I want to search for...

Permit #2023050850

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00040-1480
CONDITIONED SPACE: 1917 sqft
GARAGE: 401 sqft
OPENED PORCH (WITH ROOF) : 180 sqft
OPENED PORCH (WITH ROOF) : 47 sqft
Total Square Footage: 2545 sqft
Block: 00040
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 386-237-5837
Location Address: 11 CORONA CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/07/2023
NOC: RECORDED
Applicant name: MARSEL GILMANSHIN
Owner: KRAYTER LYUDMILA

Address

10 CLEE COURT

PALM COAST, FL 32137

Lot: 1480
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GILMANS DEVELOPMENT CORP
Status Location Address State License Number Phone
ACTIVE

4873 PALM COAST PARKWAY NW #4

PALM COAST, FL 32137

CBC1263180 (Exp: 08/31/2026) 386-237-5837

Sub Contractors

ALEKSANDR A KATKO
Status Location Address State License Number Phone
ACTIVE

130 HARRISON RD

, 0

CFC1431723 (Exp: 08/31/2026) 386-341-3800
ANDREW GONCALVES HOWARD
Status Location Address State License Number Phone
ACTIVE

2 RYALL LANE

PALM COAST, FL 32164

CCC1333989 (Exp: 08/31/2026) 386-347-0366
SERGEY A VORONIN
Status Location Address State License Number Phone
ACTIVE

7631 SEVERN

JACKSONVILLE, FL 32224

EC13011326 (Exp: 08/31/2026) 360-798-2819
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/01/2025 FINAL APPROVED HCAMACHO
BLD - BUILDING FINAL 04/29/2025 Disapproved - NO FEE HCAMACHO
Note: *Previous note* 1. Install Locking caps at ODU service ports. FBCR M1411.8 -What is installed is not locking caps.
ROW - STORMWATER FINAL 04/08/2025 APPROVED FSLADISH
Note: 4/8/25 BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 4/7/2025 - PREVIOUS INSPECTION NOTES 4/7/25 I THINK YOU MAY HAVE MISUNDERSTOOD THE LAST INPECTION NOTES BY INSPECTOR MADISON. YOU ARE REQUIRED TO SOD THE AREA YOU HAVE SEEDED AND LAID STRAW UP TO THE PROPERTY LINE AND ANY AREAS BEYOND THE PROPERTY LINE THAT IS BARE REQUIRES SEED AND STRAW. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR ROW FINAL INSPECTION. ________________________________________________________________________________________________________________________ 4/3/2025 - PREVIOUS INSPECTION NOTES ** 04/03/25 BUILDER NEEDS TO REMOVE THE BARK MULCH OUT OF THE UTILITY EASMENT ALONG RIGHT SIDE PROPERTY LINE AND REPLACE WITH SOD ** ALL BARE EARTH BEYOND SODDED AREA REQUIRES SEED ANS STRAW ALSO NEED TO REMOVE THE BARK MUCH FROM THE VACANT ON RIGHT SIDE
ROW - STORMWATER FINAL 04/07/2025 Disapproved - NO FEE FSLADISH
Note: 4/7/25 I THINK YOU MAY HAVE MISUNDERSTOOD THE LAST INPECTION NOTES BY INSPECTOR MADISON. YOU ARE REQUIRED TO SOD THE AREA YOU HAVE SEEDED AND LAID STRAW UP TO THE PROPERTY LINE AND ANY AREAS BEYOND THE PROPERTY LINE THAT IS BARE REQUIRES SEED AND STRAW. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR ROW FINAL INSPECTION. ________________________________________________________________________________________________________________________ 4/3/2025 - PREVIOUS INSPECTION NOTES ** 04/03/25 BUILDER NEEDS TO REMOVE THE BARK MULCH OUT OF THE UTILITY EASMENT ALONG RIGHT SIDE PROPERTY LINE AND REPLACE WITH SOD ** ALL BARE EARTH BEYOND SODDED AREA REQUIRES SEED ANS STRAW ALSO NEED TO REMOVE THE BARK MUCH FROM THE VACANT ON RIGHT SIDE
BLD - BUILDING FINAL 04/07/2025 Disapproved -FEE REQUIRED JSTEWART
Note: 1. All exterior receptacles require Weather resistant. 2. Install Locking caps at ODU service ports. FBCR M1411.8 3. Install a light at garage attic access. (holding box open with exposed wires). NEC 210.70 (C) 4. Seal garage ceiling penetrations (AHU power, garage door opener cat 5). FBC EC TABLE R402.4.1.1 5. Seal garage wall penetrations at Hot water tank. FBC EC TABLE R402.4.1.1 6. Spare Toilet is not functioning. FBCR P2705.1 – 4 7. No Energy Calcs in plan Packet. (Looked up what was submitted). FBC [A] 107.4 8. Please submit a revision of energy calcs for equipment installed does not match. FBC [A] 107.4
U-CROSS CONNECTION 04/03/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
ROW - FINAL APRON (AFTER POUR) 04/03/2025 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 04/03/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/03/25 BUILDER NEEDS TO REMOVE THE BARK MULCH OUT OF THE UTILITY EASMENT ALONG RIGHT SIDE PROPERTY LINE AND REPLACE WITH SOD ** ALL BARE EARTH BEYOND SODDED AREA REQUIRES SEED ANS STRAW ALSO NEED TO REMOVE THE BARK MUCH FROM THE VACANT ON RIGHT SIDE
U -UTILITY RESIDENTIAL FINAL 04/03/2025 APPROVED - AS NOTED LFITZGERALD
Note: lower sewer CO/remove soils from water box-send pic when done
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/23/2025 APPROVED RGROSS
Note: Inspector Notes from Inspection 9270 ** 10/24/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW FIELD SURVEY /GRADING CERTIFICATION 01/23/2025 APPROVED RGROSS
ELECTRIC - EARLY POWER 12/05/2024 APPROVED HCAMACHO
ELECTRIC - EARLY POWER 11/21/2024 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 10/24/2024 APPROVED - AS NOTED EMADISON
Note: ** 10/24/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
LATH/BRICK/ WATER BARRIER 10/07/2024 APPROVED HCAMACHO
INSULATION 09/30/2024 APPROVED HCAMACHO
Note: 9/6/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 8-19-24 1. Front door not installed. 2. Island outlets need to be moved to the sides due to overhang of counter top. 3. Garage interior door not installed. 9-6-24 1. No front door. 2. No garage door. 3. Master shower light not installed.
INSULATION 09/06/2024 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2420 8-19-24 1. Front door not installed. 2. Island outlets need to be moved to the sides due to overhang of counter top. 3. Garage interior door not installed. 9-6-24 1. No front door. 2. No garage door. 3. Master shower light not installed.
ALL ROUGH 08/19/2024 APPROVED - AS NOTED BTAYLOR
Note: 8-19-24 1. Front door not installed. 2. Island outlets need to be moved to the sides due to overhang of counter top. 3. Garage interior door not installed.
U - SEWER TIE IN 08/19/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 06/20/2024 APPROVED LMILLER
WALL SHEATHING 06/13/2024 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/13/2024 APPROVED - AS NOTED JWALKER
Note: 1. Truss BO1 calls for a pocket to be constructed in the CMU wall to support the truss end. The contractor has hung the truss on the CMU wall with a bucket type hanger. 2. Truss CO1, Please provide a detail as to the bucket hanger used to support the truss at the cmu. For both trusse listed above have the EOR provide a revision to the building department showing the type of hangers to be installed. A moisture barrier will also need to be installed. between the truss end and cmu wall. Please have this correction completed prior to the ALL ROUGH inspection.
FOUND SURVEY APPROVED (OFFICE) 06/12/2024 APPROVED TBAKER
TIE BEAM / LINTEL 04/05/2024 APPROVED BTAYLOR
Note: 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24- 1. Please relocate (3) footing dowels marked in orange for clearance from masonry. R606.3.4 2. Please set 2 window sills ( onsite). 3. R319.1 Address identification… The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm)n
TIE BEAM / LINTEL 03/27/2024 Disapproved - NO FEE JSTEWART
Note: 3/27/24- 1. Please relocate (3) footing dowels marked in orange for clearance from masonry. R606.3.4 2. Please set 2 window sills ( onsite). 3. R319.1 Address identification… The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm)n
ROW - DRAINAGE 02/08/2024 APPROVED - AS NOTED EMADISON
Note: ** 02/08/24 ALL CORRECTIONS FINALLY COMPLETED ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE OF THE JOB SITE AND ALL EROSION CONTROL . ____________________________________________________________________________________________________________________ 2/7/2024 - PREVIOUS INSPECTION NOTES ** 02/07/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/08/24 ____________________________________________________________________________________________________________________ 2/6/2024 - PREVIOUS INSPECTION NOTES ** 02/06/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/07/24 ___________________________________________________________________________________________________________________ 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 02/07/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 02/07/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/08/24 ____________________________________________________________________________________________________________________ 2/6/2024 - PREVIOUS INSPECTION NOTES ** 02/06/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/07/24 ___________________________________________________________________________________________________________________ 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 02/06/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 02/06/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/07/24 ___________________________________________________________________________________________________________________ 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 02/05/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 02/05/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 02/05/2024 Disapproved -FEE REQUIRED EMADISON
Note: 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 01/31/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 01/26/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 01/25/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 01/24/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 01/23/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
ROW - DRAINAGE 01/18/2024 Disapproved - NO FEE EMADISON
Note: ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH
MONOLITHIC SLAB 11/30/2023 APPROVED AGAETANO
Note: 11/28/2023 - PREVIOUS INSPECTION NOTES 11-28-2023 1. UFER ground not visible. 2. Roots in footing and slab on right side of foundation area. Check all. 3. Compaction test not posted. Inspection stopped.
MONOLITHIC SLAB 11/28/2023 Disapproved - NO FEE AGAETANO
Note: 11-28-2023 1. UFER ground not visible. 2. Roots in footing and slab on right side of foundation area. Check all. 3. Compaction test not posted. Please relocate job box to another location. Unsafe to access. Inspection stopped.
PLUMBING 1ST ROUGH UNDERGROUND 11/21/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 11/21/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/18/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 04/28/2025 04/28/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 04/04/2025 04/04/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 04/03/2025 04/03/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 04/03/2025 04/03/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Revised Landscape Plan: Must have 7 gallon shrubs around mechanical equipment. Must have at least 1 shade tree. Holly is an understory tree.
BLD COMPLETE 03/31/2025 04/03/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/31/2025 04/01/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
BLD COMPLETE 07/26/2024 07/30/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/31/2024 06/06/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 05/21/2024 05/28/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Your uploading a document that was approved in a diferent permit. You need to upload this document with out the permit number
ENGIN1 COMPLETE 02/07/2024 02/07/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/07/2024 02/07/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ZON COMPLETE 08/04/2023 08/04/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/04/2023 08/04/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/04/2023 08/04/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
SW1 COMPLETE 07/31/2023 07/31/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/31/2023 08/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 07/31/2023 07/31/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the material of walkway and driveway on site plan. Walkways cannot exceed 6ft in width Please make sure the setbacks are legible on site plan.
SW1 HOLD 07/20/2023 07/27/2023
Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM It is very difficult to read your proposed elevation numbers on the survey they are very light and hard to make out, please clean and darken these shots up. thank you very much
ENGIN1 COMPLETE 07/20/2023 07/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/20/2023 07/20/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 07/14/2023 07/17/2023
Note: Released By: JPI
SW1 HOLD 07/14/2023 07/19/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRAINAGE NEED TO BE A COMMON SWALE ON LEFT AND RIGHT PROPOERTY LINE DO TO VACANT LOTS ADJACENT TO YOURS
BADMIN INFORMATION 07/14/2023 07/14/2023
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO TRUSS.PDF, SITE PLAN.PDF
ENGIN1 COMPLETE 07/14/2023 07/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/14/2023 07/14/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 07/05/2023 07/05/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM row not provided and driveway material changed to concrete
MECH COMPLETE 07/05/2023 07/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 07/05/2023 07/06/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
ENGIN1 COMPLETE 07/05/2023 07/06/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 07/05/2023 07/12/2023
Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM NEED TO HAVE PROPOSED ELEVATION SHOTS WHERE ALL EXISTING ELEVATION SHOTS ARE ON YOUR PROPOSED SITE PLAN
MECH HOLD 06/26/2023 06/26/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calc, heatload and duct layout signed by the AC contractor. Only EPL card submitted (Third Request)
ZON HOLD 06/26/2023 06/26/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide a right of way agreement signed by the owner and notarized for paver driveway. Once uploaded and approved we will ask for the original to be turned into us for recording.
ELEC COMPLETE 06/26/2023 06/26/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 06/26/2023 06/27/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
SW1 COMPLETE 06/26/2023 07/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/26/2023 06/26/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ELEC HOLD 06/11/2023 06/12/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 06/11/2023 06/12/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calc, heatload and duct layout signed by the AC contractor. Only EPL card submitted (Second Request)
ZON HOLD 06/11/2023 06/12/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement signed by the owner and notarized for paver driveway. Once uploaded and approved we will ask for the original to be turned into us for recording. On site plan be provide the material of the front entry walkway. Walkways cannot exceed 6ft in width Ac pad cannot be located in the 5ft utility easement
BLD HOLD 06/11/2023 06/13/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
SW1 HOLD 06/11/2023 06/14/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SUBMIT A NEW SITE PLAN TO SHOW DRIAVE GOING TO ROAD AND NEED TO HAVE A CULVERT PIPE
SW1 HOLD 05/23/2023 05/23/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM I NEED THE INFORMATION ABOUT THE CULVERT PIPE DETAIL Culvert material and size to be depicted. Typical is 17X13 CMP (L)
PLFM COMPLETE 05/17/2023 05/17/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 5/14/23, the structure will not fall within the SFHA. No elevation certificates will be required.
ZON HOLD 05/16/2023 05/17/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement signed by the owner and notarized for paver driveway. Once uploaded and approved we will ask for the original to be turned into us for recording. On site plan be provide the material of the front entry walkway. Walkways cannot exceed 6ft in width Ac pad cannot be located in the 5ft utility easement Landscape plan must state the sod type being used Residential homes shall provide foundation plantings consisting of 16 shrubs. Eight shrubs shall be planted in front of the home, and four shrubs planted on each side of the home wrapping corners. When the rear yard of a home faces a saltwater canal an additional four shrubs shall be planted along the rear of the home.
BLD HOLD 05/16/2023 05/17/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5 2. Provide a Truss Layout sheet consistent with the calculations. 107.3.5/ R802 3. The review will continue after receiving a response to comment 1 and 2. FBC 105.
CUSVC COMPLETE 05/16/2023 05/18/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/16/2023 05/17/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Bed 3 switch wall. 2. Submit electrical load calculations
ENGIN1 COMPLETE 05/16/2023 05/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/16/2023 05/16/2023
LOCATE COMPLETE 05/16/2023 05/18/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/16/2023 05/17/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calc, heatload and duct layout signed by the AC contractor. Only EPL card submitted
BADMIN COMPLETE 05/16/2023 05/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 05/16/2023 06/29/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 05/13/2025
CONTRACTOR CHANGE ¤20.00 05/13/2025
CONTRACTOR CHANGE ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG - INSPECTION 20 ¤20.00 05/13/2025
SW ENG REINSPECTION 20 ¤20.00 05/13/2025
REINSPECTION RESIDENTIAL ¤40.00 05/13/2025
CONNECTION FEES ¤1,166.26 08/07/2023
WATER- TURN ON ¤25.00 08/07/2023
ADJUSTMENT 50% (¤632.75) 08/07/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/07/2023
INSPECTION - RESIDENTIAL ¤962.50 08/07/2023
PLAN REVIEW - RESIDENTIAL ¤273.00 08/07/2023
SW ENG - REVIEW 20 ¤20.00 08/07/2023
SW ENG RES REVIEW 200 ¤200.00 08/07/2023
TRANS IMPACT FEE ADMIN ¤54.36 08/07/2023
TRANS IMPACT FEE ADMIN (¤54.36) 08/07/2023
SEWER INSPECTION ¤25.00 08/07/2023
SEWER CAPITAL FACILITY ¤5,344.82 08/07/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 08/07/2023
SITE PLAN 30 ¤30.00 08/07/2023
SW ENG INSPECTION 80 ¤80.00 08/07/2023
SW ENG PRE APRON ¤30.00 08/07/2023
FIRE IMPACT FEE ADMIN ¤12.62 08/07/2023
FIRE IMPACT FEE ADMIN (¤12.62) 08/07/2023
FC IMPACT FEE EMS ¤62.00 08/07/2023
IMPACT FEE FIRE ¤420.52 08/07/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/07/2023
FC IMPACT FEE LIBRARY ¤268.00 08/07/2023
IMPACT FEE PARKS ¤1,769.15 08/07/2023
IMPACT FEE SCHOOL ¤5,450.00 08/07/2023
RECORDING FEE REIMBURSE DOC ¤44.00 08/07/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 08/07/2023
WATER -IRRIGATION INSPECTION ¤25.00 08/07/2023
PARKS IMPACT FEE ADMIN ¤53.07 08/07/2023
PARKS IMPACT FEE ADMIN (¤53.07) 08/07/2023
SURCHARGE FS 533.721 ¤6.33 08/07/2023
SURCHARGE - FS 468.631 ¤9.49 08/07/2023
SW ENG - FOUNDATION SURVEY ¤20.00 08/07/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,922.20