Permit #2023051365

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-2500
CONDITIONED SPACE: 2487 sqft
GARAGE: 567 sqft
OPENED PORCH (WITH ROOF) : 432 sqft
Total Square Footage: 3486 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-944-9546
Location Address: 165 ASPEN WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/12/2023
NOC: RECORDED
Applicant name: ANTHONY THOMAS DI NIZO JR
Owner: ZABEL CHRISTSOPHER & MICHELLE

Address

19 CINNAMON BEACH WAY

PALM COAST, FL 32137

Lot: 2500
Contracted Stated Job Value: ¤625,000.00
Job Description: Single Family Residence
Type: CN

Contractor

LUXURY BUILDERS INC.
Status Location Address State License Number Phone
ACTIVE

280 FENTRESS BLVD SUITE 2

DAYTONA BEACH, FL 32114

CGC038675 (Exp: 08/31/2026) 386-944-9546

Sub Contractors

BEN K REIHL
Status Location Address State License Number Phone Fax
ACTIVE

605 MCINTOSH ROAD

Ormond Beach, 32174

EC0002867 (Exp: 08/31/2026) (386) 677-4464 386-673-4199
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
VINCENT PASQUALE POLIZZI
Status Location Address State License Number Phone Fax
ACTIVE

219 W OHIO AVENUE

LAKE HELEN, FL 32734

CFC057948 (Exp: 08/31/2026) (386)774-8244 (386)775-1749
KENNETH KELLY
Status Location Address State License Number Phone
INACTIVE

8000 BELFORT PKWY SUITE 200

JACKSONVILLE, FL 32256

CCC1333799 (Exp: 08/31/2024) 904-900-4745
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/15/2024 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 08/15/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/15/2024 11:49:28 AM *** reclaim master backflow-no cross connection-also-there is an irrigation meter as well in the water meter box that is not required-informed builder and home owner to contact city utility and get it removed- 8/29/2023 - PREVIOUS INSPECTION NOTES scheduled too early-not ready yet
ROW - FINAL APRON (AFTER POUR) 08/15/2024 APPROVED EMADISON
ROW - STORMWATER FINAL 08/15/2024 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 08/15/2024 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/14/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 08/14/2024 APPROVED - AS NOTED EMADISON
Note: ** 08/14/24 BEFORE ROW STORMWATER FINAL NEED TO RAISE/ REMOVE THE SPRINKLER HEAD ON RIGHT SIDE ALONG PROPERTY LINE AS IT IS UNDER SOD ** ALONG EASMENT BANK IN REAR IN REAR NEED TO RAISE ALL POP-UP DRAINS SO THAT THEY ARE ON TOP OF THE SOD AND NOT UNDERNEATH AS THIS WILL CREATE WASHOUTS AND EROSION INTO THE POND ** ALL AREAS NOTED OUTLINED WITH WHITE PAINT
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/08/2024 Disapproved - NO FEE EMADISON
Note: ** 08/08/24 RIGHT FRONT CORNER OF STRUCTURE ELEVATION SHOT IS .03 LOWER THAN YOUR FINISHED FLOOR Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** ELEVATION SHOTS ALONG RIGHT SIDE ARE .70 HIGHER THAN PROPOSED
GRAVITY SEWER TEST 07/26/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 07/24/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 07/10/2024 APPROVED - AS NOTED EMADISON
Note: ** 07/10/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 06/25/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 6/24/2024 - PREVIOUS INSPECTION NOTES ** 06/24/24 BUILDER NEEDS TO RE-ESTABLISH THE PAVER RESTRAINTS AS MATERIAL HAS WASHED BACK INTO THEM AND COLLAPSING THEM IN AREAS
ELECTRIC - EARLY POWER 07/10/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 06/25/2024 PARTIALLY APPROVED EMADISON
Note: ** 06/25/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _____________________________________________________________________________________________________________________ 6/24/2024 - PREVIOUS INSPECTION NOTES ** 06/24/24 SITE NOT READY FOR INSPECTION DUE TO RAINS OVER WEEKEND NEED TO CLEAN OUT ALL OF THE WASHED IN MATERIAL IN APRON TO GET THE MINIMUM AMOUNT OF CONCRETE _____________________________________________________________________________________________________________________ 6/21/2024 - PREVIOUS INSPECTION NOTES 6/21/24= THE APRON WING SHOULD START A 5FT FROM THE EDGE OF TTHE ROAD AND NEED TO BE 36 INCHES WIDE . 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET
ROW- PAVER RESTRAINTS 06/25/2024 APPROVED - AS NOTED EMADISON
Note: ** 06/25/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________ 6/24/2024 - PREVIOUS INSPECTION NOTES ** 06/24/24 BUILDER NEEDS TO RE-ESTABLISH THE PAVER RESTRAINTS AS MATERIAL HAS WASHED BACK INTO THEM AND COLLAPSING THEM IN AREAS
ROW- PRE-APRON (PRE-POUR) 06/24/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 06/24/24 SITE NOT READY FOR INSPECTION DUE TO RAINS OVER WEEKEND NEED TO CLEAN OUT ALL OF THE WASHED IN MATERIAL IN APRON TO GET THE MINIMUM AMOUNT OF CONCRETE _____________________________________________________________________________________________________________________ 6/21/2024 - PREVIOUS INSPECTION NOTES 6/21/24= THE APRON WING SHOULD START A 5FT FROM THE EDGE OF TTHE ROAD AND NEED TO BE 36 INCHES WIDE . 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET
ROW- PAVER RESTRAINTS 06/24/2024 Disapproved - NO FEE EMADISON
Note: ** 06/24/24 BUILDER NEEDS TO RE-ESTABLISH THE PAVER RESTRAINTS AS MATERIAL HAS WASHED BACK INTO THEM AND COLLAPSING THEM IN AREAS
ROW- PRE-APRON (PRE-POUR) 06/21/2024 Disapproved -FEE REQUIRED GBERTOLA
Note: 6/21/24= THE APRON WING SHOULD START A 5FT FROM THE EDGE OF TTHE ROAD AND NEED TO BE 36 INCHES WIDE . 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET
ROW- PRE-APRON (PRE-POUR) 06/17/2024 Disapproved - NO FEE EMADISON
Note: ** 06/17/24 SITE PLAN INDICATES A CONCRETE DRIVEWAY. IF YOU ARE INSTALLING A PAVER DRIVEWAY YOU NEED TO PROVIDE THE PAVER RESTRAINT DETAIL AND CIRCLE THE OPTION YOU ARE BUILDING THE DRIVEWAY TO SO THE INSPECTOR KNOWS WHAT TO INSPECT FOR. INSPECTOR LOOKED IN PERMIT BOX FOR DOCUMENTS FOR OPTION NONE THERE AS WELL AS NOTHING UPLOADED INTO THE PERMIT ATTACHMENTS. ** BUILDER WILL ALSO BE REQUIRED TO SUBMIT A REVISED SITE PLAN INDICATING YOU ARE INSTALLING A PAVER DRIVEWAY * FORMS NOT COMPLETELY SET
WATER METER INSTALLATION REQUEST 04/29/2024 APPROVED CBOWERMASTER
DRYWALL NAILING 04/03/2024 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 02/20/2024 Approval - Private Provider PPROVIDER
INSULATION 02/13/2024 CANCELLED BY APPLICANT WEB
INSULATION 02/13/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 01/30/2024 Approval - Private Provider PPROVIDER
DOWN CELL 01/30/2024 Approval - Private Provider PPROVIDER
GAS ROUGH 01/30/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 11/02/2023 Approval - Private Provider PPROVIDER
WALL SHEATHING 10/26/2023 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/26/2023 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 10/05/2023 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 10/03/2023 APPROVED TBAKER
TIE BEAM / LINTEL 09/21/2023 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 09/05/2023 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 08/29/2023 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 08/29/2023 CANCELLED BY APPLICANT LFITZGERALD
Note: scheduled too early-not ready yet

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 06/18/2024 06/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/18/2024 06/24/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 06/18/2024 06/18/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 02/05/2024 02/06/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 11/03/2023 11/03/2023
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM GAS SUBCONTRACTOR INACTIVE. CAN NOT UPDATE INSPECTIONS FOR 2450, 2460
BADMIN COMPLETE 11/02/2023 11/02/2023
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM GAS SUBCONTRACTOR INACTIVE. CAN NOT UPDATE INSPECTIONS FOR 2450, 2460
ENGIN1 COMPLETE 10/03/2023 10/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/03/2023 10/03/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 08/16/2023 08/16/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Repeat Comment The file name for the notice of commencement should be 'notice of commencement' - see document submittal requirements on the permit portal page for directions. The notice of commmencement must include the property owners mailing address, this is the primary reason for the notice of commencement so notice to owners can be sent by laborers and suppliers. The address should be added and the document re-recorded.
BADMIN INFORMATION 07/14/2023 07/14/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file to notice of commencement. The notice of commencment is required to have the property owners address where the notice to owners are mailed, please correct and re-record the corrected copy.
BLD COMPLETE 06/29/2023 07/05/2023
Note: Released By: JPI
GAS COMPLETE 06/29/2023 06/30/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/29/2023 07/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/29/2023 07/11/2023
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON COMPLETE 06/29/2023 06/30/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 06/23/2023 06/23/2023
Note: Held By: JPI 1. The 0623 resubmittal attachments have not responded to the prior product approval comment. FBC 105
GAS HOLD 06/23/2023 06/26/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide tank size on site plan. Also tank needs to be 10 ft from house.
ZON COMPLETE 06/14/2023 06/14/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
GAS HOLD 06/14/2023 06/15/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide piping size and material to grill, and range on gas diagram. 2. Provide distance from tank to property line and tank to house on site plan. Upload site plan separately from gas riser. 3. Need to add subcontractor in portal.can not upload a paper with subcontractor name on it.
BLD HOLD 06/14/2023 06/14/2023
Note: Held By: JPI 1. The attachment with description PRODUCT APPROVAL is not the product approval sheet. Please cure. See prior comments. 107.2.4
ELEC COMPLETE 06/14/2023 06/20/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 06/14/2023 06/15/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/14/2023 06/21/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
URB COMPLETE 05/26/2023 05/31/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BLD HOLD 05/25/2023 05/30/2023
Note: Held By: JPI 1. Product 125.05 produced no results based on a recent DBPR inquiry. Please cure. 107.2.4 https://www.floridabuilding.org/pr/pr_app_lst.aspx 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a shop drawing approval stamp. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5
CUSVC COMPLETE 05/25/2023 05/26/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC HOLD 05/25/2023 05/30/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Outlets in kitchen, laundry and garage need to be GFCI protected. NEC 2017 210.8 2. Need correct outlet spacing in kitchen. NEC 2017 210.52 (B) (3)
ENGIN1 COMPLETE 05/25/2023 05/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS HOLD 05/25/2023 05/26/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide gas riser diagram and show tank location with setbacks on site plan List gas subcontractor
LOCATE COMPLETE 05/25/2023 05/30/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/25/2023 05/31/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide duct layout signed by the AC contractor 2. Energy calcs need to be signed by the builder
SW1 HOLD 05/25/2023 06/05/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO RESUBMIT A NEW SITE PLAN WITH EXISTING ELEVATIONS AND PROPOSED
ZON HOLD 05/25/2023 05/26/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site Plan: map panel number should be 0038E. Mechanical equiptment must show on site plan. Please provide a correct site plan Landscape plan: does not match the survey / site plan look at foot print of home. donot include any pool on the landscapel pan
BADMIN COMPLETE 05/25/2023 05/30/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 07/17/2024
SW ENG REINSPECTION 30 ¤30.00 07/17/2024
CONTRACTOR CHANGE ¤20.00 09/08/2023
CONTRACTOR CHANGE ¤20.00 09/08/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/12/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/12/2023
FC IMPACT FEE EMS ¤62.00 07/12/2023
IMPACT FEE FIRE ¤420.52 07/12/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/12/2023
FC IMPACT FEE LIBRARY ¤268.00 07/12/2023
IMPACT FEE PARKS ¤1,769.15 07/12/2023
IMPACT FEE SCHOOL ¤5,450.00 07/12/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 07/12/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/12/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/12/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/12/2023
SURCHARGE FS 533.721 ¤11.18 07/12/2023
SURCHARGE - FS 468.631 ¤16.77 07/12/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/12/2023
SW ENG INSPECTION 80 ¤80.00 07/12/2023
SW ENG PRE APRON ¤30.00 07/12/2023
SW ENG - REVIEW 20 ¤20.00 07/12/2023
SW ENG RES REVIEW 200 ¤200.00 07/12/2023
TRANS IMPACT FEE ADMIN ¤99.33 07/12/2023
TRANS IMPACT FEE ADMIN (¤99.33) 07/12/2023
SEWER INSPECTION ¤25.00 07/12/2023
SITE PLAN 30 ¤30.00 07/12/2023
WATER-METER ¤505.39 07/12/2023
WATER-METER ¤505.39 07/12/2023
WATER- TURN ON ¤25.00 07/12/2023
ADJUSTMENT 50% (¤1,118.13) 07/12/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/12/2023
ADMINISTRATIVE - RESID PP ¤225.00 07/12/2023
PLAN REVIEW - RESIDENTIAL ¤487.50 07/12/2023
CONNECTION FEES ¤25.00 07/12/2023
CONTRACTOR CHANGE ¤20.00 07/12/2023
Fees Total Due: ¤0.00 Total Paid: ¤12,761.77