Permit #2023050885
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00630-0060 |
| GARAGE: 622 sqft |
| CONDITIONED SPACE: 1611 sqft |
| OPENED PORCH (WITH ROOF) : 210 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| Total Square Footage: 2495 sqft |
| Block: 00630 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 386-931-5935 |
| Location Address: 4 SELKIRK PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/26/2023 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: SPANO ELAINE & ROBERT H&W |
|
Address 36 THOMPSON AVE WHITE PLAINS, NY 10603 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤330,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/26/2024 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 06/18/2024 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 06/12/2024 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 06/07/2024 | FINAL APPROVED | LFITZGERALD |
| Note: New inspection due to canceled inspection 6/4/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/4/2024 9:20:12 AM *** Need sewer clean out located . Inspector Notes from Inspection 9035 No irrigation, no cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/05/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 6/4/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/4/2024 9:20:12 AM *** Need sewer clean out located . Inspector Notes from Inspection 9035 No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/04/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/4/24 PIPE ELEVATION IS GOOD. CUTS MADE. CULVERTS CLEAR. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 6/3/24 UPON WALKING THE PROPERTY DETERMINED DRAINAGE WILL WORK. APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 6/3/24 REVISED SITE PLAN SUBMITTED, FINAL SURVEY PASSING AS NOTED. _________________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES AS STATED FROM LAST TWO INSPECTIONS YOU NEED TO HAVE NEW SITE PLAN THAT SHOWS THE DRAINAGE WITH THE POOL ON THE SITE PLAN. ------------------------------------------------------------------------------------- 5/21/2024 - PREVIOUS INSPECTION NOTES 5/21/24 AFTER CONFERRING WIT GABE IT HAS BEEN DETERMINED YOU WILL NEED TO SUBMIT A REVISED SITE PLAN SHOWING THE POOL AND THE NEW DRAINAGE PATTERN CONFORMING TO COPC DRAINAGE STANDARS.. YOU CAN NOT USE YOUR OLD SITE PLAN AS THE POOL WAS NOT INCLUDED BUT IS CURRENTLY THERE AND AFFECTS THE DRAINAGE PATTERN. DRAINAGE IS REQUIRED TO SHED FROM THE BACK YARD TO THE FRONT SWALE . IT CURRENTLY SHOWS THE DRAINAGE NEGATIVELY AFFECTING THE ADJOINING PROPERTY IN THE REAR 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 14 Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) . 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 7:37:51 AM *** 5/6/24 Your site plan did not indicate a pool, with the addition of the pool on your final survey your rear drainage off of the pool deck in the rear all flows back towards the adjoing rear property, negatively affecting them. Your drainage must go from the rear to the front swale as indicated in your site plan. Inspector Notes from Inspection 9270 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW - STORMWATER FINAL | 06/04/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/4/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 6/3/24 UPON WALKING THE PROPERTY DETERMINED DRAINAGE WILL WORK. APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 6/3/24 REVISED SITE PLAN SUBMITTED, FINAL SURVEY PASSING AS NOTED. _________________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES AS STATED FROM LAST TWO INSPECTIONS YOU NEED TO HAVE NEW SITE PLAN THAT SHOWS THE DRAINAGE WITH THE POOL ON THE SITE PLAN. ------------------------------------------------------------------------------------- 5/21/2024 - PREVIOUS INSPECTION NOTES 5/21/24 AFTER CONFERRING WIT GABE IT HAS BEEN DETERMINED YOU WILL NEED TO SUBMIT A REVISED SITE PLAN SHOWING THE POOL AND THE NEW DRAINAGE PATTERN CONFORMING TO COPC DRAINAGE STANDARS.. YOU CAN NOT USE YOUR OLD SITE PLAN AS THE POOL WAS NOT INCLUDED BUT IS CURRENTLY THERE AND AFFECTS THE DRAINAGE PATTERN. DRAINAGE IS REQUIRED TO SHED FROM THE BACK YARD TO THE FRONT SWALE . IT CURRENTLY SHOWS THE DRAINAGE NEGATIVELY AFFECTING THE ADJOINING PROPERTY IN THE REAR 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 14 Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) . 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 7:37:51 AM *** 5/6/24 Your site plan did not indicate a pool, with the addition of the pool on your final survey your rear drainage off of the pool deck in the rear all flows back towards the adjoing rear property, negatively affecting them. Your drainage must go from the rear to the front swale as indicated in your site plan. Inspector Notes from Inspection 9270 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/04/2024 | Disapproved - NO FEE | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 6/4/2024 9:20:12 AM *** Need sewer clean out located . Inspector Notes from Inspection 9035 No irrigation, no cross connections. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/03/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/3/24 REVISED SITE PLAN SUBMITTED, FINAL SURVEY PASSING AS NOTED. _________________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES AS STATED FROM LAST TWO INSPECTIONS YOU NEED TO HAVE NEW SITE PLAN THAT SHOWS THE DRAINAGE WITH THE POOL ON THE SITE PLAN. ------------------------------------------------------------------------------------- 5/21/2024 - PREVIOUS INSPECTION NOTES 5/21/24 AFTER CONFERRING WIT GABE IT HAS BEEN DETERMINED YOU WILL NEED TO SUBMIT A REVISED SITE PLAN SHOWING THE POOL AND THE NEW DRAINAGE PATTERN CONFORMING TO COPC DRAINAGE STANDARS.. YOU CAN NOT USE YOUR OLD SITE PLAN AS THE POOL WAS NOT INCLUDED BUT IS CURRENTLY THERE AND AFFECTS THE DRAINAGE PATTERN. DRAINAGE IS REQUIRED TO SHED FROM THE BACK YARD TO THE FRONT SWALE . IT CURRENTLY SHOWS THE DRAINAGE NEGATIVELY AFFECTING THE ADJOINING PROPERTY IN THE REAR 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 14 Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) . 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 7:37:51 AM *** 5/6/24 Your site plan did not indicate a pool, with the addition of the pool on your final survey your rear drainage off of the pool deck in the rear all flows back towards the adjoing rear property, negatively affecting them. Your drainage must go from the rear to the front swale as indicated in your site plan. Inspector Notes from Inspection 9270 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/3/24 UPON WALKING THE PROPERTY DETERMINED DRAINAGE WILL WORK. APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 6/3/24 REVISED SITE PLAN SUBMITTED, FINAL SURVEY PASSING AS NOTED. _________________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES AS STATED FROM LAST TWO INSPECTIONS YOU NEED TO HAVE NEW SITE PLAN THAT SHOWS THE DRAINAGE WITH THE POOL ON THE SITE PLAN. ------------------------------------------------------------------------------------- 5/21/2024 - PREVIOUS INSPECTION NOTES 5/21/24 AFTER CONFERRING WIT GABE IT HAS BEEN DETERMINED YOU WILL NEED TO SUBMIT A REVISED SITE PLAN SHOWING THE POOL AND THE NEW DRAINAGE PATTERN CONFORMING TO COPC DRAINAGE STANDARS.. YOU CAN NOT USE YOUR OLD SITE PLAN AS THE POOL WAS NOT INCLUDED BUT IS CURRENTLY THERE AND AFFECTS THE DRAINAGE PATTERN. DRAINAGE IS REQUIRED TO SHED FROM THE BACK YARD TO THE FRONT SWALE . IT CURRENTLY SHOWS THE DRAINAGE NEGATIVELY AFFECTING THE ADJOINING PROPERTY IN THE REAR 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 14 Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) . 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 7:37:51 AM *** 5/6/24 Your site plan did not indicate a pool, with the addition of the pool on your final survey your rear drainage off of the pool deck in the rear all flows back towards the adjoing rear property, negatively affecting them. Your drainage must go from the rear to the front swale as indicated in your site plan. Inspector Notes from Inspection 9270 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/29/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: AS STATED FROM LAST TWO INSPECTIONS YOU NEED TO HAVE NEW SITE PLAN THAT SHOWS THE DRAINAGE WITH THE POOL ON THE SITE PLAN. ------------------------------------------------------------------------------------- 5/21/2024 - PREVIOUS INSPECTION NOTES 5/21/24 AFTER CONFERRING WIT GABE IT HAS BEEN DETERMINED YOU WILL NEED TO SUBMIT A REVISED SITE PLAN SHOWING THE POOL AND THE NEW DRAINAGE PATTERN CONFORMING TO COPC DRAINAGE STANDARS.. YOU CAN NOT USE YOUR OLD SITE PLAN AS THE POOL WAS NOT INCLUDED BUT IS CURRENTLY THERE AND AFFECTS THE DRAINAGE PATTERN. DRAINAGE IS REQUIRED TO SHED FROM THE BACK YARD TO THE FRONT SWALE . IT CURRENTLY SHOWS THE DRAINAGE NEGATIVELY AFFECTING THE ADJOINING PROPERTY IN THE REAR 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 14 Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) . 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 7:37:51 AM *** 5/6/24 Your site plan did not indicate a pool, with the addition of the pool on your final survey your rear drainage off of the pool deck in the rear all flows back towards the adjoing rear property, negatively affecting them. Your drainage must go from the rear to the front swale as indicated in your site plan. Inspector Notes from Inspection 9270 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/21/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 5/21/24 AFTER CONFERRING WIT GABE IT HAS BEEN DETERMINED YOU WILL NEED TO SUBMIT A REVISED SITE PLAN SHOWING THE POOL AND THE NEW DRAINAGE PATTERN CONFORMING TO COPC DRAINAGE STANDARS.. YOU CAN NOT USE YOUR OLD SITE PLAN AS THE POOL WAS NOT INCLUDED BUT IS CURRENTLY THERE AND AFFECTS THE DRAINAGE PATTERN. DRAINAGE IS REQUIRED TO SHED FROM THE BACK YARD TO THE FRONT SWALE . IT CURRENTLY SHOWS THE DRAINAGE NEGATIVELY AFFECTING THE ADJOINING PROPERTY IN THE REAR 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 14 Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) . 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 7:37:51 AM *** 5/6/24 Your site plan did not indicate a pool, with the addition of the pool on your final survey your rear drainage off of the pool deck in the rear all flows back towards the adjoing rear property, negatively affecting them. Your drainage must go from the rear to the front swale as indicated in your site plan. Inspector Notes from Inspection 9270 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/06/2024 | Disapproved - NO FEE | FSLADISH |
| Note: *** NOTES ADDED BY FSLADISH 5/6/2024 7:37:51 AM *** 5/6/24 Your site plan did not indicate a pool, with the addition of the pool on your final survey your rear drainage off of the pool deck in the rear all flows back towards the adjoing rear property, negatively affecting them. Your drainage must go from the rear to the front swale as indicated in your site plan. Inspector Notes from Inspection 9270 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 03/25/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 02/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/20/24 READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U-CROSS CONNECTION | 01/23/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U - SEWER TIE IN | 01/23/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/23/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 12/15/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/12/2023 | Approval - Private Provider | MRAMOS |
| LATH/BRICK/ WATER BARRIER | 12/05/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 11/16/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 11/08/2023 | Approval - Private Provider | PPROVIDER |
| TIE DOWN | 11/08/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/08/2023 | Approval - Private Provider | PPROVIDER |
| DOWN CELL | 11/08/2023 | Approval - Private Provider | PPROVIDER |
| DOWN CELL | 11/07/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/07/2023 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 11/07/2023 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 10/30/2023 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 09/27/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 08/21/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/16/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/11/2023 | Approval - Private Provider | PPROVIDER |
| Note: 8/10/2023 2:55:03 PM- PREVIOUS INSPECTION NOTES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/10/2023 | Disapproved- Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 07/21/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/10/2024 | 06/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Hold will remain until final survey inspection is approved. | |||
| SW1 | HOLD | 05/29/2024 | 05/29/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Hold will remain until final survey inspection is approved. | |||
| ZON | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/21/2023 | 08/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/21/2023 | 08/21/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/28/2023 | 06/28/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM NOC incorrect. Needs to be State of florida, County of Flagler. | |||
| BLD | HOLD | 06/05/2023 | 06/05/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles or of a similar nomenclature. 107.3.5 | |||
| BLD | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/26/2023 | 05/30/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a shop drawing approval stamp. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5 | |||
| ZON | COMPLETE | 05/26/2023 | 05/26/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/26/2023 | 06/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/26/2023 | 05/30/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/17/2023 | 07/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/16/2023 | 05/17/2023 |
| Note: Held By: JPI 1. Product 11470 produced no results based on a recent DBPR inquiry. Please cure. 107.2.4 https://www.floridabuilding.org/pr/pr_app_lst.aspx | |||
| CUSVC | COMPLETE | 05/16/2023 | 05/19/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/16/2023 | 05/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/16/2023 | 05/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/16/2023 | 05/17/2023 |
| LOCATE | COMPLETE | 05/16/2023 | 05/18/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/16/2023 | 05/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/16/2023 | 05/23/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) NEED TO HAVE EXISTING ELEVATIONS BEHIND BACK PROPERTY LINE 10' INTO THE IMPROVED LOT 2) WATER IS IMPACTING THE LOT TO THE LEFT OF YOURS | |||
| ZON | HOLD | 05/16/2023 | 05/17/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan shows a paver driveway. Please provide a right of way agreement signed by all owners of the property and notarized. Once electronic copy is approved we will ask for the original to be turned into us to send for recording. | |||
| BADMIN | COMPLETE | 05/16/2023 | 05/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤505.39 | 06/26/2023 |
| WATER- TURN ON | ¤25.00 | 06/26/2023 |
| WATER- TURN ON | ¤25.00 | 06/26/2023 |
| ADJUSTMENT 50% | (¤143.70) | 06/26/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/26/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 06/26/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤257.40 | 06/26/2023 |
| CONNECTION FEES | ¤1,166.26 | 06/26/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/26/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/26/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/26/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/26/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/26/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/26/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/26/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/26/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/26/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/26/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/26/2023 |
| SURCHARGE FS 533.721 | ¤3.69 | 06/26/2023 |
| SURCHARGE - FS 468.631 | ¤5.53 | 06/26/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/26/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/26/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/26/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/26/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/26/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/26/2023 |
| SEWER CREDIT | (¤1,342.00) | 06/26/2023 |
| SEWER INSPECTION | ¤25.00 | 06/26/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/26/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/26/2023 |
| SITE PLAN 30 | ¤30.00 | 06/26/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,480.94 |