Permit #2023051194

Permit Details

Status: COED

Parcel Id: 07-11-31-7060-00080-0010
CONDITIONED SPACE: 1298 sqft
CONDITIONED SPACE: 1298 sqft
GARAGE: 262 sqft
GARAGE: 262 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
OPENED PORCH (WITH ROOF) : 27 sqft
OPENED PORCH (WITH ROOF) : 27 sqft
Total Square Footage: 3274 sqft
Block: 00080
Subdivision: 2200 - SECTION 60-SEMINOLE PARK
Job Phone: 863-647-5815
Location Address: 44 SLUMBER PATH
Type: DU - DUPLEX
Issue Date: 06/08/2023
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: KENNEDY TERRY & JOY H&W

Address

71 DEL PALMA DRIVE

PALM COAST, FL 32137

Lot: 0010
Contracted Stated Job Value: ¤300,000.00
Job Description: DUPLEX - OPPORTUNITY MODEL
Type: CN
Original Permit #: 2023031577

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 03/13/2024 Disapproved - NO FEE PFLANAGAN
Note: YOU NEED TO PASS THE FINAL SURVEY AND THE FIELD SURVEY BEFORE THIS INSPECTION. ------------------------------------------------------------------------------------ 3/11/2024 11:14:40 AM- PREVIOUS INSPECTION NOTES
ROW - FINAL APRON (AFTER POUR) 03/13/2024 APPROVED GBERTOLA
Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 3/13/2024 - PREVIOUS INSPECTION NOTES YOU NEED TO PASS THE FINAL SURVEY AND THE FIELD SURVEY BEFORE THIS INSPECTION. ------------------------------------------------------------------------------------ 3/11/2024 11:14:40 AM- PREVIOUS INSPECTION NOTES
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/13/2024 APPROVED GBERTOLA
Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 3/12/2024 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY STATES THAT YOU DO NOT HAVE POSITIVE FALL TO THE ROADSIDE SWALE. 2) THE FINAL SURVEY STATES THAT ALL THE WATER IN THE BACK IS FLOWING TO THE BACK ROAD SITE PLAN STATES YOU HAVE A SWALE BEFORE THE PROPERTY LINE AND WATER RUNS TO THE LEFT SIDE ROADSIDE SWALE. 3) NEED TO HAVE ELEVATIONS ALONG THE BACK RIGHT PROPERTY LINE NEED TO BE EVERY 20' ON THE ROPERTY LINE. ------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 WE NEED ELEVATION SHOTS ON THE REAR PROPERTY LINE TO THE RIGHT CORNER. ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING 26.2 TO 26.3 TO 26.5 UPHILL TO FLAT 26.5 FOR 60' 26.6 AT THE FRONT RIGHT CORNER UPHILL AT THE FRONT. YOU MUST HAVE POSITIVE REAR TO FRONT DRAINAGE FLOW OF MINIMUM .10 EVERY 20' ALONG THE PROPERTY LINE. Lot must drain. Section 300.01 (A)(1)(C)(6) Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet. Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/13/2024 APPROVED GBERTOLA
Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 2/29/24=MEETING WITH THE BUILDER AND THEY NEED TO MAKE A SWALE ON THE RIGHT SIDE FACING THE HOUSE MOVING THE WATER TO THE FRONT SWALE.PER GBERTOLA. 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/24 YOU MUST SUBMIT AND PASS A FINAL SURVEY INSPECTION BEFORE A FIELD SURVEY INSPECTION CAN BE COMPLETED. PLEASE SUBMIT YOUR FINAL SURVEY FOR AN INSPECTION REVIEW. NO FEE.
ROW - STORMWATER FINAL 03/13/2024 APPROVED GBERTOLA
Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/12/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) THE FINAL SURVEY STATES THAT YOU DO NOT HAVE POSITIVE FALL TO THE ROADSIDE SWALE. 2) THE FINAL SURVEY STATES THAT ALL THE WATER IN THE BACK IS FLOWING TO THE BACK ROAD SITE PLAN STATES YOU HAVE A SWALE BEFORE THE PROPERTY LINE AND WATER RUNS TO THE LEFT SIDE ROADSIDE SWALE. 3) NEED TO HAVE ELEVATIONS ALONG THE BACK RIGHT PROPERTY LINE NEED TO BE EVERY 20' ON THE ROPERTY LINE. ------------------------------------------------------------------- 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24 WE NEED ELEVATION SHOTS ON THE REAR PROPERTY LINE TO THE RIGHT CORNER. ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING 26.2 TO 26.3 TO 26.5 UPHILL TO FLAT 26.5 FOR 60' 26.6 AT THE FRONT RIGHT CORNER UPHILL AT THE FRONT. YOU MUST HAVE POSITIVE REAR TO FRONT DRAINAGE FLOW OF MINIMUM .10 EVERY 20' ALONG THE PROPERTY LINE. Lot must drain. Section 300.01 (A)(1)(C)(6) Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet. Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.
ROW - FINAL APRON (AFTER POUR) 03/12/2024 CANCELLED BY APPLICANT BBEMBRY
BLD - BUILDING FINAL 03/12/2024 FINAL APPROVED BTAYLOR
Note: 3/7/2024 - PREVIOUS INSPECTION NOTES 3-7-24 1. Unit A no power in living room. 2. Energy cals do not match either unit. 3. Hole in attic in foam needs to be replaced and fire proofed.
BLD - BUILDING FINAL 03/07/2024 Disapproved - NO FEE BTAYLOR
Note: 3-7-24 1. Unit A no power in living room. 2. Energy cals do not match either unit. 3. Hole in attic in foam needs to be replaced and fire proofed.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/23/2024 Disapproved - NO FEE FSLADISH
Note: 2/23/24 WE NEED ELEVATION SHOTS ON THE REAR PROPERTY LINE TO THE RIGHT CORNER. ON THE RIGHT SIDE PROPERTY LINE YOU ARE SHOWING 26.2 TO 26.3 TO 26.5 UPHILL TO FLAT 26.5 FOR 60' 26.6 AT THE FRONT RIGHT CORNER UPHILL AT THE FRONT. YOU MUST HAVE POSITIVE REAR TO FRONT DRAINAGE FLOW OF MINIMUM .10 EVERY 20' ALONG THE PROPERTY LINE. Lot must drain. Section 300.01 (A)(1)(C)(6) Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet. Elevations every 20 ft. on the property line Sec 300.01D1 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/14/2024 Disapproved - NO FEE FSLADISH
Note: 2/14/24 YOU MUST SUBMIT AND PASS A FINAL SURVEY INSPECTION BEFORE A FIELD SURVEY INSPECTION CAN BE COMPLETED. PLEASE SUBMIT YOUR FINAL SURVEY FOR AN INSPECTION REVIEW. NO FEE.
U-CROSS CONNECTION 02/14/2024 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U - SEWER TIE IN 01/23/2024 APPROVED MGIBSON
GRAVITY SEWER TEST 01/23/2024 APPROVED MGIBSON
Note: 8/14/2023 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET TO PEP TANK
ELECTRIC - EARLY POWER 01/18/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2170 6-30-23 1. Emailed FPL at 8:32. 1-18-24 1. Emailed FPL at 11:57.
ROW- PRE-APRON (PRE-POUR) 12/22/2023 Disapproved - NO FEE RGROSS
Note: There are 7 discs in the road in the vacinity of the BM indicated on the site and swale plans. Please clearly identify the correct one.
ROW- PRE-APRON (PRE-POUR) 12/22/2023 APPROVED RGROSS
Note: Doubled back as a courtesy because of the holiday and reinspected the same day. NID identified as the RED one. 12/22/2023 - PREVIOUS INSPECTION NOTES There are 7 discs in the road in the vacinity of the BM indicated on the site and swale plans. Please clearly identify the correct one.
PEP TANK INSTALLATION REQUEST 11/30/2023 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 11/07/2023 APPROVED BTAYLOR
FIREWALL DRYWALL NAILING 10/02/2023 APPROVED BTAYLOR
INSULATION 09/22/2023 APPROVED BTAYLOR
Note: 9/15/2023 - PREVIOUS INSPECTION NOTES 9-15-23 1. Missing SCREWS in header.Engineer stated that SCREWS were to be used not NAILS. Do not call this back in till SCREWS have been installed.....
INSULATION 09/15/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 9-15-23 1. Missing SCREWS in header.Engineer stated that SCREWS were to be used not NAILS. Do not call this back in till SCREWS have been installed.....
ALL ROUGH 09/05/2023 APPROVED BTAYLOR
WALL SHEATHING 09/01/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 8/24/2023 - PREVIOUS INSPECTION NOTES 8/21/2023 - PREVIOUS INSPECTION NOTES 8/17/2023 - PREVIOUS INSPECTION NOTES 8-17-23 1. Truss to bearing wall not per detail. 2. No engineering packet. 3. Bearing wall not built per detail. 8-21-23 1. Truss to bearing wall not per detail. 2. Bearing wall not built per detail. 8-24-23 1.Bearing wall not built per detail. 8-31-23 1. Header in garage needs straps. 2. Rear door missing jack stud. 3. Over framing not strapped at ridge.
ROOF VALLEY & METAL 09/01/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 8/24/2023 - PREVIOUS INSPECTION NOTES 8/21/2023 - PREVIOUS INSPECTION NOTES 8/17/2023 - PREVIOUS INSPECTION NOTES 8-17-23 1. Truss to bearing wall not per detail. 2. No engineering packet. 3. Bearing wall not built per detail. 8-21-23 1. Truss to bearing wall not per detail. 2. Bearing wall not built per detail. 8-24-23 1.Bearing wall not built per detail. 8-31-23 1. Header in garage needs straps. 2. Rear door missing jack stud. 3. Over framing not strapped at ridge.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/31/2023 APPROVED - AS NOTED BTAYLOR
Note: 8/24/2023 - PREVIOUS INSPECTION NOTES 8/21/2023 - PREVIOUS INSPECTION NOTES 8/17/2023 - PREVIOUS INSPECTION NOTES 8-17-23 1. Truss to bearing wall not per detail. 2. No engineering packet. 3. Bearing wall not built per detail. 8-21-23 1. Truss to bearing wall not per detail. 2. Bearing wall not built per detail. 8-24-23 1.Bearing wall not built per detail. 8-31-23 1. Header in garage needs straps. 2. Rear door missing jack stud. 3. Over framing not strapped at ridge.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/24/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 8/21/2023 - PREVIOUS INSPECTION NOTES 8/17/2023 - PREVIOUS INSPECTION NOTES 8-17-23 1. Truss to bearing wall not per detail. 2. No engineering packet. 3. Bearing wall not built per detail. 8-21-23 1. Truss to bearing wall not per detail. 2. Bearing wall not built per detail. 8-24-23 1.Bearing wall not built per detail.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/21/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 8/17/2023 - PREVIOUS INSPECTION NOTES 8-17-23 1. Truss to bearing wall not per detail. 2. No engineering packet. 3. Bearing wall not built per detail. 8-21-23 1. Truss to bearing wall not per detail. 2. Bearing wall not built per detail.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/17/2023 Disapproved - NO FEE BTAYLOR
Note: 8-17-23 1. Truss to bearing wall not per detail. 2. No engineering packet. 3. Bearing wall not built per detail.
GRAVITY SEWER TEST 08/14/2023 Disapproved -FEE REQUIRED MGIBSON
Note: SEWER NOT RAN YET TO PEP TANK
FOUND SURVEY APPROVED (OFFICE) 08/14/2023 APPROVED TBAKER
TIE BEAM / LINTEL 07/05/2023 APPROVED BTAYLOR
Note: 6/30/2023 - PREVIOUS INSPECTION NOTES 6-30-23 1. Steel missing in headers.
ELECTRIC TEMP POLE 06/30/2023 APPROVED - AS NOTED BTAYLOR
Note: 6-30-23 1. Emailed FPL at 8:32.
TIE BEAM / LINTEL 06/30/2023 Disapproved - NO FEE BTAYLOR
Note: 6-30-23 1. Steel missing in headers.
MONOLITHIC SLAB 06/20/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 06/14/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 06/14/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH HOLD 03/11/2024 03/11/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Upload revised heatloads
MECH COMPLETE 03/11/2024 03/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/07/2024 03/11/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This is a masterfile. Upload heatload only for side A and B
BLD COMPLETE 01/26/2024 01/26/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 01/26/2024 01/26/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 01/26/2024 01/26/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/28/2023 09/29/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/28/2023 09/29/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 09/28/2023 09/29/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/14/2023 08/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/14/2023 08/14/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 06/02/2023 06/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 05/31/2023 06/01/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide heatload with side A and B listed on heatload. Provide correct heatloads not double of one side. 2. Provide duct layout for both sides with correct orientation
ZON COMPLETE 05/31/2023 05/31/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 05/23/2023 07/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 05/22/2023 05/25/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 05/22/2023 05/24/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 05/22/2023 05/23/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/22/2023 05/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/22/2023 05/23/2023
LOCATE COMPLETE 05/22/2023 05/25/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/22/2023 05/23/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide only heatload not energy calc. 2. Provide duct layout
SW1 COMPLETE 05/22/2023 05/30/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 05/22/2023 05/24/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM All windows and doors facing right of way must have banding. This house has a street on the left side and rear.
BADMIN INFORMATION 05/22/2023 05/22/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The NOC was rejected, the wrong county is referenced (Palm Beach) For future, since you dont have right, left, A, B, C, etc. you do not need to 'fill in' that information on the site specific sheet, you can write N/A for those That would be if you had options submitted for the master file, and then you would identify which option you are using.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 03/13/2024
PLAN REVIEW - REVISION ¤32.50 03/13/2024
REINSPECTION RESIDENTIAL ¤40.00 03/13/2024
REINSPECTION RESIDENTIAL ¤40.00 03/13/2024
REINSPECTION RESIDENTIAL ¤40.00 03/13/2024
REINSPECTION RESIDENTIAL ¤40.00 03/13/2024
CONNECTION FEES ¤2,332.52 06/08/2023
WATER- TURN ON ¤50.00 06/08/2023
ADJUSTMENT 50% (¤448.13) 06/08/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/08/2023
INSPECTION - RESIDENTIAL ¤866.25 06/08/2023
PLAN REVIEW - RESIDENTIAL ¤126.00 06/08/2023
FIRE IMPACT FEE ADMIN ¤25.23 06/08/2023
FIRE IMPACT FEE ADMIN (¤25.23) 06/08/2023
FC IMPACT FEE EMS ¤62.00 06/08/2023
IMPACT FEE FIRE ¤841.04 06/08/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/08/2023
FC IMPACT FEE LIBRARY ¤268.00 06/08/2023
IMPACT FEE PARKS ¤3,538.30 06/08/2023
IMPACT FEE SCHOOL ¤10,900.00 06/08/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 06/08/2023
WATER -IRRIGATION INSPECTION ¤50.00 06/08/2023
PARKS IMPACT FEE ADMIN ¤106.15 06/08/2023
PARKS IMPACT FEE ADMIN (¤106.15) 06/08/2023
SURCHARGE FS 533.721 ¤5.74 06/08/2023
SURCHARGE - FS 468.631 ¤8.61 06/08/2023
SW ENG - FOUNDATION SURVEY ¤20.00 06/08/2023
SW ENG INSPECTION 80 ¤80.00 06/08/2023
SW ENG PRE APRON ¤30.00 06/08/2023
SW ENG - REVIEW 20 ¤20.00 06/08/2023
SW ENG RES REVIEW 200 ¤200.00 06/08/2023
TRANS IMPACT FEE ADMIN ¤84.36 06/08/2023
TRANS IMPACT FEE ADMIN (¤84.36) 06/08/2023
SEWER CREDIT (¤2,932.00) 06/08/2023
SEWER INSPECTION ¤25.00 06/08/2023
SEWER CAPITAL FACILITY ¤10,689.64 06/08/2023
WATER CAPITAL FACILITY FEE ¤7,847.76 06/08/2023
SITE PLAN 30 ¤30.00 06/08/2023
Fees Total Due: ¤0.00 Total Paid: ¤37,883.23