I want to search for...
Permit #2023050850
Permit Details
Status: COED
| Parcel Id: 07-11-31-7016-00040-1480 |
| CONDITIONED SPACE: 1917 sqft |
| GARAGE: 401 sqft |
| OPENED PORCH (WITH ROOF) : 180 sqft |
| OPENED PORCH (WITH ROOF) : 47 sqft |
| Total Square Footage: 2545 sqft |
| Block: 00040 |
| Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE |
| Job Phone: 386-237-5837 |
| Location Address: 11 CORONA CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/07/2023 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: KRAYTER LYUDMILA |
|
Address 10 CLEE COURT PALM COAST, FL 32137 |
| Lot: 1480 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Sub Contractors
ALEKSANDR A KATKO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
130 HARRISON RD , 0 |
CFC1431723 (Exp: 08/31/2026) | 386-341-3800 |
ANDREW GONCALVES HOWARD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2 RYALL LANE PALM COAST, FL 32164 |
CCC1333989 (Exp: 08/31/2026) | 386-347-0366 |
SERGEY A VORONIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7631 SEVERN JACKSONVILLE, FL 32224 |
EC13011326 (Exp: 08/31/2026) | 360-798-2819 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/01/2025 | FINAL APPROVED | HCAMACHO |
| BLD - BUILDING FINAL | 04/29/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: *Previous note* 1. Install Locking caps at ODU service ports. FBCR M1411.8 -What is installed is not locking caps. | |||
| ROW - STORMWATER FINAL | 04/08/2025 | APPROVED | FSLADISH |
| Note: 4/8/25 BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 4/7/2025 - PREVIOUS INSPECTION NOTES 4/7/25 I THINK YOU MAY HAVE MISUNDERSTOOD THE LAST INPECTION NOTES BY INSPECTOR MADISON. YOU ARE REQUIRED TO SOD THE AREA YOU HAVE SEEDED AND LAID STRAW UP TO THE PROPERTY LINE AND ANY AREAS BEYOND THE PROPERTY LINE THAT IS BARE REQUIRES SEED AND STRAW. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR ROW FINAL INSPECTION. ________________________________________________________________________________________________________________________ 4/3/2025 - PREVIOUS INSPECTION NOTES ** 04/03/25 BUILDER NEEDS TO REMOVE THE BARK MULCH OUT OF THE UTILITY EASMENT ALONG RIGHT SIDE PROPERTY LINE AND REPLACE WITH SOD ** ALL BARE EARTH BEYOND SODDED AREA REQUIRES SEED ANS STRAW ALSO NEED TO REMOVE THE BARK MUCH FROM THE VACANT ON RIGHT SIDE | |||
| ROW - STORMWATER FINAL | 04/07/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 4/7/25 I THINK YOU MAY HAVE MISUNDERSTOOD THE LAST INPECTION NOTES BY INSPECTOR MADISON. YOU ARE REQUIRED TO SOD THE AREA YOU HAVE SEEDED AND LAID STRAW UP TO THE PROPERTY LINE AND ANY AREAS BEYOND THE PROPERTY LINE THAT IS BARE REQUIRES SEED AND STRAW. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR ROW FINAL INSPECTION. ________________________________________________________________________________________________________________________ 4/3/2025 - PREVIOUS INSPECTION NOTES ** 04/03/25 BUILDER NEEDS TO REMOVE THE BARK MULCH OUT OF THE UTILITY EASMENT ALONG RIGHT SIDE PROPERTY LINE AND REPLACE WITH SOD ** ALL BARE EARTH BEYOND SODDED AREA REQUIRES SEED ANS STRAW ALSO NEED TO REMOVE THE BARK MUCH FROM THE VACANT ON RIGHT SIDE | |||
| BLD - BUILDING FINAL | 04/07/2025 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 1. All exterior receptacles require Weather resistant. 2. Install Locking caps at ODU service ports. FBCR M1411.8 3. Install a light at garage attic access. (holding box open with exposed wires). NEC 210.70 (C) 4. Seal garage ceiling penetrations (AHU power, garage door opener cat 5). FBC EC TABLE R402.4.1.1 5. Seal garage wall penetrations at Hot water tank. FBC EC TABLE R402.4.1.1 6. Spare Toilet is not functioning. FBCR P2705.1 – 4 7. No Energy Calcs in plan Packet. (Looked up what was submitted). FBC [A] 107.4 8. Please submit a revision of energy calcs for equipment installed does not match. FBC [A] 107.4 | |||
| U-CROSS CONNECTION | 04/03/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| ROW - FINAL APRON (AFTER POUR) | 04/03/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/03/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/03/25 BUILDER NEEDS TO REMOVE THE BARK MULCH OUT OF THE UTILITY EASMENT ALONG RIGHT SIDE PROPERTY LINE AND REPLACE WITH SOD ** ALL BARE EARTH BEYOND SODDED AREA REQUIRES SEED ANS STRAW ALSO NEED TO REMOVE THE BARK MUCH FROM THE VACANT ON RIGHT SIDE | |||
| U -UTILITY RESIDENTIAL FINAL | 04/03/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: lower sewer CO/remove soils from water box-send pic when done | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/23/2025 | APPROVED | RGROSS |
| Note: Inspector Notes from Inspection 9270 ** 10/24/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/23/2025 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 12/05/2024 | APPROVED | HCAMACHO |
| ELECTRIC - EARLY POWER | 11/21/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 10/24/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/24/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| LATH/BRICK/ WATER BARRIER | 10/07/2024 | APPROVED | HCAMACHO |
| INSULATION | 09/30/2024 | APPROVED | HCAMACHO |
| Note: 9/6/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 8-19-24 1. Front door not installed. 2. Island outlets need to be moved to the sides due to overhang of counter top. 3. Garage interior door not installed. 9-6-24 1. No front door. 2. No garage door. 3. Master shower light not installed. | |||
| INSULATION | 09/06/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 8-19-24 1. Front door not installed. 2. Island outlets need to be moved to the sides due to overhang of counter top. 3. Garage interior door not installed. 9-6-24 1. No front door. 2. No garage door. 3. Master shower light not installed. | |||
| ALL ROUGH | 08/19/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-19-24 1. Front door not installed. 2. Island outlets need to be moved to the sides due to overhang of counter top. 3. Garage interior door not installed. | |||
| U - SEWER TIE IN | 08/19/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 06/20/2024 | APPROVED | LMILLER |
| WALL SHEATHING | 06/13/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/13/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Truss BO1 calls for a pocket to be constructed in the CMU wall to support the truss end. The contractor has hung the truss on the CMU wall with a bucket type hanger. 2. Truss CO1, Please provide a detail as to the bucket hanger used to support the truss at the cmu. For both trusse listed above have the EOR provide a revision to the building department showing the type of hangers to be installed. A moisture barrier will also need to be installed. between the truss end and cmu wall. Please have this correction completed prior to the ALL ROUGH inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/12/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/05/2024 | APPROVED | BTAYLOR |
| Note: 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24- 1. Please relocate (3) footing dowels marked in orange for clearance from masonry. R606.3.4 2. Please set 2 window sills ( onsite). 3. R319.1 Address identification… The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm)n | |||
| TIE BEAM / LINTEL | 03/27/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 3/27/24- 1. Please relocate (3) footing dowels marked in orange for clearance from masonry. R606.3.4 2. Please set 2 window sills ( onsite). 3. R319.1 Address identification… The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm)n | |||
| ROW - DRAINAGE | 02/08/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/08/24 ALL CORRECTIONS FINALLY COMPLETED ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE OF THE JOB SITE AND ALL EROSION CONTROL . ____________________________________________________________________________________________________________________ 2/7/2024 - PREVIOUS INSPECTION NOTES ** 02/07/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/08/24 ____________________________________________________________________________________________________________________ 2/6/2024 - PREVIOUS INSPECTION NOTES ** 02/06/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/07/24 ___________________________________________________________________________________________________________________ 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 02/07/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/07/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/08/24 ____________________________________________________________________________________________________________________ 2/6/2024 - PREVIOUS INSPECTION NOTES ** 02/06/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/07/24 ___________________________________________________________________________________________________________________ 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 02/06/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/06/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/07/24 ___________________________________________________________________________________________________________________ 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 02/05/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/05/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 02/05/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: 2/5/2024 - PREVIOUS INSPECTION NOTES ** 02/05/24 ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** MOVING THE PORT-A-JOHN FROM THE LEFT SIDE ROAD SIDE SWALE TO THE RIGHT SIDE ROAD SIDE SWALE HAS NOT CORRECTED THE VIOLATION OF REMOVING THE PORT-A-JOHN FROM THE SWALE AND PUTTING IT ONTO THE JOB SITE. ** FOLLOW UP INSPECTION 02/06/24 ____________________________________________________________________________________________________________________ 1/31/2024 - PREVIOUS INSPECTION NOTES ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 01/31/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/31/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ONTO JOB SITE. ** IF THE PORT-A-JOHN IS NOT REMOVED FROM ROAD SIDE SWALE BY NEXT INSPECTION ON 02/05/24 THIS WILL BE TURNED OVER TO CODE ENFORCEMENT FOR FURTHER ACTION ** FOLLOW UP INSPECTION 02/05/24 ________________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ** FOLLOW UP INSPECTION 0/31/24 _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 01/26/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/30/24 MOST CORRECTIONS HAVE BEEN MADE BUILDER STILL NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE _____________________________________________________________________________________________________________________ 1/25/2024 - PREVIOUS INSPECTION NOTES ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 01/25/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/25/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/26/24 _______________________________________________________________________________________________________________________ 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 01/24/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/24/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/25/24 __________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 01/23/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/23/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** IF CORRECTIONS ARE NOT MADE BY 01/25/24 THE INSPECTION PRIORITY WILL BE CHANGED TO A PRIORITY 1 WHICH WILL NOT ALLOW ANY INSPECTIONS TO BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE. ** INSPECTIONS WILL BE SCHEDULED EVERYDAY AND FEES WILL BE IMPOSED UNTIL CORRECTIONS HAVE BEEN MADE AFTER A TOTAL OF 10 DAYS OF NO COMPLIANCE CODE ENFORCEMENT WILL BE NOTIFIED ** BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/24/24 __________________________________________________________________________________________________________________ 1/18/2024 - PREVIOUS INSPECTION NOTES ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| ROW - DRAINAGE | 01/18/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/18/24 BUILDER NEEEDS TO OPEN ROAD SIDE SWALE TO ALLOW FOR STORMWATER TO FLOW WITHOUT OBSTRUCTION (RIGHT SIDE OF TEMPORARY CULVERT) ** REMOVE PORT-A-JOHN FROM ROAD SIDE SWALE AND PUT ONTO JOB SITE ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE ** REMOVE MATERIAL THAT HAS ERODED ONTO ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 01/23/24 NEIGHBOR SAYS SWALE IS BLOCKED ON NEW CONSTRUCTION SITE MH | |||
| MONOLITHIC SLAB | 11/30/2023 | APPROVED | AGAETANO |
| Note: 11/28/2023 - PREVIOUS INSPECTION NOTES 11-28-2023 1. UFER ground not visible. 2. Roots in footing and slab on right side of foundation area. Check all. 3. Compaction test not posted. Inspection stopped. | |||
| MONOLITHIC SLAB | 11/28/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 11-28-2023 1. UFER ground not visible. 2. Roots in footing and slab on right side of foundation area. Check all. 3. Compaction test not posted. Please relocate job box to another location. Unsafe to access. Inspection stopped. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/21/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/21/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/18/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/28/2025 | 04/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/04/2025 | 04/04/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/03/2025 | 04/03/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/03/2025 | 04/03/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Revised Landscape Plan: Must have 7 gallon shrubs around mechanical equipment. Must have at least 1 shade tree. Holly is an understory tree. | |||
| BLD | COMPLETE | 03/31/2025 | 04/03/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/31/2025 | 04/01/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/26/2024 | 07/30/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/31/2024 | 06/06/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/21/2024 | 05/28/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Your uploading a document that was approved in a diferent permit. You need to upload this document with out the permit number | |||
| ENGIN1 | COMPLETE | 02/07/2024 | 02/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/07/2024 | 02/07/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/04/2023 | 08/04/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/04/2023 | 08/04/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/04/2023 | 08/04/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/31/2023 | 07/31/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/31/2023 | 08/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/31/2023 | 07/31/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the material of walkway and driveway on site plan. Walkways cannot exceed 6ft in width Please make sure the setbacks are legible on site plan. | |||
| SW1 | HOLD | 07/20/2023 | 07/27/2023 |
| Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM It is very difficult to read your proposed elevation numbers on the survey they are very light and hard to make out, please clean and darken these shots up. thank you very much | |||
| ENGIN1 | COMPLETE | 07/20/2023 | 07/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2023 | 07/20/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/14/2023 | 07/17/2023 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 07/14/2023 | 07/19/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM DRAINAGE NEED TO BE A COMMON SWALE ON LEFT AND RIGHT PROPOERTY LINE DO TO VACANT LOTS ADJACENT TO YOURS | |||
| BADMIN | INFORMATION | 07/14/2023 | 07/14/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO TRUSS.PDF, SITE PLAN.PDF | |||
| ENGIN1 | COMPLETE | 07/14/2023 | 07/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/14/2023 | 07/14/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/05/2023 | 07/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM row not provided and driveway material changed to concrete | |||
| MECH | COMPLETE | 07/05/2023 | 07/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/05/2023 | 07/06/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| ENGIN1 | COMPLETE | 07/05/2023 | 07/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/05/2023 | 07/12/2023 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM NEED TO HAVE PROPOSED ELEVATION SHOTS WHERE ALL EXISTING ELEVATION SHOTS ARE ON YOUR PROPOSED SITE PLAN | |||
| MECH | HOLD | 06/26/2023 | 06/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calc, heatload and duct layout signed by the AC contractor. Only EPL card submitted (Third Request) | |||
| ZON | HOLD | 06/26/2023 | 06/26/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide a right of way agreement signed by the owner and notarized for paver driveway. Once uploaded and approved we will ask for the original to be turned into us for recording. | |||
| ELEC | COMPLETE | 06/26/2023 | 06/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/26/2023 | 06/27/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| SW1 | COMPLETE | 06/26/2023 | 07/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/26/2023 | 06/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/11/2023 | 06/12/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/11/2023 | 06/12/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calc, heatload and duct layout signed by the AC contractor. Only EPL card submitted (Second Request) | |||
| ZON | HOLD | 06/11/2023 | 06/12/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement signed by the owner and notarized for paver driveway. Once uploaded and approved we will ask for the original to be turned into us for recording. On site plan be provide the material of the front entry walkway. Walkways cannot exceed 6ft in width Ac pad cannot be located in the 5ft utility easement | |||
| BLD | HOLD | 06/11/2023 | 06/13/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| SW1 | HOLD | 06/11/2023 | 06/14/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SUBMIT A NEW SITE PLAN TO SHOW DRIAVE GOING TO ROAD AND NEED TO HAVE A CULVERT PIPE | |||
| SW1 | HOLD | 05/23/2023 | 05/23/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM I NEED THE INFORMATION ABOUT THE CULVERT PIPE DETAIL Culvert material and size to be depicted. Typical is 17X13 CMP (L) | |||
| PLFM | COMPLETE | 05/17/2023 | 05/17/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 5/14/23, the structure will not fall within the SFHA. No elevation certificates will be required. | |||
| ZON | HOLD | 05/16/2023 | 05/17/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement signed by the owner and notarized for paver driveway. Once uploaded and approved we will ask for the original to be turned into us for recording. On site plan be provide the material of the front entry walkway. Walkways cannot exceed 6ft in width Ac pad cannot be located in the 5ft utility easement Landscape plan must state the sod type being used Residential homes shall provide foundation plantings consisting of 16 shrubs. Eight shrubs shall be planted in front of the home, and four shrubs planted on each side of the home wrapping corners. When the rear yard of a home faces a saltwater canal an additional four shrubs shall be planted along the rear of the home. | |||
| BLD | HOLD | 05/16/2023 | 05/17/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5 2. Provide a Truss Layout sheet consistent with the calculations. 107.3.5/ R802 3. The review will continue after receiving a response to comment 1 and 2. FBC 105. | |||
| CUSVC | COMPLETE | 05/16/2023 | 05/18/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/16/2023 | 05/17/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Bed 3 switch wall. 2. Submit electrical load calculations | |||
| ENGIN1 | COMPLETE | 05/16/2023 | 05/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/16/2023 | 05/16/2023 |
| LOCATE | COMPLETE | 05/16/2023 | 05/18/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/16/2023 | 05/17/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calc, heatload and duct layout signed by the AC contractor. Only EPL card submitted | |||
| BADMIN | COMPLETE | 05/16/2023 | 05/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/16/2023 | 06/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/13/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/13/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/13/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/13/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/13/2025 |
| CONNECTION FEES | ¤1,166.26 | 08/07/2023 |
| WATER- TURN ON | ¤25.00 | 08/07/2023 |
| ADJUSTMENT 50% | (¤632.75) | 08/07/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/07/2023 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 08/07/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 08/07/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/07/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/07/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/07/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/07/2023 |
| SEWER INSPECTION | ¤25.00 | 08/07/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/07/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/07/2023 |
| SITE PLAN 30 | ¤30.00 | 08/07/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/07/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/07/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/07/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/07/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/07/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/07/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/07/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/07/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/07/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/07/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 08/07/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/07/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/07/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/07/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/07/2023 |
| SURCHARGE FS 533.721 | ¤6.33 | 08/07/2023 |
| SURCHARGE - FS 468.631 | ¤9.49 | 08/07/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/07/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,922.20 |