I want to search for...

Permit #2023050886

Permit Details

Status: COED

Parcel Id: 02-12-31-0000-01010-0090
Total Square Footage: 12000 sqft
Block: 01010
Subdivision: -
Job Phone: 305-799-4886
Location Address: 6255 COLBERT LN
Type: BC - BUILDING COMMERCIAL
Issue Date: 01/08/2024
NOC: RECORDED
Applicant name: JOHN EDWARD JAMES
Owner: FAE COLBERT LANE LLC

Address

SUITE 1835

SOUTHFIELD, MI 48076

Address

ONE TOWNE SQUARE

SOUTHFIELD, MI 48076

Lot: 0090
Contracted Stated Job Value: ¤800,000.00
Job Description: Metal storage building with interior office fit out.
Type: CN

Contractor

JAMES COMMERCIAL DEVELOPMENT INC
Status Location Address State License Number Phone
ACTIVE

9950 KIRCHHERR

WEST PALM BEACH, FL 33411

CGC1514256 (Exp: 08/31/2026) 305-799-4886

Sub Contractors

JOHN EDWARD JAMES
Status Location Address State License Number Phone
ACTIVE

9950 KIRCHHERR

WEST PALM BEACH, FL 33411

CGC1514256 (Exp: 08/31/2026) 305-799-4886
JOHN EDWARD JAMES
Status Location Address State License Number Phone
ACTIVE

160 CYPRESS POINT PKWY, D-102

PALM COAST, FL 32164

CCC1328573 (Exp: 08/31/2026) 305-799-4886
NEVILLE ROY BENNETT
Status Location Address State License Number Phone
ACTIVE

1802 IMPERIAL PALM DRIVE

APOPKA, FL 32172

EC0003124 (Exp: 08/31/2026) 407-920-6566
GARY S WELBORN
Status Location Address State License Number Phone Fax
ACTIVE

1709 North Nova Road

Holly Hill, 32117

CFC1426839 (Exp: 08/31/2026) (386) 257-1172 386-252-5979
KERRY DWAIN AYLESWORTH II
Status Location Address Mailing Address State License Number Phone
ACTIVE

2820 LEWIS SPEEDWAY

ST AUGUSTINE, FL 32084

STE B

ST AUGUSTINE, FL 32084

CAC1820713 (Exp: 08/31/2026) 904-342-5709

Inspection History

Type Request Date Result Inspector
EXTERIOR ARCHITECTURAL FEATURES 10/28/2024 APPROVED RPICATAGI
FIRE FINAL 10/25/2024 APPROVED LMILLER
BUILDING FINAL 10/25/2024 FINAL APPROVED LMILLER
Note: Inspector Notes from Inspection 3440 Inspector Notes from Inspection 3485 Inspector Notes from Inspection 3510 Inspector Notes from Inspection 3520 Inspector Notes from Inspection 3460 Inspector Notes from Inspection 3470 *** NOTES ADDED BY RMARTIN 7/12/2024 1:29:12 PM *** NEED TO SEAL DUCT IN BACK CLOSET AREA, NEED TO STRAP METAL DUCT CONNECTED TO MOTOR IN RESTROOM, NEED TO COVER ELECTRICAL BOX ON EXHAUST MOTOR 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
FIRE FINAL 10/24/2024 CANCELLED BY APPLICANT WEB
U - UTILITY COMMERCIAL FINAL 10/24/2024 FINAL APPROVED LFITZGERALD
ELECTRIC FINAL 10/22/2024 APPROVED RMARTIN
Note: Inspector Notes from Inspection 3210 *** NOTES ADDED BY RMARTIN 6/12/2024 10:15:45 AM *** power to disconnects only 5/28/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 5/28/2024 2:01:21 PM *** Need to have revision approved prior to scheduling the inspection 5/24/2024 - PREVIOUS INSPECTION NOTES
PLUMBING FINAL 08/15/2024 APPROVED MGIBSON
Note: 8/1/2024 - PREVIOUS INSPECTION NOTES
PLUMBING FINAL 08/01/2024 CANCELLED BY APPLICANT MGIBSON
HVAC FINAL 07/18/2024 FINAL APPROVED CPISCITELLI
Note: 7/17/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 7/12/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 will look at wrap and exhaust duct connection on aboveceiling inspection
HVAC FINAL 07/17/2024 CANCELLED BY APPLICANT CPISCITELLI
Note: New inspection due to canceled inspection 7/12/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 will look at wrap and exhaust duct connection on aboveceiling inspection
HVAC FINAL 07/16/2024 CANCELLED BY APPLICANT WEB
Note: 7/12/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 will look at wrap and exhaust duct connection on aboveceiling inspection
WALL SHEATHING 07/16/2024 APPROVED - AS NOTED PBUCKLEY
Note: Inspector Notes from Inspection 3510 Inspector Notes from Inspection 3520 Inspector Notes from Inspection 3460 Inspector Notes from Inspection 3470 *** NOTES ADDED BY RMARTIN 7/12/2024 1:29:12 PM *** NEED TO SEAL DUCT IN BACK CLOSET AREA, NEED TO STRAP METAL DUCT CONNECTED TO MOTOR IN RESTROOM, NEED TO COVER ELECTRICAL BOX ON EXHAUST MOTOR 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
INSULATION 07/16/2024 APPROVED - AS NOTED PBUCKLEY
Note: Inspector Notes from Inspection 3520 Inspector Notes from Inspection 3460 Inspector Notes from Inspection 3470 *** NOTES ADDED BY RMARTIN 7/12/2024 1:29:12 PM *** NEED TO SEAL DUCT IN BACK CLOSET AREA, NEED TO STRAP METAL DUCT CONNECTED TO MOTOR IN RESTROOM, NEED TO COVER ELECTRICAL BOX ON EXHAUST MOTOR 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
STOREFRONT 07/16/2024 APPROVED - AS NOTED PBUCKLEY
Note: Inspector Notes from Inspection 3460 Inspector Notes from Inspection 3470 *** NOTES ADDED BY RMARTIN 7/12/2024 1:29:12 PM *** NEED TO SEAL DUCT IN BACK CLOSET AREA, NEED TO STRAP METAL DUCT CONNECTED TO MOTOR IN RESTROOM, NEED TO COVER ELECTRICAL BOX ON EXHAUST MOTOR 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
ROOF SHEATHING / BRACE / TIE DOWN 07/16/2024 APPROVED - AS NOTED PBUCKLEY
Note: Inspector Notes from Inspection 3470 *** NOTES ADDED BY RMARTIN 7/12/2024 1:29:12 PM *** NEED TO SEAL DUCT IN BACK CLOSET AREA, NEED TO STRAP METAL DUCT CONNECTED TO MOTOR IN RESTROOM, NEED TO COVER ELECTRICAL BOX ON EXHAUST MOTOR 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
FRAMING 07/16/2024 APPROVED - AS NOTED PBUCKLEY
Note: Inspector Notes from Inspection 3485 Inspector Notes from Inspection 3510 Inspector Notes from Inspection 3520 Inspector Notes from Inspection 3460 Inspector Notes from Inspection 3470 *** NOTES ADDED BY RMARTIN 7/12/2024 1:29:12 PM *** NEED TO SEAL DUCT IN BACK CLOSET AREA, NEED TO STRAP METAL DUCT CONNECTED TO MOTOR IN RESTROOM, NEED TO COVER ELECTRICAL BOX ON EXHAUST MOTOR 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
HVAC FINAL 07/12/2024 CANCELLED BY APPLICANT CPISCITELLI
Note: Inspector Notes from Inspection 3140 will look at wrap and exhaust duct connection on aboveceiling inspection
ABOVE CEILING 07/12/2024 APPROVED - AS NOTED RMARTIN
Note: *** NOTES ADDED BY RMARTIN 7/12/2024 1:29:12 PM *** NEED TO SEAL DUCT IN BACK CLOSET AREA, NEED TO STRAP METAL DUCT CONNECTED TO MOTOR IN RESTROOM, NEED TO COVER ELECTRICAL BOX ON EXHAUST MOTOR 6/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
FIREWALL FINAL 06/24/2024 APPROVED FWILLIS
FIREWALL DRYWALL NAILING 06/24/2024 APPROVED FWILLIS
FIREWALL PENETRATIONS 06/24/2024 APPROVED FWILLIS
Note: 6/18/2024 - PREVIOUS INSPECTION NOTES
FIREWALL PENETRATIONS 06/18/2024 CANCELLED BY APPLICANT JWALKER
HVAC ROUGH 06/14/2024 APPROVED - AS NOTED CPISCITELLI
Note: will look at wrap and exhaust duct connection on aboveceiling inspection
ABOVE CEILING 06/14/2024 Disapproved - NO FEE RMARTIN
Note: *** NOTES ADDED BY RMARTIN 6/14/2024 2:13:21 PM *** Firewall Final, Firewall Penetrations, Firewall Nailing, Roof sheathing/ties, Needs to be done prior to above ceiling being scheduled, Also need to put extention rings and metal plates on boxes in firewall then firecaulk, wrap metal duct in back area and exhust.
PLUMBING 2ND ROUGH 06/13/2024 APPROVED MGIBSON
Note: 2/2/2024 - PREVIOUS INSPECTION NOTES THIS WAS A FOR ''OFFICE SIDE ONLY, MECHANICAL ROOM NOT COMPLETED
HVAC ROUGH 06/12/2024 CANCELLED BY APPLICANT CPISCITELLI
Note: 6/5/2024 - PREVIOUS INSPECTION NOTES Inspected fire damper installation 4/26/2024 - PREVIOUS INSPECTION NOTES . Inspected all flex drops and connections
ELECTRIC - EARLY POWER 06/12/2024 APPROVED - AS NOTED RMARTIN
Note: *** NOTES ADDED BY RMARTIN 6/12/2024 10:15:45 AM *** power to disconnects only 5/28/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 5/28/2024 2:01:21 PM *** Need to have revision approved prior to scheduling the inspection 5/24/2024 - PREVIOUS INSPECTION NOTES
BLD - SEWER TIE IN 06/12/2024 APPROVED MGIBSON
GRAVITY SEWER 06/12/2024 APPROVED MGIBSON
HVAC ROUGH 06/05/2024 PARTIALLY APPROVED CPISCITELLI
Note: Inspected fire damper installation 4/26/2024 - PREVIOUS INSPECTION NOTES . Inspected all flex drops and connections
HVAC ROUGH 05/31/2024 Disapproved - NO FEE CPISCITELLI
Note: Missing damper for exhaust 5/23/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY CPISCITELLI 5/23/2024 10:22:07 AM *** Fire dampers not installed to plan and only one damper installed 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY CPISCITELLI 5/7/2024 9:48:30 AM *** Dampers not installed to plan. Need to install dampers to UL listing with Fire damper angle 4/26/2024 - PREVIOUS INSPECTION NOTES . Inspected all flex drops and connections
ELECTRIC - EARLY POWER 05/28/2024 Disapproved - NO FEE RMARTIN
Note: *** NOTES ADDED BY RMARTIN 5/28/2024 2:01:21 PM *** Need to have revision approved prior to scheduling the inspection 5/24/2024 - PREVIOUS INSPECTION NOTES
ELECTRIC - EARLY POWER 05/24/2024 CANCELLED BY APPLICANT RMARTIN
HVAC ROUGH 05/23/2024 Disapproved -FEE REQUIRED CPISCITELLI
Note: *** NOTES ADDED BY CPISCITELLI 5/23/2024 10:22:07 AM *** Fire dampers not installed to plan and only one damper installed 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY CPISCITELLI 5/7/2024 9:48:30 AM *** Dampers not installed to plan. Need to install dampers to UL listing with Fire damper angle 4/26/2024 - PREVIOUS INSPECTION NOTES . Inspected all flex drops and connections
ELECTRIC 2ND ROUGH 05/21/2024 APPROVED RMARTIN
Note: 2/12/2024 - PREVIOUS INSPECTION NOTES 2/12/24 Still need to look at East wall, South wall, small section of West wall, and ceiling ,Highlighted what is passed on print 2/2/2024 - PREVIOUS INSPECTION NOTES still need to inspect stand alone room in corner and 4 outlets missing on garage side framed wall, need revision by final showing changes circled on print
HVAC ROUGH 05/07/2024 Disapproved -FEE REQUIRED CPISCITELLI
Note: *** NOTES ADDED BY CPISCITELLI 5/7/2024 9:48:30 AM *** Dampers not installed to plan. Need to install dampers to UL listing with Fire damper angle 4/26/2024 - PREVIOUS INSPECTION NOTES . Inspected all flex drops and connections
HVAC ROUGH 04/26/2024 PARTIALLY APPROVED CPISCITELLI
Note: . Inspected all flex drops and connections
HVAC ROUGH 03/27/2024 PARTIALLY APPROVED CPISCITELLI
Note: Inspected seams for trunk line in offices
ELECTRIC 2ND ROUGH 02/12/2024 PARTIALLY APPROVED MKRASKI
Note: 2/12/24 Still need to look at East wall, South wall, small section of West wall, and ceiling ,Highlighted what is passed on print 2/2/2024 - PREVIOUS INSPECTION NOTES still need to inspect stand alone room in corner and 4 outlets missing on garage side framed wall, need revision by final showing changes circled on print
LATH/BRICK/WATER BARRIER 02/06/2024 APPROVED FWILLIS
ELECTRIC 2ND ROUGH 02/02/2024 PARTIALLY APPROVED RMARTIN
Note: still need to inspect stand alone room in corner and 4 outlets missing on garage side framed wall, need revision by final showing changes circled on print
PLUMBING 2ND ROUGH 02/02/2024 PARTIALLY APPROVED MGIBSON
Note: THIS WAS A FOR ''OFFICE SIDE ONLY, MECHANICAL ROOM NOT COMPLETED
FRAMING 02/02/2024 APPROVED FWILLIS
FIREWALL FRAMING 02/01/2024 APPROVED FWILLIS
Note: 2/1/24 - ITEMS CORRECTED. 1/16/2024 - PREVIOUS INSPECTION NOTES 01-16-2023 1. A101 3C firewall approved along long wall. Check for openings to be fire rated lumber at next inspection. 2. 1C Womens and conference room top plate needs to be fastened to steel. 3. Storage room 014 room eliminated. Service room 013 needs a revision showing the 2 x 10 framing and OSB ceiling above due to areas being called out as firewalls.
FOUNDATION SURVEY - OFFICE USE ONLY 02/01/2024 APPROVED DLEAP
FIREWALL FRAMING 01/16/2024 PARTIALLY APPROVED AGAETANO
Note: 01-16-2023 1. A101 3C firewall approved along long wall. Check for openings to be fire rated lumber at next inspection. 2. 1C Womens and conference room top plate needs to be fastened to steel. 3. Storage room 014 room eliminated. Service room 013 needs a revision showing the 2 x 10 framing and OSB ceiling above due to areas being called out as firewalls.

Review History

Department Status Date In Date Out
BLD COMPLETE 10/25/2024 10/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/01/2024 07/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 05/27/2024 06/07/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 05/16/2024 05/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 01/31/2024 02/12/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Revise mechanical plan sheets
ELEC HOLD 01/31/2024 02/02/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit new electrical lighting plan
PLENG COMPLETE 01/31/2024 02/01/2024
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
MECH COMPLETE 10/19/2023 10/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 10/10/2023 10/19/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct penetration in Electrical room requires a fire damper. Provide Fire damper in wall.on duct layout per 717.5.4 FBC Building 2020 7Th edition Or remove reference for fire partition on plans. Fire partition not required for occupancy separation. 2. Square footage on heatload and ventilation calculation does not match. Revise square footage
ELEC COMPLETE 09/29/2023 09/29/2023
Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM
MECH HOLD 09/12/2023 09/20/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Heat load calculation shows 3000 square feet. Provide Calculation with correct square footage for both warehouse and offices. 2. Provide fire damper in rated wall between storage room and electrical room.
FI1 COMPLETE 09/12/2023 09/20/2023
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
PLUM COMPLETE 09/12/2023 09/20/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BLD COMPLETE 09/12/2023 09/27/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM 1. Reconsile code analysis. Costruction type says 11B sprinklered. and says non sprinklered under Fire Code it says non sprinklered. 2. Walls are called out as 1Hr rated. Wall section details says no fire rating. Revise.
MECH HOLD 06/26/2023 06/27/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Requirements need to be 100% met in comcheck 2. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 2020 7Th edition 3. Referce FBC Mechanical 2020 7th edition 4. Remove reference to Osceola county on code analysis 5. Separate ventilation calculation and use occupant density from Table 403.3.1.1 FBC Mechanical 2020 7Th edition 6. Remove note #5 on reference notes Plan sheet M1 and M2. Provide size required for space. 7. Remove/Revise note #3 on refernce notes Plan sheet M2 and note #1 on Plan sheet M1. Exemption is for duct less than 100 square inches not feet. Also reference correct code year and addition. 8. Clarify research and development. What is being made/built?. May be further review based on response. (Second Request)
ELEC HOLD 06/26/2023 07/10/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Requirements need to be 100% met in comcheck 2. Need emergency lighting where al electrical equipment is loacated. NEC 2017 110.26 (D) 2nd REQUEST
FI1 HOLD 06/26/2023 07/11/2023
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Please provide a written response to each comment below in a response letter and provide clouded response changes on plan sheets and add page locations for each response. Reapeat comments, please resolve. 1. Please provide detail for Fire Fighter Safety Building Marking System per FFPC 1 Annex E and AHJ And place the following note on the cover sheet: Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper design and notification for the Fire Fighters Safety Building Marking System prior to placement. 2. Please show location of fire sprinkler riser room for review.
PLUM HOLD 06/26/2023 07/12/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Comments below per the 2020 Florida Building Code-Plumbing 1. REVISED COMMENT: PLAN SHEET S.05 CONTAINS ENTIRELY DIFFERENT ROOF DRAINAGE INFORMATION THAN PLAN SHEET A-102. REVISE A-102 TO MATCH S.05. REMOVE FRAMED CRICKETS REFERENCE. SHOW GUTTER AND DOWN PIPE SYSTEM CONSISTENT WITH S.05. REVISE CALCULATIONS BASED ON S.05. REVISE S.05 TO REFLECT SECONDARY FORM OF DRAINAGE. Provide complete roof storm drainage plans. Roof appears to be enclosed by parapets on all four sides. Provide roof design based on rainfall rates and maximum possible depth of water on roof. Materials specifications per Section1102, roof drains per Section1105, conductors and leaders including sizing of drain piping, parapet wall scuppers, size of roof gutters per Section1106 and secondary roof drains per Section 1108.
BLD HOLD 06/26/2023 07/12/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM General NEW COMMENT: YOU’VE ADDED NEW ARCHITECTURAL PLAN SHEETS TO THE SUBMITTAL. PLEASE UPDATE PLAN SHEET G-100 AND PROVIDE A COMPLETE INDEX OF PLAN SHEETS. INCLUDE INDEX OF ALL STRUCTURAL PLAN SHEETS NEW COMMENT: PLAN SHEET S.02 IN THE GENERAL FOUNDATION NOTES SECTION REFERENCES SOIL BEARING CAPACITY OF 2,500 PSF. THIS IS NOT CONSISTENT WITH THE GEOTECHNICAL INVESTIGATION OR THE SOIL BEARING CAPACITY ON PLAN SHEET S.01DS. CHANGE TO 2,000 PSF AND ADD REFERENCE TO GEOTECHNICAL INVESTIGATION REPORT. 1. REPEAT COMMENT: Provide complete building design criteria including roof live (rain) and dead loads, floor live and dead loads, rooftop equipment dead loads (if any), design wind speed, wind exposure category, component and cladding loads, wind pressures / coefficients, etc. Sections 107.2.3, 1603, 1603.1.4, 1603.1.8, 1603.1.9, 1606, 1607 and Table 1607.1, 1611.1. Note required floor design load requirements for Manufacturing (No. 20), 2. REPEAT COMMENT: Provide garage door design loads. Section 1609.6, Table 1609.6(1) and adjusted per factors in Table 1609.6(2). 3. REPEAT COMMENT: Provide Risk Category of building. Section 1604.5. If determination of Risk Category results in any design safety factors per Table 1604.5 or ASCE 7 show factors. 4. REPEAT COMMENT: Provide complete set of steel building erection plans signed and sealed by a Florida licensed professional engineer. Plans to reference the 2020 Florida Building Code-Building and all required live, dead, component cladding loads, wind pressures / coefficients, concentrated loads for any rooftop equipment. 5. REPEAT COMMENT: Provide complete Florida Product Approval worksheet for all exterior components. Several component types missing including metal roof panels, storefronts, steel shutters, etc. 6. REPEAT COMMENT: Provide complete wall sections and framing details for all non-combustible interior partition wall types. Plan Sheet G-101 1. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Provide complete UL U465 File construction details somewhere in plans. 2. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Under Applicable Codes Section, remove reference to Osceola County, Florida. If you choose to replace this comment, replace it with City of Palm Coast, Florida. 3. REPEAT COMMENT: REVIED PLAN SHEET NOT SUBMITTED. Add the following code references. 2020 FBC - Mechanical 7th Edition, 2020 FBC - Energy Conservation 7th Edition, 2020 FBC - Plumbing 7th Edition 4. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Under Use and Occupancy Classification, please explain choice of S1 - Storage occupancy. Based on description of "research and development area", building occupancy is likely F1 and should be classified accordingly. See Section 302, 306 and 311 for distinctions between F1 and S1 occupancies. 5. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Under Height and Area Section show the following based on Occupancy Types, IIB Construction Type.and fully sprinkled throughout and any allowable frontage increases. Section 504, 506, 508. • Actual building height vs. allowable building height • Actual number of stories vs. allowable number of stories • Actual building floor area vs. allowable building floor area 6. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Solve height, stories and areas for most restrictive occupancy type. Sections 504, 504.2, 506.2.2, 508.1 and Equation 5-1. 7. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Determine main occupancy and accessory occupancy of building. Section 508.2. Determine allowable building height for main occupancy of building Section 508.2.2. Determine allowable building area for the main occupancy of the building. Show that the aggregate floor area of the accessory occupancy does not occupy more than 10 percent of the floor area. 8. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Under Means of Egress section, show how occupant load has been determined. Two calculations required, one for the B occupancy portion of the building and a second for the S occupancy portion of the building. Section 1004.1, Table 1004.1. 9. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Under Plumbing Fixtures Section add required service sink and drinking fountain for B and S occupancies. Section 2901, 2902, Table 2902.1. A single service sink and drinking fountain is acceptable to serve both occupancies. It is understood these fixtures are shown in plumbing plans but they also need to be called out here. 10. REPEAT COMMENT: REVISED PLAN SHEET NOT SUBMITTED. Life Safety Plan and Floor Plan show presence of vehicle entry doors on both ends of the building. Is this a motor vehicle related occupancy under Section 406? Will this space require mechanical ventilation per the FBC - Mechanical. Please advise. Plan Sheet A-102 1. REPEAT COMMENT: Provide framing plans for rooftop crickets. Plan Sheet A-200 1. REPAT COMMENT: EXTERIOR WALL SECTION DETAILS ON PLAN SHEET A-400 MISSING A SIGNIFICANT AMOUNT OF INFORMATION INCLUDING WALL CLADDING BACKING MATERIALS, ATTACHMENT DETAILS FOR BACKING, WATER RESISTIVE BARRIER, EIFS MANUFACTURER TYPE (INCLUDE ICC ES EVALUATION REPORT FOR EIFS SYSTEM), DRAINAGE PLANE, WEEP SCREED, ATTACHMENT DETAILS FOR AWNINGS, ATTACHMENT DETAILS AND MATERIAL SPECIFICATIONS FOR INSULATED ALUMINUM SANDWICH PANELS, PARAPET CONSTRUCTION DETAILS. ATTACHMENT FOR VENEER STONE FINISH (ADHERED, MECHANICAL FASTENED, ETC???) FLASHING DETAILS FOR DOORS, WINDOWS, STOREFRONT, DIS-SIMILAR CLADDING MATERIALS ETC. Provide complete exterior wall sections from interior finishes through to exterior cladding materials. Include all required details to produce complete wall sections for each exterior wall type from foundation through to roof parapets. Include parapet wall construction details parapet copings, flashings and counter flashings, exterior wall framing construction, materials and fastening details, roof connection and flashing details, backing materials and fastening details for exterior cladding, flashing details at door and windows and dissimilar materials. Sections 107.2.4, 107.3.5, 1403,1, 1403.2, 1403.3, 1404.1, 1404.2, 1404.5, 1404.11, 1405.3, 1405.4, 1405.6, 1405.10, 1408. 2. REPEAT COMMENT: Provide specifications for EIFS system and International Code Council (ICC) Evaluation Report for EIFS to be used. Provide complete assembly details including required water resistive barrier type, weep screed, drainage plane, backing materials, finish distance above concrete and vegetated ground areas. Sections 107.2.4, 107.3.5, 1403,1, 1403.2, 1403.3, 1404.1, 1404.2, 1404.5, 1404.11, 1405.3, 1405.4, 1405.6, 1405.10, 1408. 3. REPEAT COMMENT: Provide specifications for Ledgestone Veneer Base including framing, fastening and backing details. Sections 107.2.4, 107.3.5, 1403,1, 1403.2, 1403.3, 1404.1, 1404.2, 1404.5, 1404.11, 1405.3, 1405.4, 1405.6, 1405.10, 1408. 4. REPEAT COMMENT: Provide construction, attachment and fastening details for exterior awnings, including vinyl and prefabricated metal entrance canopy. Identify prefabricated metal entrance canopy as a deferred submittal and note the design will be provided to building department at a later date and prior to installation and inspection. Sections 1603, 1`604, 1605, 1606, 1607., Plan Sheet A-600 (all comments per the 2020 Florida Building Code-Accessibility) 1. OK 2. OK 3. OK 4. OK 5. OK 6. REVISED COMMENT: YOU REMOVED ENLARGED BATHROOM FLOOR PLAN FROM PLAN SHEET A-600. RETURN IT OR ADD IT TO ANOTHER PLAN SHEET. ADDRESS THIS COMMENT: Ambulatory accessible toilet compartment in women’s bathroom does not appear to comply with width requirements and does not include grab bars. Sections 604.8.2.1604.8.2.2 404, 604.8.2.3
MECH HOLD 06/21/2023 06/26/2023
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ELEC HOLD 06/21/2023 06/26/2023
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
FI1 HOLD 06/21/2023 06/26/2023
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
PLUM HOLD 06/21/2023 06/26/2023
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
BLD HOLD 06/21/2023 06/26/2023
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
ARCHR COMPLETE 05/16/2023 05/25/2023
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD HOLD 05/16/2023 05/31/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM General 1. Provide complete building design criteria including roof live (rain) and dead loads, floor live and dead loads, rooftop equipment dead loads (if any), design wind speed, wind exposure category, component and cladding loads, wind pressures / coefficients, etc. Sections 107.2.3, 1603, 1603.1.4, 1603.1.8, 1603.1.9, 1606, 1607 and Table 1607.1, 1611.1. Note required floor design load requirements for Manufacturing (No. 20), 2. Provide garage door design loads. Section 1609.6, Table 1609.6(1) and adjusted per factors in Table 1609.6(2). 3. Provide Risk Category of building. Section 1604.5. If determination of Risk Category results in any design safety factors per Table 1604.5 or ASCE 7 show factors. 4. Provide complete set of steel building erection plans signed and sealed by a Florida licensed professional engineer. Plans to reference the 2020 Florida Building Code-Building and all required live, dead, component cladding loads, wind pressures / coefficients, concentrated loads for any rooftop equipment. 5. Provide complete Florida Product Approval worksheet for all exterior components. Several component types missing including metal roof panels, storefronts, steel shutters, etc. 6. Provide complete wall sections and framing details for all non-combustible interior partition wall types. Florida Building Code-Plumbing 1. Provide complete roof storm drainage plans. Roof appears to be enclosed by parapets on all four sides. Provide roof design based on rainfall rates and maximum possible depth of water on roof. Materials specifications per Section1102, roof drains per Section1105, conductors and leaders including sizing of drain piping, parapet wall scuppers, size of roof gutters per Section1106 and secondary roof drains per Section 1108. Plan Sheet G-101 1. Provide complete UL U465 File construction details somewhere in plans. 2. Under Applicable Codes Section, remove reference to Osceola County, Florida. If you choose to replace this comment, replace it with City of Palm Coast, Florida. 3. Add the following code references. 2020 FBC - Mechanical 7th Edition, 2020 FBC - Energy Conservation 7th Edition, 2020 FBC - Plumbing 7th Edition 4. Under Use and Occupancy Classification, please explain choice of S1 - Storage occupancy. Based on description of "research and development area", building occupancy is likely F1 and should be classified accordingly. See Section 302, 306 and 311 for distinctions between F1 and S1 occupancies. 5. Under Height and Area Section show the following based on Occupancy Types, IIB Construction Type.and fully sprinkled throughout and any allowable frontage increases. Section 504, 506, 508. • Actual building height vs. allowable building height • Actual number of stories vs. allowable number of stories • Actual building floor area vs. allowable building floor area 6. Solve height, stories and areas for most restrictive occupancy type. Sections 504, 504.2, 506.2.2, 508.1 and Equation 5-1. 7. Determine main occupancy and accessory occupancy of building. Section 508.2. Determine allowable building height for main occupancy of building Section 508.2.2. Determine allowable building area for the main occupancy of the building. Show that the aggregate floor area of the accessory occupancy does not occupy more than 10 percent of the floor area. 8. Under Means of Egress section, show how occupant load has bee determined. Two calculations required, one for the B occupancy portion of the building and a second for the S occupancy portion of the building. Section 1004.1, Table 1004.1. 9. Under Plumbing Fixtures Section add required service sink and drinking fountain for B and S occupancies. Section 2901, 2902, Table 2902.1. A single service sink and drinking fountain is acceptable to serve both occupancies. It is understood these fixtures are shown in plumbing plans but they also need to be called out here. 10. Life Safety Plan and Floor Plan show presence of vehicle entry doors on both ends of the building. Is this a motor vehicle related occupancy under Section 406? Will this space require mechanical ventilation per the FBC - Mechanical. Please advise. Plan Sheet A-100 1. Provide reference to geotechnical investigation report number for which this foundation design is based. Section 1803.2, 1803.6 2. Provide design soil bearing pressure from geotechnical investigation report. Section 1603.1.6 1803.6. 3. Provide compacted fill materials specifications consistent with geotechnical investigation recommendations. Section 1803.5.8. 4. Provide copy of geotechnical investigation report signed and sealed by a Florida licensed professional engineer. F.S. 471. 5. Provide note indicating soils compaction testing results signed and sealed by Florida licensed professional engineer and confirming required soils compaction has been achieved throughout the building foundation area consistent with requirements of the geotechnical investigation. Note shall also indicate compaction testing results and engineer certification shall be provided on site at time of first foundation inspection and available to inspector. 1803.5.8. Plan Sheet A-101 1. Show dimension and slope of exterior landings on exterior sides of door. Show dimension extending beyond latch side of doors. FBC-Accessibility Section 404.2, Table 404.2.4.1 FBC-Building Section 1010.1.6 2. Show dimensioned width of hallway. I need to determine whether hall is wide enough for forward approach to doors of if parallel approach to latch and hinge side of doors. Sections 403.5, 404.2, Table 404.2.4.1. 3. Out swinging bathroom doors reduce the required minimum egress width in hall by more than 7 inches and need to be changed to be in-swinging doors. Section 1005.7.1. Change of doors to in-swinging may affect accessible maneuverability for accessible bathrooms. Plan Sheet A-102 1. Provide framing plans for rooftop crickets. Plan Sheet A-200 1. Provide complete exterior wall sections from interior finishes through to exterior cladding materials. Include all required details to produce complete wall sections for each exterior wall type from foundation through to roof parapets. Include parapet wall construction details parapet copings, flashings and counter flashings, exterior wall framing construction, materials and fastening details, roof connection and flashing details, backing materials and fastening details for exterior cladding, flashing details at door and windows and dissimilar materials. Sections 107.2.4, 107.3.5, 1403,1, 1403.2, 1403.3, 1404.1, 1404.2, 1404.5, 1404.11, 1405.3, 1405.4, 1405.6, 1405.10, 1408. 2. Provide specifications for EIFS system and International Code Council (ICC) Evaluation Report for EIFS to be used. Provide complete assembly details including required water resistive barrier type, weep screed, drainage plane, backing materials, finish distance above concrete and vegetated ground areas. Sections 107.2.4, 107.3.5, 1403,1, 1403.2, 1403.3, 1404.1, 1404.2, 1404.5, 1404.11, 1405.3, 1405.4, 1405.6, 1405.10, 1408. 3. Provide specifications for Ledgestone Veneer Base including framing, fastening and backing details. Sections 107.2.4, 107.3.5, 1403,1, 1403.2, 1403.3, 1404.1, 1404.2, 1404.5, 1404.11, 1405.3, 1405.4, 1405.6, 1405.10, 1408. 4. Provide construction, attachment and fastening details for exterior awnings, including vinyl and prefabricated metal entrance canopy. Identify prefabricated metal entrance canopy as a deferred submittal and note the design will be provided to building department at a later date and prior to installation and inspection. Sections 1603, 1`604, 1605, 1606, 1607., Plan Sheet A-600 (all comments per the 2020 Florida Building Code-Accessibility) 1. Provide clearances, maneuverability space, mounting height, spout height and reach ranges based on approach at high / low drinking fountain. Sections 308, 602 2. Provide clearances, turning radius, clear spaces in front of all plumbing fixtures. Clearances do not appear to be shown in front of lavatories. Section 305, 306, 307. Provide elevation views for knee and toe space, grab bar mounting heights, mirrors, paper dispensers, etc. for complete accessible details for bathrooms. Sections 308, 309, 603, 604, 605 and 606. 3. Provide location, mounting height and sign details for accessible bathroom signs. Section 703. 4. Provide accessible door thresholds, door handle details and door kick-plate details. Section 404. 5. Provide reach range, toe and knee space clearances at breakroom sink (sink must be accessible). Section 606. 6. Ambulatory accessible toilet compartment in women’s bathroom does not appear to comply with width requirements and does not include grab bars. Sections 604.8.2.1604.8.2.2 404, 604.8.2.3
DSD COMPLETE 05/16/2023 05/16/2023
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
ELEC HOLD 05/16/2023 05/30/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Requirements need to be 100% met in comcheck 2. Need emergency lighting where al electrical equipment is loacated. NEC 2017 110.26 (D)
FI1 HOLD 05/16/2023 05/31/2023
Note: Held By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM 1. Please provide detail for Fire Fighter Safety Building Marking System per FFPC 1 Annex E and AHJ And place the following note on the cover sheet: Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper design and notification for the Fire Fighters Safety Building Marking System prior to placement. 2. Please show location of fire sprinkler riser room for review.
GAS CANCEL 05/16/2023 05/18/2023
MECH HOLD 05/16/2023 05/26/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Requirements need to be 100% met in comcheck 2. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 2020 7Th edition 3. Referce FBC Mechanical 2020 7th edition 4. Remove reference to Osceola county on code analysis 5. Separate ventilation calculation and use occupant density from Table 403.3.1.1 FBC Mechanical 2020 7Th edition 6. Remove note #5 on reference notes Plan sheet M1 and M2. Provide size required for space. 7. Remove/Revise note #3 on refernce notes Plan sheet M2 and note #1 on Plan sheet M1. Exemption is for duct less than 100 square inches not feet. Also reference correct code year and addition. 8. Clarify research and development. What is being made/built?. May be further review based on response.
PLUM HOLD 05/16/2023 05/31/2023
Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Plumbing 1. Provide complete roof storm drainage plans. Roof appears to be enclosed by parapets on all four sides. Provide roof design based on rainfall rates and maximum possible depth of water on roof. Materials specifications per Section1102, roof drains per Section1105, conductors and leaders including sizing of drain piping, parapet wall scuppers, size of roof gutters per Section1106 and secondary roof drains per Section 1108.
UD1 COMPLETE 05/16/2023 05/17/2023
Note: Released By: BRICE WRIGHT - (386)986-2398 - BWRIGHT@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION - COMMERCIAL ¤60.00 05/24/2024
REINSPECTION - COMMERCIAL ¤60.00 05/24/2024
CONTRACTOR CHANGE ¤20.00 05/24/2024
FC IMPACT FEE EMS ¤443.96 01/08/2024
IMPACT FEE FIRE ¤8,159.32 01/08/2024
FC IMPACT FEE LAW ENFORCEMENT ¤1,703.86 01/08/2024
IMPACT FEE TRANSPORTATION ¤48,056.00 01/08/2024
SURCHARGE FS 533.721 ¤34.98 01/08/2024
SURCHARGE - FS 468.631 ¤52.46 01/08/2024
SITE PLAN 30 ¤30.00 01/08/2024
ADJUSTMENT 50% (¤3,497.50) 01/08/2024
ADMINISTRATIVE - COMMERCIAL ¤75.00 01/08/2024
INSPECTION COMMERCIAL ¤5,600.00 01/08/2024
INSPECTION - FIRE COMMERCIAL ¤200.00 01/08/2024
PLAN REVIEW - COMMERCIAL ¤1,120.00 01/08/2024
Fees Total Due: ¤0.00 Total Paid: ¤62,118.08