Permit #2023051306
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00620-0150 |
| CONDITIONED SPACE: 1298 sqft |
| CONDITIONED SPACE: 1298 sqft |
| GARAGE: 262 sqft |
| GARAGE: 262 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| Total Square Footage: 3274 sqft |
| Block: 00620 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 863-647-5815 |
| Location Address: 24 WHETSTONE LN |
| Type: DU - DUPLEX |
| Issue Date: 08/17/2023 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: HULBERT HOMES INC |
|
Address PO BOX 6254 LAKELAND, FL 33807 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: DUPLEX - THE OPPORTUNITY MODEL |
| Type: CN |
| Original Permit #: 2023031577 |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
KYLE RODBOURN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1325 W HWY 100 BUNNELL, FL 32110 |
CAC1821358 (Exp: 08/31/2026) | 386-586-9039 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/25/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 07/24/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 7/24/24 1. A/C still does not appear to be blowing air unit B 7/19/2024 - PREVIOUS INSPECTION NOTES Outside 1. Seal soffit @ meter main FBC EC TABLE R402.4.1.1 2. Meter cans need to be properly identified and breakers labeled in metermain NEC 408.4 3. ODU must be a min of 3'' off grade FBCR M1305.1.4.1 A side 1. Kitchen outlets loose and not installed properly NEC 406.4 2. Water heater does not have disconnect within site NEC 422.31 3. Anti tip bracket not installed per manufacter spec B side 1. A/C not cooling 2. Water heater does not have disconnect within site NEC 422.31 3. Anti tip bracket not installed per manufacter spec 4. Washer outlet loose and not installed properly NEC 406.4 | |||
| BLD - BUILDING FINAL | 07/19/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: Outside 1. Seal soffit @ meter main FBC EC TABLE R402.4.1.1 2. Meter cans need to be properly identified and breakers labeled in metermain NEC 408.4 3. ODU must be a min of 3'' off grade FBCR M1305.1.4.1 A side 1. Kitchen outlets loose and not installed properly NEC 406.4 2. Water heater does not have disconnect within site NEC 422.31 3. Anti tip bracket not installed per manufacter spec B side 1. A/C not cooling 2. Water heater does not have disconnect within site NEC 422.31 3. Anti tip bracket not installed per manufacter spec 4. Washer outlet loose and not installed properly NEC 406.4 | |||
| U-CROSS CONNECTION | 07/18/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/18/2024 10:47:37 AM *** no irigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 07/12/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/12/2024 | APPROVED | TPOLACEK |
| Note: Inspector Notes from Inspection 9270 04/23/24 PLEASE MAKE SURE EXTRA REBAR IS PUSHED DOWN BEFORE POURING SO IT DOES NOT STICK OUT OF CONCRETE AFTER POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ------------------------------------------------------------------------------------------------------ 4/17/2024 - PREVIOUS INSPECTION NOTES READY TO POUR THE UPPER DRIVEWAY ONLY TO THE RIGHT OF WAY LINE IN THE FRONT. NEED TO CALL IN FOR THE APRON INSPECTION WHEN READY. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/12/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 07/12/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 04/23/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04/23/24 PLEASE MAKE SURE EXTRA REBAR IS PUSHED DOWN BEFORE POURING SO IT DOES NOT STICK OUT OF CONCRETE AFTER POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ------------------------------------------------------------------------------------------------------ 4/17/2024 - PREVIOUS INSPECTION NOTES READY TO POUR THE UPPER DRIVEWAY ONLY TO THE RIGHT OF WAY LINE IN THE FRONT. NEED TO CALL IN FOR THE APRON INSPECTION WHEN READY. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/17/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR THE UPPER DRIVEWAY ONLY TO THE RIGHT OF WAY LINE IN THE FRONT. NEED TO CALL IN FOR THE APRON INSPECTION WHEN READY. | |||
| ELECTRIC - EARLY POWER | 04/15/2024 | APPROVED | RMARTIN |
| Note: 4/10/2024 - PREVIOUS INSPECTION NOTES doors need to be unlocked for inspection, right side doors locked Emailed FPL @ 10:30am | |||
| ELECTRIC - EARLY POWER | 04/10/2024 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: doors need to be unlocked for inspection, right side doors locked Emailed FPL @ 10:30am | |||
| GRAVITY SEWER TEST | 03/05/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 03/05/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/22/2024 | APPROVED | CBOWERMASTER |
| Note: 1/31/2024 2:17:29 PM- PREVIOUS INSPECTION NOTES STUCCO | |||
| INSULATION | 02/12/2024 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 02/02/2024 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 1/30/23 low voltage panel missing outlet Check on next inspection 1/22/2024 - PREVIOUS INSPECTION NOTES A side 1. Electrical panel not framed out 2. SGD and front door not installed 3. All slab penitrations are required to be sealed 4. Windows missing anchors (check all) 5. Shower and tub not filled with water Stopped inspection, not ready, did not complete, A side or go into B | |||
| PEP TANK INSTALLATION REQUEST | 01/31/2024 | Disapproved -FEE REQUIRED | BVITALE |
| Note: STUCCO | |||
| ALL ROUGH | 01/30/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1/30/23 low voltage panel missing outlet Check on next inspection 1/22/2024 - PREVIOUS INSPECTION NOTES A side 1. Electrical panel not framed out 2. SGD and front door not installed 3. All slab penitrations are required to be sealed 4. Windows missing anchors (check all) 5. Shower and tub not filled with water Stopped inspection, not ready, did not complete, A side or go into B | |||
| ALL ROUGH | 01/22/2024 | Disapproved - NO FEE | MKRASKI |
| Note: A side 1. Electrical panel not framed out 2. SGD and front door not installed 3. All slab penitrations are required to be sealed 4. Windows missing anchors (check all) 5. Shower and tub not filled with water Stopped inspection, not ready, did not complete, A side or go into B | |||
| FIREWALL DRYWALL NAILING | 01/10/2024 | APPROVED - AS NOTED | FWILLIS |
| Note: 1/10/24 - DO NOT SPACKLE OVER SCREWS BEFORE INSPECTION........ 12/21/2023 - PREVIOUS INSPECTION NOTES Tie down inspection needs to be passed before firewall can pass | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/10/2024 | APPROVED | FWILLIS |
| Note: 12/21/2023 - PREVIOUS INSPECTION NOTES 12/21/23 1. Engineered letter shows truss A5, previous notes show that truss C01 was the damaged trusses, Letter has also not been approved by Building Dept. 2. Missing SDWC15450 screws at studs to base plate as required on plan page SD1. 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23: Only roof sheathing & down cell approved. * Will need engineer's repair letter for both damaged C01 trusses that were exposed to weather for an extended time along with having improperly repaired broken webs and missing web braces/engineering. * Missing SDWC15450 screws at studs to base plate as required on plan page SD1. * Portable toilets required On-Site per P311.1. | |||
| ELECTRIC-TUG | 01/05/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 10:30am | |||
| FIREWALL DRYWALL NAILING | 12/21/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Tie down inspection needs to be passed before firewall can pass | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/21/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 12/21/23 1. Engineered letter shows truss A5, previous notes show that truss C01 was the damaged trusses, Letter has also not been approved by Building Dept. 2. Missing SDWC15450 screws at studs to base plate as required on plan page SD1. 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23: Only roof sheathing & down cell approved. * Will need engineer's repair letter for both damaged C01 trusses that were exposed to weather for an extended time along with having improperly repaired broken webs and missing web braces/engineering. * Missing SDWC15450 screws at studs to base plate as required on plan page SD1. * Portable toilets required On-Site per P311.1. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/19/2023 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23: Only roof sheathing & down cell approved. * Will need engineer's repair letter for both damaged C01 trusses that were exposed to weather for an extended time along with having improperly repaired broken webs and missing web braces/engineering. * Missing SDWC15450 screws at studs to base plate as required on plan page SD1. * Portable toilets required On-Site per P311.1. | |||
| WALL SHEATHING | 11/15/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/15/23: Only roof sheathing & down cell approved. * Will need engineer's repair letter for both damaged C01 trusses that were exposed to weather for an extended time along with having improperly repaired broken webs and missing web braces/engineering. * Missing SDWC15450 screws at studs to base plate as required on plan page SD1. * Portable toilet facilities required On-Site as required by P311.1. | |||
| ROOF VALLEY & METAL | 11/15/2023 | APPROVED | RSIMS |
| FOUND SURVEY APPROVED (OFFICE) | 11/14/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/20/2023 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 10/10/2023 | Disapproved - NO FEE | MKRASKI |
| Note: No ufer ground | |||
| MONOLITHIC SLAB | 10/10/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/05/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/22/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/08/2024 | 01/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/27/2023 | 01/04/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss repair needs to be signed and sealed. | |||
| BLD | COMPLETE | 12/18/2023 | 12/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/12/2023 | 11/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/12/2023 | 11/13/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 09/28/2023 | 10/03/2023 |
| ENGIN1 | COMPLETE | 09/28/2023 | 09/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/28/2023 | 09/29/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/28/2023 | 09/29/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/10/2023 | 08/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/01/2023 | 08/02/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on heatload does not match the site plan. Revise to match 2. Upload manual S as part of heatload not under duct layout | |||
| MECH | HOLD | 07/25/2023 | 07/25/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM THIS IS A MASTER FILE MODEL. ONLY PROVIDE SITE SPECIFIC ITEMS. Provide heatload and duct layout for both sides of duplex. Provide correct garage orientation on duct layout. Do not upload the same document for both sides of duplex (SECOND REQUEST) | |||
| SW1 | COMPLETE | 07/25/2023 | 07/31/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM 4 Inch yard drain must end as a pop-up 15 ft off the road edge. | |||
| ENGIN1 | COMPLETE | 07/25/2023 | 07/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/25/2023 | 07/25/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/05/2023 | 07/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/05/2023 | 07/07/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload and duct layout for both sides of duplex. Provide correct garage orientation on duct layout. Do not upload the same document for both sides of duplex | |||
| SW1 | HOLD | 07/05/2023 | 07/12/2023 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM BUILDER NEEDS TO TO REVIEW THE ATTACHED STORMWATER CHECK LISTFOR ALL REQUIREMENTS NEEDED ON YOUR SUBMITTED SITE PLAN | |||
| ZON | COMPLETE | 07/05/2023 | 07/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no changes for zoning only for stw and engineering | |||
| ENGIN1 | HOLD | 06/20/2023 | 06/20/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please provide slab elevations of 2 adjacent homes on survey. IIron rod is unacceptable as benchmark. Please use a nail in a utility pole, nail in asphalt, fire hydrant or mark in a permanent concrete structure. | |||
| ZON | COMPLETE | 06/20/2023 | 06/20/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/20/2023 | 06/22/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Heatload and Duct layout for both sides of duplex | |||
| SW1 | HOLD | 06/20/2023 | 06/28/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Refer to stormwater checklist to make the corrections needed to meet the city minimums stormwater requirements | |||
| SWALE | COMPLETE | 05/25/2023 | 07/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 05/25/2023 | 05/25/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please provide slab elevations of 2 adjacent homes on survey. IIron rod is unacceptable as benchmark. Please use a nail in a utility pole, nail in asphalt, fire hydrant or mark in a permanent concrete structure. | |||
| CUSVC | COMPLETE | 05/24/2023 | 05/25/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/24/2023 | 05/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/24/2023 | 05/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/24/2023 | 05/26/2023 |
| LOCATE | COMPLETE | 05/24/2023 | 05/26/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/24/2023 | 05/26/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/24/2023 | 06/06/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See additional notes about the Underdrain proposal along the driveway. | |||
| ZON | HOLD | 05/24/2023 | 05/25/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show on site plan width of driveway at the flagpole portion of lot and show that it meets a 5ft setback on each side. | |||
| BLD | COMPLETE | 05/24/2023 | 05/26/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/24/2023 | 05/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload and duct layout for both sides of duplex |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 07/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/25/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 07/25/2024 |
| SEWER CREDIT | (¤2,016.00) | 08/17/2023 |
| SEWER INSPECTION | ¤25.00 | 08/17/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 08/17/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 08/17/2023 |
| SITE PLAN 30 | ¤30.00 | 08/17/2023 |
| CONNECTION FEES | ¤2,332.52 | 08/17/2023 |
| WATER- TURN ON | ¤50.00 | 08/17/2023 |
| ADJUSTMENT 50% | (¤448.13) | 08/17/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/17/2023 |
| INSPECTION - RESIDENTIAL | ¤866.25 | 08/17/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/17/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/17/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/17/2023 |
| IMPACT FEE FIRE | ¤841.04 | 08/17/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/17/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/17/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 08/17/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 08/17/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 08/17/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 08/17/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 08/17/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 08/17/2023 |
| SURCHARGE FS 533.721 | ¤4.48 | 08/17/2023 |
| SURCHARGE - FS 468.631 | ¤6.72 | 08/17/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/17/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/17/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/17/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/17/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/17/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 08/17/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 08/17/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤38,677.58 |