SANTOS AGUIAR |
| Owner: DELVERS THOMAS B & DILEK S H&W |
|
Address 30 CRESTVIEW DR MILFORD, NJ 08848 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤6,400.00 |
| Job Description: REPLACE EXISTING DRIVEWAY AND WALKWAY (CONCRETE) |
| Type: CN |
Contractor
SANTOS & SONS CONCRETE
| Status | Location Address | Phone |
| INACTIVE |
PO BOX 1903 BUNNELL, FL 32110 |
386-931-0401 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 07/26/2023 | FINAL APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 07/26/2023 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 07/26/2023 | FINAL APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 07/11/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/11/23 ** READY TO POUR BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. _____________________________________________________________________________________________________________________ 7/7/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 07/07/2023 | CANCELLED BY APPLICANT | EMADISON |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/12/2023 | 05/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/12/2023 | 05/18/2023 |
| Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/12/2023 | 05/12/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤15.00) | 06/15/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/15/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 06/15/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/15/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/15/2023 |
| SITE PLAN 15 | ¤15.00 | 06/15/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤300.00 |