Permit #2023051176
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7010-00170-0040 |
| Block: 00170 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-931-0184 |
| Location Address: 21 FLAXTON LN |
| Type: PO - POOL |
| Issue Date: 07/20/2023 |
| NOC: RECORDED |
| Applicant name: ROY CHARLES WALDHAUER II |
| Owner: DRGOS RICHARD & REGINA H&W |
|
Address 901 9TH STREET PASADENA, MD 21122 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤85,500.00 |
| Job Description: POOL/SCREEN ENCLOSURE |
| Type: CN |
Contractor
WALDHAUER & SON INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1600 N STATE STREET # 102 BUNNELL, FL 32110 |
CPC057029 (Exp: 08/31/2026) | 386-263-8272 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
ROY CHARLES WALDHAUER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1600 N STATE STREET # 102 , 0 |
CRC1327300 (Exp: 08/31/2026) | 386-263-8272 | 386-263-8289 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 07/31/2024 | FINAL APPROVED | JSTEWART |
| U -UTILITY RESIDENTIAL FINAL | 07/30/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 07/29/2024 | APPROVED | EMADISON |
| Note: ** 07/29/24 SPOKE WITH HOMEOWNER IN REGARD TO DRAINAGE WITH THE RECENT HEAVY RAINS THERE ARE NO ISSUES WITH STANDING WATER OR FLOODING BACK ONTO STRUCTURE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/29/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/29/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/12/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 06/12/24 FINAL SURVEY STILL SHOWS THAT WATER WILL FLOW BACK TO THE POOL DECK, BUILDER NEEDS TO HAVE POSITIVE FLOW AWAY FROM THE POOL DECK WITH POSITIVE FLOW FROM THE REAR TO THE FRONT OF TO THE FRONT OF PROPERTY _____________________________________________________________________________________________________________________ 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/6/2024 7:51:06 AM *** ** 05/06/24 FINAL SURVEY SHOWS THAT WATER WILL FLOW BACK TO THE POOL DECK, BUILDER NEEDS TO HAVE POSITIVE FLOW AWAY FROM THE POOL DECK WITH POSITIVE FLOW FROM THE REAR TO THE FRONT OF PROPERTY Inspector Notes from Inspection 9470 ** 08/01/23 SPOKE WITH BUILDER ON 07/31/23 IN REGARD TO PIPE USED IN SWALE TO ACESS HIS SITE. HE IS CURRENTLY USING A 6 INCH PIECE OF PIPE . I AUTHORIZED ITS USE HE WILL MONITOR SITE AND DO ANY CORRECTIONS IF PIPE GETS BLOCKED. ENTIRE STREET NEEDS GRADE WORK BOTH SIDES . ______________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER ON SITE WAITING ON A 12 INCH PIEC OF CULVERT TO PUT IN SWALE ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 08/01/23 _____________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 07/31/23 _______________________________________________________________________________________________________________________ 7/25/2023 - PREVIOUS INSPECTION NOTES rjg. Pool company has blocked the swale with a bridge. photo's attached. Next inspection 7/28/23. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/06/2024 | Disapproved - NO FEE | EMADISON |
| Note: *** NOTES ADDED BY EMADISON 5/6/2024 7:51:06 AM *** ** 05/06/24 FINAL SURVEY SHOWS THAT WATER WILL FLOW BACK TO THE POOL DECK, BUILDER NEEDS TO HAVE POSITIVE FLOW AWAY FROM THE POOL DECK WITH POSITIVE FLOW FROM THE REAR TO THE FRONT OF PROPERTY Inspector Notes from Inspection 9470 ** 08/01/23 SPOKE WITH BUILDER ON 07/31/23 IN REGARD TO PIPE USED IN SWALE TO ACESS HIS SITE. HE IS CURRENTLY USING A 6 INCH PIECE OF PIPE . I AUTHORIZED ITS USE HE WILL MONITOR SITE AND DO ANY CORRECTIONS IF PIPE GETS BLOCKED. ENTIRE STREET NEEDS GRADE WORK BOTH SIDES . ______________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER ON SITE WAITING ON A 12 INCH PIEC OF CULVERT TO PUT IN SWALE ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 08/01/23 _____________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 07/31/23 _______________________________________________________________________________________________________________________ 7/25/2023 - PREVIOUS INSPECTION NOTES rjg. Pool company has blocked the swale with a bridge. photo's attached. Next inspection 7/28/23. | |||
| ELECTRIC AND ALARM | 01/19/2024 | APPROVED | AGAETANO |
| POOL DECK | 09/21/2023 | APPROVED | AGAETANO |
| POOL DECK | 09/14/2023 | CANCELLED BY APPLICANT | WEB |
| POOL DECK | 09/13/2023 | CANCELLED BY APPLICANT | WEB |
| STEEL AND GROUND | 08/01/2023 | APPROVED | AGAETANO |
| Note: 7/31/2023 - PREVIOUS INSPECTION NOTES 07-31-2023 Soil has washed into the foundation area. | |||
| ROW - DRAINAGE | 08/01/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/01/23 SPOKE WITH BUILDER ON 07/31/23 IN REGARD TO PIPE USED IN SWALE TO ACESS HIS SITE. HE IS CURRENTLY USING A 6 INCH PIECE OF PIPE . I AUTHORIZED ITS USE HE WILL MONITOR SITE AND DO ANY CORRECTIONS IF PIPE GETS BLOCKED. ENTIRE STREET NEEDS GRADE WORK BOTH SIDES . ______________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BUILDER ON SITE WAITING ON A 12 INCH PIEC OF CULVERT TO PUT IN SWALE ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 08/01/23 _____________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 07/31/23 _______________________________________________________________________________________________________________________ 7/25/2023 - PREVIOUS INSPECTION NOTES rjg. Pool company has blocked the swale with a bridge. photo's attached. Next inspection 7/28/23. | |||
| ROW - DRAINAGE | 07/31/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/31/23 BUILDER ON SITE WAITING ON A 12 INCH PIEC OF CULVERT TO PUT IN SWALE ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 08/01/23 _____________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 07/31/23 _______________________________________________________________________________________________________________________ 7/25/2023 - PREVIOUS INSPECTION NOTES rjg. Pool company has blocked the swale with a bridge. photo's attached. Next inspection 7/28/23. | |||
| STEEL AND GROUND | 07/31/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 07-31-2023 Soil has washed into the foundation area. | |||
| ROW - DRAINAGE | 07/28/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** BUILDER NEEDS TO OPEN SWALE OR INSTALL A TEMPORARY PIPE AS YOU ARE BLOCKING THE FLOW OF WATER ** FOLLOW UP INSPECTION 07/31/23 _______________________________________________________________________________________________________________________ 7/25/2023 - PREVIOUS INSPECTION NOTES rjg. Pool company has blocked the swale with a bridge. photo's attached. Next inspection 7/28/23. | |||
| ROW - DRAINAGE | 07/25/2023 | Disapproved - NO FEE | RGROSS |
| Note: rjg. Pool company has blocked the swale with a bridge. photo's attached. Next inspection 7/28/23. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/22/2023 | 05/23/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/22/2023 | 05/23/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/22/2023 | 05/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/22/2023 | 05/30/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/22/2023 | 05/23/2023 |
| Note: Released By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 07/29/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/29/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/29/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/29/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/29/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 07/20/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/20/2023 |
| SITE PLAN 30 | ¤30.00 | 07/20/2023 |
| INSPECTION- POOL | ¤160.00 | 07/20/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤67.08 | 07/20/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/20/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/20/2023 |
| ADJUSTMENT 50% | (¤128.54) | 07/20/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/20/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤342.54 |