Permit #2023051493

Permit Details

Status: CANCEL

Parcel Id: 07-11-31-7065-00220-0110
Block: 00220
Subdivision: -
Job Phone: 386-234-9464
Location Address: 24 KALAMAZOO TR
Type: DR - DRIVEWAY
Issue Date: 06/05/2023
NOC: RECORDED
Applicant name: CYRUS BROWN
Owner: POGAS KATHY & STACY V TINGER JTWROS

Address

24 KALAMAZOO TRL

PALM COAST, FL 32164

Lot: 0110
Contracted Stated Job Value: ¤4,800.00
Job Description: 9 feet driveway extension with concrete
Type: CN

Contractor

FLAGLER FINISH & CONCRETE LLC
Status Location Address Mailing Address Phone
ACTIVE

101 PALM HARBOR PKWY

BUNNELL, FL 32110

#209A

PALM COAST, FL 32137

386-234-9464

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR) 07/13/2023 APPROVED FSLADISH
Note: 07/13/23 SITE PLAN MATCHES NOW. READY TO POUR. LOOKED GOOD AT THE TIME OF THIS INSPECTION ______________________________________________________________________________________________________________________ 6/6/2023 - PREVIOUS INSPECTION NOTES 1) Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material or five inches (5") on three inches (3") of limerock or shell base. 2) THE DRIVE EXSTENTION DONT MATCH WHATS ON THE SITE PLAN. SITE PLAN SHOW THE EXTENTION STOPING AT RIGHT OF WAY LINE.
ROW- PRE-APRON (PRE-POUR) 06/06/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material or five inches (5") on three inches (3") of limerock or shell base. 2) THE DRIVE EXSTENTION DONT MATCH WHATS ON THE SITE PLAN. SITE PLAN SHOW THE EXTENTION STOPING AT RIGHT OF WAY LINE.
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 06/15/2023 06/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 06/15/2023 06/23/2023
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 06/15/2023 06/15/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/30/2023 05/30/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 05/30/2023 06/02/2023
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 05/30/2023 05/30/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 06/26/2023
SW ENG RES REVIEW 200 ¤200.00 06/05/2023
SITE PLAN 15 ¤15.00 06/05/2023
ADJUSTMENT 50% (¤15.00) 06/05/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/05/2023
SW ENG INSPECTION 40 ¤40.00 06/05/2023
SW ENG PRE APRON ¤30.00 06/05/2023
Fees Total Due: ¤0.00 Total Paid: ¤330.00