I want to search for...
Permit #2023050884
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-1530 |
| CONDITIONED SPACE: 2347 sqft |
| GARAGE: 420 sqft |
| OPENED PORCH (WITH ROOF) : 318 sqft |
| Total Square Footage: 3085 sqft |
| Block: 00000 |
| Subdivision: 2296 - MARINA DEL PALMA SUBDIVISION |
| Job Phone: 386-237-8427 |
| Location Address: 14 MENORCA WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/09/2023 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: HARLAM THOMAS |
|
Address 3601 DAYDREAM PL SAINT CLOUD, FL 34772 |
| Lot: 1530 |
| Contracted Stated Job Value: ¤605,320.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
KEN DEPRINZIO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
325 WALKER STREET HOLLY HILL, FL 32117 |
11351 (Exp: 08/31/2026) | 386-672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/27/2024 | FINAL APPROVED | BTAYLOR |
| Note: 6/26/2024 - PREVIOUS INSPECTION NOTES 6-26-24 1. Missing air handler sticker on electrical panel stating air handler is in attic. 2. No hot water in master shower. | |||
| BLD - BUILDING FINAL | 06/26/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 6-26-24 1. Missing air handler sticker on electrical panel stating air handler is in attic. 2. No hot water in master shower. | |||
| ROW - STORMWATER FINAL | 06/25/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE --------------------------------------------------------------------- 6/20/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO RE-ESTABLISH THE SOD BUFFER ALONG THE BACK OF CURB IN THE VACANT LOTS TO THE RIGHT AND LEFT OF YOURS. THIS WILL INSURE THAT ALL SAND AND DIRT STAYS ON THE VACANT LOTS. 2) NEED TO HAVE ONE ROW OF SOD ALONG THE END OF THE SIDEWALKS. THIS WILL INSURE THAT THE SIDEWALK WILL NOT WASH OUT. 3) NEED TO HAVE ONE ROW OF SOD ON THE RIGHT SIDE AT THE QUEEN PALM IN THE FRONT SO MULCH WILL STAY IN THE BED AROUND IT. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/20/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 06/20/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO RE-ESTABLISH THE SOD BUFFER ALONG THE BACK OF CURB IN THE VACANT LOTS TO THE RIGHT AND LEFT OF YOURS. THIS WILL INSURE THAT ALL SAND AND DIRT STAYS ON THE VACANT LOTS. 2) NEED TO HAVE ONE ROW OF SOD ALONG THE END OF THE SIDEWALKS. THIS WILL INSURE THAT THE SIDEWALK WILL NOT WASH OUT. 3) NEED TO HAVE ONE ROW OF SOD ON THE RIGHT SIDE AT THE QUEEN PALM IN THE FRONT SO MULCH WILL STAY IN THE BED AROUND IT. | |||
| U-CROSS CONNECTION | 06/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/20/2024 1:52:13 PM *** has irrigation meter-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/18/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: WRONG DATE ON THIS INSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/17/2024 | APPROVED | PFLANAGAN |
| Note: 6/17/2024 - PREVIOUS INSPECTION NOTES WRONG DATE ON THIS INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 06/17/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/17/2024 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 04/03/2024 | APPROVED | TPOLACEK |
| Note: 04/03/24 READY FOR PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED --------------------------------------------------------------------------------------------------------------- 3/15/2024 - PREVIOUS INSPECTION NOTES READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/15/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR SIDEWALK, APRON AND PAVER RESTRAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 02/21/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2-21-24 1. Emailed FPL at 11:20. | |||
| U - SEWER TIE IN | 01/08/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 8/10/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE DISREGUARD SEE FIRST ROUGH NOTE COMMENT THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 12/05/2023 | APPROVED | BTAYLOR |
| INSULATION | 12/05/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 12/04/2023 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 11/28/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 10/25/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 10/4/2023 - PREVIOUS INSPECTION NOTES 10-4-23 1. Not ready. Super needs to walk job and fix problems before calling in. 10-6-23 1. Straps are still not nailed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/06/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10/4/2023 - PREVIOUS INSPECTION NOTES 10-4-23 1. Not ready. Super needs to walk job and fix problems before calling in. 10-6-23 1. Straps are still not nailed. | |||
| WALL SHEATHING | 10/04/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/04/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 10-4-23 1. Not ready. Super needs to walk job and fix problems before calling in. | |||
| TIE BEAM / LINTEL | 09/07/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 08/25/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/16/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/10/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 08/10/2023 | Disapproved - NO FEE | MGIBSON |
| Note: SEE FIRST ROUGH NOTE | |||
| GRAVITY SEWER TEST | 08/10/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 8/10/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE DISREGUARD SEE FIRST ROUGH NOTE COMMENT | |||
| WATER METER INSTALLATION REQUEST | 07/20/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 05/07/2024 | 05/07/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/07/2024 | 05/10/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/07/2024 | 05/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/19/2024 | 04/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/19/2024 | 04/25/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please be sure rear drainage elevations are completely visible after adding the patio to site plan. | |||
| ZON | HOLD | 04/19/2024 | 04/19/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM site plan : Setback calculations are incorrect . Please remember that you have a 10' setback in the rear. that patio dimensions need to be adjusted to fit that setback | |||
| MECH | COMPLETE | 02/16/2024 | 02/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/25/2023 | 08/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/25/2023 | 08/25/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/16/2023 | 06/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/16/2023 | 06/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/26/2023 | 05/26/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/25/2023 | 05/25/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/25/2023 | 05/25/2023 |
| Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM site plan needs to be loaded by itseld and not attached to the gas riser | |||
| GAS | HOLD | 05/25/2023 | 05/25/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM List gas subcontractor | |||
| GAS | COMPLETE | 05/25/2023 | 05/25/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/25/2023 | 05/25/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please a clearer site plan with the location of the tank as the site plan will need to be stamped. | |||
| ZON | COMPLETE | 05/24/2023 | 05/24/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/24/2023 | 05/25/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Floor plan shows a 22 KW generator. Provide gas riser diagram and list gas subcontractor. | |||
| URB | COMPLETE | 05/18/2023 | 05/24/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/16/2023 | 05/17/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/16/2023 | 05/19/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/16/2023 | 05/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/16/2023 | 05/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/16/2023 | 05/17/2023 |
| LOCATE | COMPLETE | 05/16/2023 | 05/18/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/16/2023 | 05/17/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs, heatload and duct layout. Document uploaded was a roofing worksheet | |||
| SW1 | COMPLETE | 05/16/2023 | 05/23/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/16/2023 | 05/18/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM On elevation pages, The layout doesn't match the other plans. All other plans show flat walls on each side | |||
| BADMIN | COMPLETE | 05/16/2023 | 05/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/27/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/17/2024 |
| CONNECTION FEES | ¤25.00 | 06/09/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/09/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/09/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/09/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/09/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/09/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/09/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/09/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/09/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 06/09/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/09/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/09/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/09/2023 |
| SURCHARGE FS 533.721 | ¤10.85 | 06/09/2023 |
| SURCHARGE - FS 468.631 | ¤16.27 | 06/09/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/09/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/09/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/09/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/09/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/09/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 06/09/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 06/09/2023 |
| SEWER INSPECTION | ¤25.00 | 06/09/2023 |
| SEWER CAPITAL FACILITY | ¤2,863.63 | 06/09/2023 |
| WATER CAPITAL FACILITY FEE | ¤2,675.20 | 06/09/2023 |
| SITE PLAN 30 | ¤30.00 | 06/09/2023 |
| WATER-METER | ¤505.39 | 06/09/2023 |
| WATER-METER | ¤505.39 | 06/09/2023 |
| WATER- TURN ON | ¤25.00 | 06/09/2023 |
| ADJUSTMENT 50% | (¤1,084.59) | 06/09/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/09/2023 |
| INSPECTION - RESIDENTIAL | ¤1,666.50 | 06/09/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤472.68 | 06/09/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,692.49 |