I want to search for...
Permit #2023051307
Permit Details
Status: COED
| Parcel Id: 07-11-31-7021-00010-0340 |
| CONDITIONED SPACE: 1298 sqft |
| CONDITIONED SPACE: 1298 sqft |
| GARAGE: 262 sqft |
| GARAGE: 262 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| Total Square Footage: 3274 sqft |
| Block: 00010 |
| Subdivision: 2186 - SECTION 21-WYNNFIELD |
| Job Phone: 863-647-5815 |
| Location Address: 83 WELLWOOD LN |
| Type: DU - DUPLEX |
| Issue Date: 08/29/2023 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: SU CASA PROPERTY MANAGEMENT OF FLORIDA LLC |
|
Address 5116 S LAKELAND DRIVE LAKELAND, FL 33813 |
| Lot: 0340 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: DUPLEX - THE OPPORTUNITY MODEL |
| Type: CN |
| Original Permit #: 2023031577 |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/14/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 05/08/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/8/24 1. Front doors do not stay closed 2. Insulation foam in attic space must be painted with fire retardant (AHU and plywood in attic) 3. Island power is required to have outlets at each end per NEC 210.50 C 2 4. Laundry circuits must just serve laundry room NEC 210.11 C 2 5. Dinning area cicuit not labled in panel 5/2/2024 - PREVIOUS INSPECTION NOTES 5/2/24 1. Temp power pole must be removed before final 2. AHU's (both units) have undersized breaker installed 3. Extra building materials need to be removed before final 4. 2'' square washer are required for garage door bucks per plans (removed during door installion it appears) Stopped inspection in garage 4/26/2024 - PREVIOUS INSPECTION NOTES 1. Line set chase needs to be sealed 2. Backflow preventer on outside hose bibs need to have tamper proof screw broken off 3. Soffit penitrations above electrical service need to be properly sealed 4. Porta john needs to be removed before final 5. All garage penitrations need to be sealed Stopped inspection, Only walked outside and in garage, did not check AHU in attic | |||
| BLD - BUILDING FINAL | 05/02/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/2/24 1. Temp power pole must be removed before final 2. AHU's (both units) have undersized breaker installed 3. Extra building materials need to be removed before final 4. 2'' square washer are required for garage door bucks per plans (removed during door installion it appears) Stopped inspection in garage 4/26/2024 - PREVIOUS INSPECTION NOTES 1. Line set chase needs to be sealed 2. Backflow preventer on outside hose bibs need to have tamper proof screw broken off 3. Soffit penitrations above electrical service need to be properly sealed 4. Porta john needs to be removed before final 5. All garage penitrations need to be sealed Stopped inspection, Only walked outside and in garage, did not check AHU in attic | |||
| BLD - BUILDING FINAL | 04/26/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Line set chase needs to be sealed 2. Backflow preventer on outside hose bibs need to have tamper proof screw broken off 3. Soffit penitrations above electrical service need to be properly sealed 4. Porta john needs to be removed before final 5. All garage penitrations need to be sealed Stopped inspection, Only walked outside and in garage, did not check AHU in attic | |||
| U-CROSS CONNECTION | 04/23/2024 | FINAL APPROVED | LFITZGERALD |
| Note: has potable irrigation with PVB AT BOTH UNITS-NO CROSS CNNECTION | |||
| ROW- PROJECT STATUS | 04/19/2024 | APPROVED | GBERTOLA |
| Note: MEETING WITH THE BUILDER | |||
| ROW - FINAL APRON (AFTER POUR) | 04/19/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/19/2024 | APPROVED | GBERTOLA |
| Note: 5/19/2024= COMPARING THE FINAL SURVEY AND SWALE PLAN, THE DIFFERENCE IS 2 HUNDRED. STILL INSIDE THE TOLERANCE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/17/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED. 2) YOUR DRAINAGE OF THE LOT DOESN'T MATCH WITH THE LATEST SITE PLAN THAT WAS PROPOSED AND APPROVED. THE FINAL SURVEY SHOWS YOUR WATER FLOWING FROM BACK TO THE FRONT. BUT THE SITE PLAN SHOWS THE BACK YARD AT THE BACK CORNERS OF THE HOUSE WAS PROPOSED TO THE DRAIN TO THE DRAINAGE FEATURE IN THE BACK. 3) THE DRAINAGE ALONG THE SIDES OF THE HOUSE NEED TO HAVE POSITIVE FALL TO THE FRONT ROADSIDE SWALE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/19/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW - STORMWATER FINAL | 04/19/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/17/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED. 2) YOUR DRAINAGE OF THE LOT DOESN'T MATCH WITH THE LATEST SITE PLAN THAT WAS PROPOSED AND APPROVED. THE FINAL SURVEY SHOWS YOUR WATER FLOWING FROM BACK TO THE FRONT. BUT THE SITE PLAN SHOWS THE BACK YARD AT THE BACK CORNERS OF THE HOUSE WAS PROPOSED TO THE DRAIN TO THE DRAINAGE FEATURE IN THE BACK. 3) THE DRAINAGE ALONG THE SIDES OF THE HOUSE NEED TO HAVE POSITIVE FALL TO THE FRONT ROADSIDE SWALE. | |||
| ELECTRIC - EARLY POWER | 04/05/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Inspector Notes from Inspection 2170 Emailed FPL @ 1010. Release Power 12/20/2023 - PREVIOUS INSPECTION NOTES Emailed FPL @ 1118. Release Power Inspector Notes from Inspection 2170 Emailed FPL @ 1010. Release Power 12/20/2023 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 02/29/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U - SEWER TIE IN | 02/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 02/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| FIREWALL FINAL | 02/21/2024 | APPROVED | MKRASKI |
| FIREWALL FINAL | 02/20/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 2/20/24 Ceiling is already hung, can not see if previous item has been repaired. 1/10/2024 - PREVIOUS INSPECTION NOTES PVC protecting Wires going through firewall not fire foamed.. | |||
| INSULATION | 02/09/2024 | APPROVED | RSIMS |
| Note: 2/7/2024 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 02/07/2024 | CANCELLED BY APPLICANT | MKRASKI |
| FIREWALL DRYWALL NAILING | 02/02/2024 | APPROVED | KSANDOE |
| Note: 1/31/2024 - PREVIOUS INSPECTION NOTES Smoke barrier needs to extend all the way to the facia through the soffits 1/25/2024 - PREVIOUS INSPECTION NOTES 1/24/2024 - PREVIOUS INSPECTION NOTES 1. Soffit is up and can not verify that smoke barrier extends to top of soffit 2. All seams and joints need to be sealed, (will not see again for final, plans call for 5/8''s type x on ceiling and firewall) 3. All conduits extending through smoke barrier must be sealed | |||
| ELECTRIC TEMP POLE | 02/02/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1010. Release Power 12/20/2023 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL DRYWALL NAILING | 01/31/2024 | Disapproved - NO FEE | KSANDOE |
| Note: Smoke barrier needs to extend all the way to the facia through the soffits 1/25/2024 - PREVIOUS INSPECTION NOTES 1/24/2024 - PREVIOUS INSPECTION NOTES 1. Soffit is up and can not verify that smoke barrier extends to top of soffit 2. All seams and joints need to be sealed, (will not see again for final, plans call for 5/8''s type x on ceiling and firewall) 3. All conduits extending through smoke barrier must be sealed | |||
| FIREWALL DRYWALL NAILING | 01/25/2024 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 1/24/2024 - PREVIOUS INSPECTION NOTES 1. Soffit is up and can not verify that smoke barrier extends to top of soffit 2. All seams and joints need to be sealed, (will not see again for final, plans call for 5/8''s type x on ceiling and firewall) 3. All conduits extending through smoke barrier must be sealed | |||
| FIREWALL DRYWALL NAILING | 01/24/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Soffit is up and can not verify that smoke barrier extends to top of soffit 2. All seams and joints need to be sealed, (will not see again for final, plans call for 5/8''s type x on ceiling and firewall) 3. All conduits extending through smoke barrier must be sealed | |||
| LATH/BRICK/ WATER BARRIER | 01/24/2024 | APPROVED | MKRASKI |
| ALL ROUGH | 01/10/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 12/20/2023 - PREVIOUS INSPECTION NOTES 12/15/2023 - PREVIOUS INSPECTION NOTES 12/15/23: Need revision submitted to & Approved by the City for the different windows that are installed (41886) than what was originally submitted (17676-R2). Also, please provide installation instructions as this size window under the FPA number does not show on the DBPR approved documents. * Need Meter Panels labeled for A & B units. Unit A: 1). 5ft head pressure not holding. 2). Dryer exhaust needs to be properly sealed at roof sheathing. Unit B: 1). All windows are missing anchors at center locations. 1-10-24 1. Both units have holes in panel box that need to be filled. Plastic insert will not do. 2. Both units front and rear doors not installed. Check on insulation. | |||
| FIREWALL FINAL | 01/10/2024 | Disapproved - NO FEE | FWILLIS |
| Note: PVC protecting Wires going through firewall not fire foamed.. | |||
| ALL ROUGH | 12/20/2023 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 12/15/2023 - PREVIOUS INSPECTION NOTES 12/15/23: Need revision submitted to & Approved by the City for the different windows that are installed (41886) than what was originally submitted (17676-R2). Also, please provide installation instructions as this size window under the FPA number does not show on the DBPR approved documents. * Need Meter Panels labeled for A & B units. Unit A: 1). 5ft head pressure not holding. 2). Dryer exhaust needs to be properly sealed at roof sheathing. Unit B: 1). All windows are missing anchors at center locations. | |||
| ELECTRIC TEMP POLE | 12/20/2023 | CANCELLED BY APPLICANT | MKRASKI |
| ALL ROUGH | 12/15/2023 | Disapproved - NO FEE | RSIMS |
| Note: 12/15/23: Need revision submitted to & Approved by the City for the different windows that are installed (41886) than what was originally submitted (17676-R2). Also, please provide installation instructions as this size window under the FPA number does not show on the DBPR approved documents. * Need Meter Panels labeled for A & B units. Unit A: 1). 5ft head pressure not holding. 2). Dryer exhaust needs to be properly sealed at roof sheathing. Unit B: 1). All windows are missing anchors at center locations. | |||
| WALL SHEATHING | 11/15/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2023 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 11/15/2023 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/14/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/18/2023 | APPROVED | RSIMS |
| Note: 10/17/2023 - PREVIOUS INSPECTION NOTES Contractor on site making repairs for missed dowels, stopped inspection not ready. | |||
| TIE BEAM / LINTEL | 10/17/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Contractor on site making repairs for missed dowels, stopped inspection not ready. | |||
| MONOLITHIC SLAB | 10/03/2023 | APPROVED | MKRASKI |
| Note: | |||
| MONOLITHIC SLAB | 10/02/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 10/2/23 1. No 50 lbs of pressure on supply lines 2. Missing 3 dowels marked on plans 3. Footings needs to be cleaned out where wash outs have occured 4. Form board need to be added or footing walls need to be backfilled to match details 9/29/2023 - PREVIOUS INSPECTION NOTES 9/28/2023 - PREVIOUS INSPECTION NOTES 9/28/23 1. No compaction test on site 2. No intent to treat paper work onsite Stopped inspection | |||
| MONOLITHIC SLAB | 09/29/2023 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 9/28/2023 - PREVIOUS INSPECTION NOTES 9/28/23 1. No compaction test on site 2. No intent to treat paper work onsite Stopped inspection | |||
| MONOLITHIC SLAB | 09/28/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 9/28/23 1. No compaction test on site 2. No intent to treat paper work onsite Stopped inspection | |||
| MONOLITHIC SLAB | 09/27/2023 | CANCELLED BY APPLICANT | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/22/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/22/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/16/2024 | 04/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/21/2024 | 02/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/12/2023 | 11/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/12/2023 | 11/13/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/28/2023 | 09/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/28/2023 | 09/29/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/28/2023 | 09/29/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/14/2023 | 08/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 08/14/2023 | 08/21/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the revised Survey submitted 8/14/23 and Site Plan submitted 8/21/23, the structure will not fall inside the SFHA. No elevation certificates will be required. | |||
| MECH | HOLD | 07/17/2023 | 07/18/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This is a master filed home. Provide only heatload (Named Heatload) and Duct layout (Named duct layout) for both sides of duplex | |||
| PLFM | HOLD | 07/17/2023 | 08/01/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Staff has not heard back from the survey company after the discussion about the flood zone line that took place on 7/21/23. Staff disagrees with the depicted location of the flood zone line, and instead believes it to be on the property. Per 10.02.07.B in the Land Development Code, the Base Flood Elevation must be established by an engineer and submitted to the City for review. Additional comments may apply when the analysis is submitted. | |||
| MECH | HOLD | 07/05/2023 | 07/06/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload and duct layout for both sides of duplex. Provide correct garage orientation on duct layout and correct heatload for each side. Do not upload same doument for each side of duplex (Third Request) | |||
| PLFM | HOLD | 07/05/2023 | 07/10/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Comment not addressed: both the Site Plan and Survey need to be revised. Revised survey was not provided. Per 10.02.07.B in the Land Development Code, the Base Flood Elevation must be established by an engineer and submitted to the City for review. Additional comments may apply when the analysis is submitted. | |||
| SW1 | COMPLETE | 07/05/2023 | 07/12/2023 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/05/2023 | 07/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/05/2023 | 07/05/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes only for stw | |||
| SW1 | HOLD | 06/28/2023 | 06/28/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Refer to stormwater checklist to make the corrections needed to meet the city minimums stormwater requirements | |||
| ENGIN1 | COMPLETE | 06/20/2023 | 06/20/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 06/20/2023 | 06/27/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Comment not addressed: both the Site Plan and Survey need to be revised. Revised survey was not provided. Per 10.02.07.B in the Land Development Code, the Base Flood Elevation must be established by an engineer and submitted to the City for review. Additional comments may apply when the analysis is submitted. | |||
| MECH | HOLD | 06/20/2023 | 06/22/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload and duct layout for both sides of duplex. (Second Request) | |||
| ZON | COMPLETE | 06/20/2023 | 06/20/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/05/2023 | 06/05/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/25/2023 | 07/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 05/25/2023 | 05/25/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM There is an unnumbered A Zone on the property, both the Site Plan and Survey need to be revised as neither have this information. Per 10.02.07.B in the Land Development Code, the Base Flood Elevation must be established by an engineer and submitted to the City for review. Additional comments may apply when the analysis is submitted. | |||
| ENGIN1 | HOLD | 05/25/2023 | 05/25/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please provide slab elevations of 2 adjacent homes on survey. | |||
| ZON | COMPLETE | 05/24/2023 | 05/25/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/24/2023 | 05/26/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/24/2023 | 05/25/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/24/2023 | 05/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/24/2023 | 05/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/24/2023 | 05/26/2023 |
| LOCATE | COMPLETE | 05/24/2023 | 05/26/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/24/2023 | 05/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload and duct layout for both sides of duplex |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/15/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/15/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/15/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/29/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/29/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 08/29/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 08/29/2023 |
| SEWER INSPECTION | ¤25.00 | 08/29/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 08/29/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 08/29/2023 |
| SITE PLAN 30 | ¤30.00 | 08/29/2023 |
| CONNECTION FEES | ¤2,332.52 | 08/29/2023 |
| WATER- TURN ON | ¤50.00 | 08/29/2023 |
| ADJUSTMENT 50% | (¤448.13) | 08/29/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/29/2023 |
| INSPECTION - RESIDENTIAL | ¤866.25 | 08/29/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 08/29/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 08/29/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/29/2023 |
| IMPACT FEE FIRE | ¤841.04 | 08/29/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/29/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/29/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 08/29/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 08/29/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 08/29/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 08/29/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 08/29/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 08/29/2023 |
| SURCHARGE FS 533.721 | ¤4.48 | 08/29/2023 |
| SURCHARGE - FS 468.631 | ¤6.72 | 08/29/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/29/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/29/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/29/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤40,746.08 |