I want to search for...
Permit #2023051365
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-2500 |
| CONDITIONED SPACE: 2487 sqft |
| GARAGE: 567 sqft |
| OPENED PORCH (WITH ROOF) : 432 sqft |
| Total Square Footage: 3486 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-944-9546 |
| Location Address: 165 ASPEN WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/12/2023 |
| NOC: RECORDED |
| Applicant name: ANTHONY THOMAS DI NIZO JR |
| Owner: ZABEL CHRISTSOPHER & MICHELLE |
|
Address 19 CINNAMON BEACH WAY PALM COAST, FL 32137 |
| Lot: 2500 |
| Contracted Stated Job Value: ¤625,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
LUXURY BUILDERS INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
280 FENTRESS BLVD SUITE 2 DAYTONA BEACH, FL 32114 |
CGC038675 (Exp: 08/31/2026) | 386-944-9546 |
Sub Contractors
BEN K REIHL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
605 MCINTOSH ROAD Ormond Beach, 32174 |
EC0002867 (Exp: 08/31/2026) | (386) 677-4464 | 386-673-4199 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
VINCENT PASQUALE POLIZZI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
219 W OHIO AVENUE LAKE HELEN, FL 32734 |
CFC057948 (Exp: 08/31/2026) | (386)774-8244 | (386)775-1749 |
KENNETH KELLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
8000 BELFORT PKWY SUITE 200 JACKSONVILLE, FL 32256 |
CCC1333799 (Exp: 08/31/2024) | 904-900-4745 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/15/2024 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 08/15/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/15/2024 11:49:28 AM *** reclaim master backflow-no cross connection-also-there is an irrigation meter as well in the water meter box that is not required-informed builder and home owner to contact city utility and get it removed- 8/29/2023 - PREVIOUS INSPECTION NOTES scheduled too early-not ready yet | |||
| ROW - FINAL APRON (AFTER POUR) | 08/15/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 08/15/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 08/15/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/14/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/14/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/14/24 BEFORE ROW STORMWATER FINAL NEED TO RAISE/ REMOVE THE SPRINKLER HEAD ON RIGHT SIDE ALONG PROPERTY LINE AS IT IS UNDER SOD ** ALONG EASMENT BANK IN REAR IN REAR NEED TO RAISE ALL POP-UP DRAINS SO THAT THEY ARE ON TOP OF THE SOD AND NOT UNDERNEATH AS THIS WILL CREATE WASHOUTS AND EROSION INTO THE POND ** ALL AREAS NOTED OUTLINED WITH WHITE PAINT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/08/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/08/24 RIGHT FRONT CORNER OF STRUCTURE ELEVATION SHOT IS .03 LOWER THAN YOUR FINISHED FLOOR Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** ELEVATION SHOTS ALONG RIGHT SIDE ARE .70 HIGHER THAN PROPOSED | |||
| GRAVITY SEWER TEST | 07/26/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 07/24/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 07/10/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/10/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 06/25/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 6/24/2024 - PREVIOUS INSPECTION NOTES ** 06/24/24 BUILDER NEEDS TO RE-ESTABLISH THE PAVER RESTRAINTS AS MATERIAL HAS WASHED BACK INTO THEM AND COLLAPSING THEM IN AREAS | |||
| ELECTRIC - EARLY POWER | 07/10/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 06/25/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 06/25/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _____________________________________________________________________________________________________________________ 6/24/2024 - PREVIOUS INSPECTION NOTES ** 06/24/24 SITE NOT READY FOR INSPECTION DUE TO RAINS OVER WEEKEND NEED TO CLEAN OUT ALL OF THE WASHED IN MATERIAL IN APRON TO GET THE MINIMUM AMOUNT OF CONCRETE _____________________________________________________________________________________________________________________ 6/21/2024 - PREVIOUS INSPECTION NOTES 6/21/24= THE APRON WING SHOULD START A 5FT FROM THE EDGE OF TTHE ROAD AND NEED TO BE 36 INCHES WIDE . 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET | |||
| ROW- PAVER RESTRAINTS | 06/25/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/25/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 6/24/2024 - PREVIOUS INSPECTION NOTES ** 06/24/24 BUILDER NEEDS TO RE-ESTABLISH THE PAVER RESTRAINTS AS MATERIAL HAS WASHED BACK INTO THEM AND COLLAPSING THEM IN AREAS | |||
| ROW- PRE-APRON (PRE-POUR) | 06/24/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 06/24/24 SITE NOT READY FOR INSPECTION DUE TO RAINS OVER WEEKEND NEED TO CLEAN OUT ALL OF THE WASHED IN MATERIAL IN APRON TO GET THE MINIMUM AMOUNT OF CONCRETE _____________________________________________________________________________________________________________________ 6/21/2024 - PREVIOUS INSPECTION NOTES 6/21/24= THE APRON WING SHOULD START A 5FT FROM THE EDGE OF TTHE ROAD AND NEED TO BE 36 INCHES WIDE . 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET | |||
| ROW- PAVER RESTRAINTS | 06/24/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/24/24 BUILDER NEEDS TO RE-ESTABLISH THE PAVER RESTRAINTS AS MATERIAL HAS WASHED BACK INTO THEM AND COLLAPSING THEM IN AREAS | |||
| ROW- PRE-APRON (PRE-POUR) | 06/21/2024 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 6/21/24= THE APRON WING SHOULD START A 5FT FROM THE EDGE OF TTHE ROAD AND NEED TO BE 36 INCHES WIDE . 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET | |||
| ROW- PRE-APRON (PRE-POUR) | 06/17/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET | |||
| WATER METER INSTALLATION REQUEST | 04/29/2024 | APPROVED | CBOWERMASTER |
| DRYWALL NAILING | 04/03/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 02/20/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/13/2024 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 02/13/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 01/30/2024 | Approval - Private Provider | PPROVIDER |
| DOWN CELL | 01/30/2024 | Approval - Private Provider | PPROVIDER |
| GAS ROUGH | 01/30/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 11/02/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 10/26/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/26/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 10/05/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 10/03/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/21/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 09/05/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/29/2023 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 08/29/2023 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: scheduled too early-not ready yet |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/18/2024 | 06/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/18/2024 | 06/24/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/18/2024 | 06/18/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/05/2024 | 02/06/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/03/2023 | 11/03/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM GAS SUBCONTRACTOR INACTIVE. CAN NOT UPDATE INSPECTIONS FOR 2450, 2460 | |||
| BADMIN | COMPLETE | 11/02/2023 | 11/02/2023 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM GAS SUBCONTRACTOR INACTIVE. CAN NOT UPDATE INSPECTIONS FOR 2450, 2460 | |||
| ENGIN1 | COMPLETE | 10/03/2023 | 10/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/03/2023 | 10/03/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/16/2023 | 08/16/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Repeat Comment The file name for the notice of commencement should be 'notice of commencement' - see document submittal requirements on the permit portal page for directions. The notice of commmencement must include the property owners mailing address, this is the primary reason for the notice of commencement so notice to owners can be sent by laborers and suppliers. The address should be added and the document re-recorded. | |||
| BADMIN | INFORMATION | 07/14/2023 | 07/14/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file to notice of commencement. The notice of commencment is required to have the property owners address where the notice to owners are mailed, please correct and re-record the corrected copy. | |||
| BLD | COMPLETE | 06/29/2023 | 07/05/2023 |
| Note: Released By: JPI | |||
| GAS | COMPLETE | 06/29/2023 | 06/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/29/2023 | 07/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/29/2023 | 07/11/2023 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/29/2023 | 06/30/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/23/2023 | 06/23/2023 |
| Note: Held By: JPI 1. The 0623 resubmittal attachments have not responded to the prior product approval comment. FBC 105 | |||
| GAS | HOLD | 06/23/2023 | 06/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide tank size on site plan. Also tank needs to be 10 ft from house. | |||
| ZON | COMPLETE | 06/14/2023 | 06/14/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| GAS | HOLD | 06/14/2023 | 06/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide piping size and material to grill, and range on gas diagram. 2. Provide distance from tank to property line and tank to house on site plan. Upload site plan separately from gas riser. 3. Need to add subcontractor in portal.can not upload a paper with subcontractor name on it. | |||
| BLD | HOLD | 06/14/2023 | 06/14/2023 |
| Note: Held By: JPI 1. The attachment with description PRODUCT APPROVAL is not the product approval sheet. Please cure. See prior comments. 107.2.4 | |||
| ELEC | COMPLETE | 06/14/2023 | 06/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/14/2023 | 06/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/14/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 05/26/2023 | 05/31/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/25/2023 | 05/30/2023 |
| Note: Held By: JPI 1. Product 125.05 produced no results based on a recent DBPR inquiry. Please cure. 107.2.4 https://www.floridabuilding.org/pr/pr_app_lst.aspx 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a shop drawing approval stamp. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 05/25/2023 | 05/26/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | HOLD | 05/25/2023 | 05/30/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Outlets in kitchen, laundry and garage need to be GFCI protected. NEC 2017 210.8 2. Need correct outlet spacing in kitchen. NEC 2017 210.52 (B) (3) | |||
| ENGIN1 | COMPLETE | 05/25/2023 | 05/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | HOLD | 05/25/2023 | 05/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide gas riser diagram and show tank location with setbacks on site plan List gas subcontractor | |||
| LOCATE | COMPLETE | 05/25/2023 | 05/30/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/25/2023 | 05/31/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide duct layout signed by the AC contractor 2. Energy calcs need to be signed by the builder | |||
| SW1 | HOLD | 05/25/2023 | 06/05/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO RESUBMIT A NEW SITE PLAN WITH EXISTING ELEVATIONS AND PROPOSED | |||
| ZON | HOLD | 05/25/2023 | 05/26/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site Plan: map panel number should be 0038E. Mechanical equiptment must show on site plan. Please provide a correct site plan Landscape plan: does not match the survey / site plan look at foot print of home. donot include any pool on the landscapel pan | |||
| BADMIN | COMPLETE | 05/25/2023 | 05/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/17/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/17/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 09/08/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 09/08/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/12/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/12/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/12/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/12/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/12/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/12/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/12/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/12/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 07/12/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/12/2023 |
| SURCHARGE FS 533.721 | ¤11.18 | 07/12/2023 |
| SURCHARGE - FS 468.631 | ¤16.77 | 07/12/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/12/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/12/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/12/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 07/12/2023 |
| SEWER INSPECTION | ¤25.00 | 07/12/2023 |
| SITE PLAN 30 | ¤30.00 | 07/12/2023 |
| WATER-METER | ¤505.39 | 07/12/2023 |
| WATER-METER | ¤505.39 | 07/12/2023 |
| WATER- TURN ON | ¤25.00 | 07/12/2023 |
| ADJUSTMENT 50% | (¤1,118.13) | 07/12/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/12/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 07/12/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤487.50 | 07/12/2023 |
| CONNECTION FEES | ¤25.00 | 07/12/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 07/12/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,761.77 |