I want to search for...
Permit #2023051381
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00050-0140 |
| CONDITIONED SPACE: 1555 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00050 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 832-726-2202 |
| Location Address: 20 BANNBURY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/30/2023 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN INVESTMENTS1 LLC |
|
Address 162 ORLANDO, FL 32826 |
|
Address 1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/10/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 04/08/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 4/8/24- M1305.1.1 Furnaces and air handlers. Furnaces and air handlers within compartments or alcoves shall have a minimum working space clearance of 3 inches (76 mm) along the sides, back and top with a total width of the enclosing space being not less than 12 inches (305 mm) wider than the furnace or air handler. If the above code is achieved there will be enough space for the return air Balance. Please center the AHU on the support stand also please. 4/2/2024 - PREVIOUS INSPECTION NOTES 4/2/24- The return air vent to the AHU Equipment is listed with a 24X18 vent (432 sq inch) Equipment is tight to the vent creating un balanced return air. M1602.3 Balanced return air/ M1602.2 (3) Return air openings. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/02/2024 | FINAL APPROVED | DHANEY |
| BLD - BUILDING FINAL | 04/02/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 4/2/24- The return air vent to the AHU Equipment is listed with a 24X18 vent (432 sq inch) Equipment is tight to the vent creating un balanced return air. M1602.3 Balanced return air/ M1602.2 (3) Return air openings. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/01/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE BY REROUTING SWALE AROUND AREA --------------------------------------------------------------------- 3/27/2024 - PREVIOUS INSPECTION NOTES 3/25/2024 - PREVIOUS INSPECTION NOTES ALL THE MULCH AND PLANTS IN THE DRAINAGE PATTERN AROUND THE AC UNIT NEED TO BE REMOVED AND SODED ------------------------------------------------------------ 3/19/2024 - PREVIOUS INSPECTION NOTES 3/19/24 YOU CAN PUT IN FOR A FIELD SURVEY BEFORE SUBMITTING AND PASSING A FINAL SURVEY INSPECTION. THANK YO. | |||
| ROW - STORMWATER FINAL | 04/01/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: NEED TO CLEAN ALL DIRT OUT OF CULVERT PASSING AS NOTED THAT YOU WILL TAKE CARE OF IT | |||
| ROW - FINAL APRON (AFTER POUR) | 04/01/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/27/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 3/25/2024 - PREVIOUS INSPECTION NOTES ALL THE MULCH AND PLANTS IN THE DRAINAGE PATTERN AROUND THE AC UNIT NEED TO BE REMOVED AND SODED ------------------------------------------------------------ 3/19/2024 - PREVIOUS INSPECTION NOTES 3/19/24 YOU CAN PUT IN FOR A FIELD SURVEY BEFORE SUBMITTING AND PASSING A FINAL SURVEY INSPECTION. THANK YO. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/25/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: ALL THE MULCH AND PLANTS IN THE DRAINAGE PATTERN AROUND THE AC UNIT NEED TO BE REMOVED AND SODED ------------------------------------------------------------ 3/19/2024 - PREVIOUS INSPECTION NOTES 3/19/24 YOU CAN PUT IN FOR A FIELD SURVEY BEFORE SUBMITTING AND PASSING A FINAL SURVEY INSPECTION. THANK YO. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/25/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ON THE FINAL SURVEY ------------------------------------------------------------ 3/12/2024 - PREVIOUS INSPECTION NOTES ** 03/12/24 NEED ALLDRAINAGE FEATURES ON FINAL SURVEY INCLUDING CULVERT PIPES OF ADJACENT PROPERTIES (LEFT SIDE MISSING CULVERT AND ELEVATION SHOTS (INV) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/19/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 3/19/24 YOU CAN PUT IN FOR A FIELD SURVEY BEFORE SUBMITTING AND PASSING A FINAL SURVEY INSPECTION. THANK YO. | |||
| U-CROSS CONNECTION | 03/15/2024 | APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/12/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 03/12/24 NEED ALLDRAINAGE FEATURES ON FINAL SURVEY INCLUDING CULVERT PIPES OF ADJACENT PROPERTIES (LEFT SIDE MISSING CULVERT AND ELEVATION SHOTS (INV) | |||
| ELECTRIC - EARLY POWER | 02/01/2024 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2200 11/8/23- Please relocate Job box from behind portable restroom so Address is visible from the road. Please label GFCI Outlet breaker before Final. Authorize release of Email to FPL @ 9:26a. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/25/2024 | APPROVED | TPOLACEK |
| Note: 01/25/24 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| U - SEWER TIE IN | 12/12/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 PROVIDE PORTABL RESTROOM BEFORE SLAB INSPECTION. THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 12/12/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 PROVIDE PORTABL RESTROOM BEFORE SLAB INSPECTION. THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC-TUG | 11/08/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 11/8/23- Please relocate Job box from behind portable restroom so Address is visible from the road. Please label GFCI Outlet breaker before Final. Authorize release of Email to FPL @ 9:26a. | |||
| INSULATION | 11/08/2023 | APPROVED | JSTEWART |
| Note: 11/7/2023 - PREVIOUS INSPECTION NOTES 11/17/23- Previous note not rectified..... Please bond metal boxes on garage exterior lights. will check at insulation. (interior and exterior). NEC 250.110 Inspector Notes from Inspection 2420 11/3/23- Please bond metal boxes on garage exterior lights. will check at insulation. | |||
| INSULATION | 11/07/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 11/17/23- Previous note not rectified..... Please bond metal boxes on garage exterior lights. will check at insulation. (interior and exterior). NEC 250.110 Inspector Notes from Inspection 2420 11/3/23- Please bond metal boxes on garage exterior lights. will check at insulation. | |||
| ALL ROUGH | 11/03/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 11/3/23- Please bond metal boxes on garage exterior lights. will check at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 10/31/2023 | APPROVED | JSTEWART |
| ROOF VALLEY & METAL | 10/10/2023 | APPROVED | JSTEWART |
| WALL SHEATHING | 10/05/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/05/2023 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 10/02/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/12/2023 | APPROVED | JSTEWART |
| MONOLITHIC SLAB | 09/05/2023 | APPROVED | JSTEWART |
| Note: 9/1/2023 - PREVIOUS INSPECTION NOTES MISSING UFER GROUND .NEC..250.52(3) | |||
| MONOLITHIC SLAB | 09/01/2023 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: MISSING UFER GROUND .NEC..250.52(3) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/25/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: PROVIDE PORTABL RESTROOM BEFORE SLAB INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 07/27/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | CANCEL | 09/18/2023 | 09/18/2023 |
| ZON | COMPLETE | 09/18/2023 | 09/18/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/18/2023 | 10/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/15/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/15/2023 | 06/19/2023 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 06/15/2023 | 06/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/15/2023 | 06/15/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/08/2023 | 06/10/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| SWALE | COMPLETE | 05/30/2023 | 07/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/25/2023 | 05/30/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a shop drawing approval stamp. For ease of review, please label this file Truss Summary- Profiles or Truss Calculations or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 05/25/2023 | 05/31/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/25/2023 | 05/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/25/2023 | 05/30/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/25/2023 | 05/30/2023 |
| LOCATE | COMPLETE | 05/25/2023 | 05/30/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/25/2023 | 05/31/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/25/2023 | 06/05/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE ALL ADJACENT FINISH FLOOR ELVATIONS THAT SURROUND YOUR PROPOERTY | |||
| ZON | COMPLETE | 05/25/2023 | 05/26/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/25/2023 | 05/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| CONNECTION FEES | ¤1,166.26 | 06/30/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/30/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/30/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/30/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/30/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/30/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/30/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/30/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/30/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/30/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/30/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/30/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/30/2023 |
| SURCHARGE FS 533.721 | ¤3.66 | 06/30/2023 |
| SURCHARGE - FS 468.631 | ¤5.49 | 06/30/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/30/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/30/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/30/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/30/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/30/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/30/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/30/2023 |
| SEWER CREDIT | (¤1,146.40) | 06/30/2023 |
| SEWER INSPECTION | ¤25.00 | 06/30/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/30/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/30/2023 |
| SITE PLAN 30 | ¤30.00 | 06/30/2023 |
| WATER- TURN ON | ¤25.00 | 06/30/2023 |
| ADJUSTMENT 50% | (¤366.24) | 06/30/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/30/2023 |
| INSPECTION - RESIDENTIAL | ¤547.25 | 06/30/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤155.22 | 06/30/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,198.61 |