I want to search for...
Permit #2023050952
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00550-0020 |
| CONDITIONED SPACE: 2303 sqft |
| GARAGE: 726 sqft |
| OPENED PORCH (WITH ROOF) : 404 sqft |
| Total Square Footage: 3433 sqft |
| Block: 00550 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 386-237-8427 |
| Location Address: 3 ZAHAROFF PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/09/2023 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address UNIT 1 PALM COAST, FL 32137 |
|
Address 4881 PALM COAST PKWY NW PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤339,901.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/11/2024 | FINAL APPROVED | RSIMS |
| Note: 4/11/24: Met PM on site. Waiting for door repair at @ 09:00. Will return is possible. 4/10/2024 - PREVIOUS INSPECTION NOTES 4/10/24: 1). SGD is not operating properly. Extremely difficult to open. 2). Exterior temporary cover on Lanai needs to be replaced with a weather rated cover as required. NEC - 406.6 / 406.9(2E) 4/8/2024 - PREVIOUS INSPECTION NOTES 4/8/24: Inspection Stopped! Not Ready! Walked with PM to identify initial items. Examples Only: Bathroom exhausts obstructed with debris on right side & back left, front left is crushed & not connected to vent properly. / Exterior sleeve for lineset is not fastened properly & soffit is opened very wide at the top / Copper condensate drain from condensate pump in garage is turned up outside & does not terminate properly. / Range anti-tip bracket is missing an anchor as required. 4/4/2024 - PREVIOUS INSPECTION NOTES 4/4/24: House is locked. | |||
| BLD - BUILDING FINAL | 04/10/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/10/24: 1). SGD is not operating properly. Extremely difficult to open. 2). Exterior temporary cover on Lanai needs to be replaced with a weather rated cover as required. NEC - 406.6 / 406.9(2E) 4/8/2024 - PREVIOUS INSPECTION NOTES 4/8/24: Inspection Stopped! Not Ready! Walked with PM to identify initial items. Examples Only: Bathroom exhausts obstructed with debris on right side & back left, front left is crushed & not connected to vent properly. / Exterior sleeve for lineset is not fastened properly & soffit is opened very wide at the top / Copper condensate drain from condensate pump in garage is turned up outside & does not terminate properly. / Range anti-tip bracket is missing an anchor as required. 4/4/2024 - PREVIOUS INSPECTION NOTES 4/4/24: House is locked. | |||
| BLD - BUILDING FINAL | 04/08/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/8/24: Inspection Stopped! Not Ready! Walked with PM to identify initial items. Examples Only: Bathroom exhausts obstructed with debris on right side & back left, front left is crushed & not connected to vent properly. / Exterior sleeve for lineset is not fastened properly & soffit is opened very wide at the top / Copper condensate drain from condensate pump in garage is turned up outside & does not terminate properly. / Range anti-tip bracket is missing an anchor as required. 4/4/2024 - PREVIOUS INSPECTION NOTES 4/4/24: House is locked. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/05/2024 | FINAL APPROVED | JHARDING |
| Note: 4/1/2024 - PREVIOUS INSPECTION NOTES No power to pep pump. checck breaker in garage. | |||
| BLD - BUILDING FINAL | 04/04/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/4/24: House is locked. | |||
| U-CROSS CONNECTION | 04/01/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/01/2024 | Disapproved - NO FEE | JHARDING |
| Note: No power to pep pump. checck breaker in garage. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/28/2024 | APPROVED | TPOLACEK |
| Note: 03/28/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 2/12/24 PIPE IS FLAT (OK). YOU NEED TO PUT THE FORMBOARD IN THE CENTER OF THE DRIVEWAY APRON BACK TO WHERE IT WAS IT CAME LOOSE. APPROVING THIS PREPOUR AS NOTED DUE TO MINOR CORRECTION NEEDED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/28/2024 | APPROVED | TPOLACEK |
| Note: 03/28/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 03/28/2024 | APPROVED | TPOLACEK |
| Note: 03/28/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/28/2024 | APPROVED | TPOLACEK |
| Note: 03/28/24 CONCRETE IS GOOD CUTS ARE MADE CULVERT CLEAR HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| PLUMBING OTHER | 02/16/2024 | APPROVED | BTAYLOR |
| ELECTRIC - EARLY POWER | 02/16/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2170 10-18-23 1. Emailed FPL at 11:30. 2-16-24 1. Emailed FPL at 11:26. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/12/24 PIPE IS FLAT (OK). YOU NEED TO PUT THE FORMBOARD IN THE CENTER OF THE DRIVEWAY APRON BACK TO WHERE IT WAS IT CAME LOOSE. APPROVING THIS PREPOUR AS NOTED DUE TO MINOR CORRECTION NEEDED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U - SEWER TIE IN | 01/08/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 12/19/2023 | APPROVED | BVITALE |
| LATH/BRICK/ WATER BARRIER | 12/11/2023 | APPROVED | RSIMS |
| INSULATION | 12/07/2023 | APPROVED | BTAYLOR |
| Note: 12/5/2023 - PREVIOUS INSPECTION NOTES 12/5/23: 1). Firestop above breaker panel is incomplete at white romex wires. 2). Missing fire blocking & firestop to the left of kitchen exhaust duct. 3). Missing firestop between top plates of pack out walls at bathtub. 4). Missing cardboard baffles at ceiling level change along the left side. (where ceiling drops down from tray ceiling and is still above bedroom ceilings. | |||
| INSULATION | 12/05/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 12/5/23: 1). Firestop above breaker panel is incomplete at white romex wires. 2). Missing fire blocking & firestop to the left of kitchen exhaust duct. 3). Missing firestop between top plates of pack out walls at bathtub. 4). Missing cardboard baffles at ceiling level change along the left side. (where ceiling drops down from tray ceiling and is still above bedroom ceilings. | |||
| ROOF VALLEY & METAL | 12/01/2023 | APPROVED | BTAYLOR |
| Note: 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23: Partial approval pending revision being submitted and approved for step flashing detail along with visual inspection once shingles are installed. 2nd part of inspection MUST be completed before any veneer is installed. 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23: Previously listed deficiency not resolved. 11/27/23: Previously listed deficiency not resolved. Contractor stated that they will be doing step flashing as opposed to 5" x 5" continuous flashing. A revision showing this detail will need to be submitted to show details for step flashing as required. 11/22/2023 - PREVIOUS INSPECTION NOTES 11/22/23: Inspection stopped! Not Complete. * Missing all 5" x 5" flashing. 11/3/2023 - PREVIOUS INSPECTION NOTES Roof sheating at truss F5, right side garage not nailed. First sheet at the eave. | |||
| ALL ROUGH | 11/30/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/29/2023 | APPROVED | KSANDOE |
| Note: 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23 1. Truss plates or moisture barrier not installed where trusses land on CMU walls at multiple trusses throughout the building. 2. 2 over framing Ridge beams are to be support to create a continous load path. 3. Trusses B1, E5, CJ10, and EH5 are missing hold down anchors. 4. Trusses C1,2,3, and 4 at the front entry anchors require minimum of 9 fasteners. 5. The kneewall and the eave over framing at the front entry missing support blocking between trusses below and anchors / hold down straps. 6. Garage bearing wall 4x4 post and ABU44 anchor not installed. 7. Rear bearing wall between bed 3 and 4 not construted. 4x4 post, header, anchor bolts etc. 8. Rear porch 2x12 beam at the left side is supported on P.t. 2X6 Please porvide detail for this area. number of 2x required , anchoring to CMU and truss above. 9. NSPR blocking used for roof decking is to be SYP. remove at ares where roof decking edges are supported. Other areas can remain. Truss Engineering passed. Down cells passed. 11/1/2023 - PREVIOUS INSPECTION NOTES not ready for inspection, Missing 4x4 Post at detail-E Missing header at detail-D Missing MTS 18s Missing HTS 20s (all per plans and details) Inspection Stopped, nothing further looked at | |||
| ROOF VALLEY & METAL | 11/27/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/27/23: Previously listed deficiency not resolved. Contractor stated that they will be doing step flashing as opposed to 5" x 5" continuous flashing. A revision showing this detail will need to be submitted to show details for step flashing as required. 11/22/2023 - PREVIOUS INSPECTION NOTES 11/22/23: Inspection stopped! Not Complete. * Missing all 5" x 5" flashing. 11/3/2023 - PREVIOUS INSPECTION NOTES Roof sheating at truss F5, right side garage not nailed. First sheet at the eave. | |||
| ROOF VALLEY & METAL | 11/27/2023 | PARTIALLY APPROVED | RSIMS |
| Note: 11/27/23: Partial approval pending revision being submitted and approved for step flashing detail along with visual inspection once shingles are installed. 2nd part of inspection MUST be completed before any veneer is installed. 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23: Previously listed deficiency not resolved. 11/27/23: Previously listed deficiency not resolved. Contractor stated that they will be doing step flashing as opposed to 5" x 5" continuous flashing. A revision showing this detail will need to be submitted to show details for step flashing as required. 11/22/2023 - PREVIOUS INSPECTION NOTES 11/22/23: Inspection stopped! Not Complete. * Missing all 5" x 5" flashing. 11/3/2023 - PREVIOUS INSPECTION NOTES Roof sheating at truss F5, right side garage not nailed. First sheet at the eave. | |||
| ROOF VALLEY & METAL | 11/22/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/22/23: Inspection stopped! Not Complete. * Missing all 5" x 5" flashing. 11/3/2023 - PREVIOUS INSPECTION NOTES Roof sheating at truss F5, right side garage not nailed. First sheet at the eave. | |||
| ROOF VALLEY & METAL | 11/03/2023 | Disapproved - NO FEE | JWALKER |
| Note: Roof sheating at truss F5, right side garage not nailed. First sheet at the eave. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/03/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 11/3/23 1. Truss plates or moisture barrier not installed where trusses land on CMU walls at multiple trusses throughout the building. 2. 2 over framing Ridge beams are to be support to create a continous load path. 3. Trusses B1, E5, CJ10, and EH5 are missing hold down anchors. 4. Trusses C1,2,3, and 4 at the front entry anchors require minimum of 9 fasteners. 5. The kneewall and the eave over framing at the front entry missing support blocking between trusses below and anchors / hold down straps. 6. Garage bearing wall 4x4 post and ABU44 anchor not installed. 7. Rear bearing wall between bed 3 and 4 not construted. 4x4 post, header, anchor bolts etc. 8. Rear porch 2x12 beam at the left side is supported on P.t. 2X6 Please porvide detail for this area. number of 2x required , anchoring to CMU and truss above. 9. NSPR blocking used for roof decking is to be SYP. remove at ares where roof decking edges are supported. Other areas can remain. Truss Engineering passed. Down cells passed. 11/1/2023 - PREVIOUS INSPECTION NOTES not ready for inspection, Missing 4x4 Post at detail-E Missing header at detail-D Missing MTS 18s Missing HTS 20s (all per plans and details) Inspection Stopped, nothing further looked at | |||
| WALL SHEATHING | 11/01/2023 | APPROVED | LMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/01/2023 | Disapproved - NO FEE | LMILLER |
| Note: not ready for inspection, Missing 4x4 Post at detail-E Missing header at detail-D Missing MTS 18s Missing HTS 20s (all per plans and details) Inspection Stopped, nothing further looked at | |||
| ROOF SHEATHING | 10/20/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2340 10/4/23: Please provide dumpster on site & clean up piles of trash/debris before next inspection. | |||
| ELECTRIC TEMP POLE | 10/18/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10-18-23 1. Emailed FPL at 11:30. | |||
| TIE BEAM / LINTEL | 10/04/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 10/4/23: Please provide dumpster on site & clean up piles of trash/debris before next inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/18/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 09/01/2023 | APPROVED | RSIMS |
| Note: 9/1/23: At time of inspection site was plan/code compliant. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/23/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 08/23/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/04/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/29/2023 | 12/01/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/21/2023 | 11/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/14/2023 | 11/20/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Layout Needs to be digitally signed, sealed and verfiable per F.S.471.025 | |||
| ENGIN1 | COMPLETE | 09/18/2023 | 09/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/09/2023 | 06/09/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 05/23/2023 | 05/24/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/23/2023 | 05/30/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a shop drawing approval stamp. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5 | |||
| ENGIN1 | COMPLETE | 05/23/2023 | 05/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/23/2023 | 05/25/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/23/2023 | 05/31/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM SITE PLAN IS FOR A POOL PERMIT IS FOR BUILDING RESIDENTIAL | |||
| SWALE | COMPLETE | 05/18/2023 | 07/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/17/2023 | 05/20/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a shop drawing approval stamp. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 05/17/2023 | 05/19/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/17/2023 | 05/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/17/2023 | 05/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/17/2023 | 05/18/2023 |
| LOCATE | COMPLETE | 05/17/2023 | 05/19/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/17/2023 | 05/19/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/17/2023 | 05/23/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/17/2023 | 05/18/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Plans are for garage right, landscape and site are for garage left. please correct whichever is wrong. Must have a minimum total of 16 - 3 gallon foundation plantings with a minimum of eight in the front and four along each side wrapping corners | |||
| BADMIN | COMPLETE | 05/17/2023 | 05/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| CONNECTION FEES | ¤1,166.26 | 06/09/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/09/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/09/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/09/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/09/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/09/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/09/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/09/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/09/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/09/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/09/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/09/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/09/2023 |
| SURCHARGE FS 533.721 | ¤6.15 | 06/09/2023 |
| SURCHARGE - FS 468.631 | ¤9.23 | 06/09/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/09/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/09/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/09/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/09/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/09/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/09/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/09/2023 |
| SEWER CREDIT | (¤850.00) | 06/09/2023 |
| SEWER INSPECTION | ¤25.00 | 06/09/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/09/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/09/2023 |
| SITE PLAN 30 | ¤30.00 | 06/09/2023 |
| WATER- TURN ON | ¤25.00 | 06/09/2023 |
| ADJUSTMENT 50% | (¤615.10) | 06/09/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/09/2023 |
| INSPECTION - RESIDENTIAL | ¤935.00 | 06/09/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤265.20 | 06/09/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,902.61 |