I want to search for...
Permit #2023051490
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7013-00080-0160 |
| Block: 00080 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: (386)627-0927 |
| Location Address: 81 BREEZE HILL LN |
| Type: PO - POOL |
| Issue Date: 07/24/2023 |
| NOC: RECORDED |
| Applicant name: JASON BRET PAVLOW |
| Owner: BURFORD JOHN E & WENDY H&W |
|
Address 81 BREEZE HILL LANE PALM COAST, FL 32137 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤120,360.00 |
| Job Description: POOL/SCREEN |
| Type: CN |
Contractor
WATERSIDE POOLS INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST , FL 32137 |
#3K PALM COAST , FL 32137 |
CPC1457358 (Exp: 08/31/2026) | (386)447-3390 | (386)447-3391 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2026) | (386) 437-2966 | 386-437-5042 |
JOSEPH DEREK CARTWRIGHT
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
151 RODEO ROAD ORMOND BEACH, FL 32174 |
SCC131150000 (Exp: 08/31/2026) | 386-310-7962 | (386)615-3713 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 01/29/2024 | FINAL APPROVED | JSTEWART |
| POOL FINAL | 01/25/2024 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL INSPECTION | 01/23/2024 | APPROVED | TPOLACEK |
| Note: 01/23/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED _______________________________________________________________________________ 1/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO HAVE SOD ON ALL BARE AREAS IN THE ROADSIDE SWALE THAT DIED DURING THE CONSTRUCTION OF THE POOL ------------------------------------------------------------------------------------------ 1/5/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE SOD ON ALL BARE AREAS IN THE THE ROADSIDE SWALE THE SOD HAS DIED DURING THE CONSTRUCTION OF THE POOL ---------------------------------------------------------------------------------------------- 12/28/23 UPON WALKING PROPERTY DRAINAGE SHOULD WORK AS INDICATED. INSPECTORS NOTE: FRONT SWALE HAS LARGE SEDIMENT ILE BY RIGHT CULVERT END THAT NEEDS TO BE CLEANED OUT AND SOD NEEDS TO MATCH PRIOR AND EXISTING GRADES. RIGHT NOW THE SOD ELEVATION IS HIGHER THAN EXISTING GRADE AND IS HOLDING WATER. WILL APPROVE SURVEY BUT NOT THE FINAL. | |||
| ROW - FINAL INSPECTION | 01/09/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO HAVE SOD ON ALL BARE AREAS IN THE ROADSIDE SWALE THAT DIED DURING THE CONSTRUCTION OF THE POOL ------------------------------------------------------------------------------------------ 1/5/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE SOD ON ALL BARE AREAS IN THE THE ROADSIDE SWALE THE SOD HAS DIED DURING THE CONSTRUCTION OF THE POOL ---------------------------------------------------------------------------------------------- 12/28/23 UPON WALKING PROPERTY DRAINAGE SHOULD WORK AS INDICATED. INSPECTORS NOTE: FRONT SWALE HAS LARGE SEDIMENT ILE BY RIGHT CULVERT END THAT NEEDS TO BE CLEANED OUT AND SOD NEEDS TO MATCH PRIOR AND EXISTING GRADES. RIGHT NOW THE SOD ELEVATION IS HIGHER THAN EXISTING GRADE AND IS HOLDING WATER. WILL APPROVE SURVEY BUT NOT THE FINAL. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/05/2024 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 01/05/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE SOD ON ALL BARE AREAS IN THE THE ROADSIDE SWALE THE SOD HAS DIED DURING THE CONSTRUCTION OF THE POOL ---------------------------------------------------------------------------------------------- 12/28/23 UPON WALKING PROPERTY DRAINAGE SHOULD WORK AS INDICATED. INSPECTORS NOTE: FRONT SWALE HAS LARGE SEDIMENT ILE BY RIGHT CULVERT END THAT NEEDS TO BE CLEANED OUT AND SOD NEEDS TO MATCH PRIOR AND EXISTING GRADES. RIGHT NOW THE SOD ELEVATION IS HIGHER THAN EXISTING GRADE AND IS HOLDING WATER. WILL APPROVE SURVEY BUT NOT THE FINAL. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/28/2023 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12/28/23 UPON WALKING PROPERTY DRAINAGE SHOULD WORK AS INDICATED. INSPECTORS NOTE: FRONT SWALE HAS LARGE SEDIMENT ILE BY RIGHT CULVERT END THAT NEEDS TO BE CLEANED OUT AND SOD NEEDS TO MATCH PRIOR AND EXISTING GRADES. RIGHT NOW THE SOD ELEVATION IS HIGHER THAN EXISTING GRADE AND IS HOLDING WATER. WILL APPROVE SURVEY BUT NOT THE FINAL. | |||
| ELECTRIC AND ALARM | 11/28/2023 | APPROVED | JSTEWART |
| POOL DECK | 09/20/2023 | APPROVED | FWILLIS |
| Note: 9/18/2023 - PREVIOUS INSPECTION NOTES 9/18/23 previous notes not rectified. 9/14/2023 - PREVIOUS INSPECTION NOTES 9/14/2023- Previous notes not rectified....Please re dig footer to spec and reinforcement having 3" clearance from earth. footer needs to be re worked and dug out to create a footing base, sides our washed in creating slope please have footer to plans. please Tie reinforcement to chairs for displacement during pour. R608.5.4.1- Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system such that displacement will not occur during the concrete placement operation CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 9/13/2023 - PREVIOUS INSPECTION NOTES 9/13/23- do to weather, Please re dig footer to spec and reinforcement having 3" clearance from earth. (buried in spots) | |||
| POOL DECK | 09/18/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 9/18/23 previous notes not rectified. 9/14/2023 - PREVIOUS INSPECTION NOTES 9/14/2023- Previous notes not rectified....Please re dig footer to spec and reinforcement having 3" clearance from earth. footer needs to be re worked and dug out to create a footing base, sides our washed in creating slope please have footer to plans. please Tie reinforcement to chairs for displacement during pour. R608.5.4.1- Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system such that displacement will not occur during the concrete placement operation CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 9/13/2023 - PREVIOUS INSPECTION NOTES 9/13/23- do to weather, Please re dig footer to spec and reinforcement having 3" clearance from earth. (buried in spots) | |||
| POOL DECK | 09/14/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 9/14/2023- Previous notes not rectified....Please re dig footer to spec and reinforcement having 3" clearance from earth. footer needs to be re worked and dug out to create a footing base, sides our washed in creating slope please have footer to plans. please Tie reinforcement to chairs for displacement during pour. R608.5.4.1- Reinforcement shall be secured in the proper location in the forms with tie wire or other bar support system such that displacement will not occur during the concrete placement operation CLEARANCE ON REBAR FROM EARTH 3” FBC R404.1.2.3.7.4 9/13/2023 - PREVIOUS INSPECTION NOTES 9/13/23- do to weather, Please re dig footer to spec and reinforcement having 3" clearance from earth. (buried in spots) | |||
| POOL DECK | 09/13/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 9/13/23- do to weather, Please re dig footer to spec and reinforcement having 3" clearance from earth. (buried in spots) | |||
| STEEL AND GROUND | 08/15/2023 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/24/2023 | 07/27/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/24/2023 | 07/24/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/30/2023 | 05/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/30/2023 | 05/30/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/30/2023 | 05/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/30/2023 | 06/09/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/30/2023 | 05/30/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/22/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/08/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/19/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/14/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/24/2023 |
| SITE PLAN 30 | ¤30.00 | 07/24/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/24/2023 |
| SURCHARGE - FS 468.631 | ¤2.13 | 07/24/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 07/24/2023 |
| ADJUSTMENT 50% | (¤142.19) | 07/24/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/24/2023 |
| INSPECTION- POOL | ¤160.00 | 07/24/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤94.38 | 07/24/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤356.32 |